Kerala Water Authority Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 8,300Document Cost
₹ 1,250Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_KWA_460758_1Bid Award Id
ViewTender No
10/2021-22/AEE/PHSTender Authority
Kerala Water Authority ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General conditions of E Tendering Process
BOQ Items
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating
each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soil (Ref. Item No. 2.10.1 of DSR)
475
-
579.85
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
190
-
28.82
Engaging Coolie
18
-
917.26
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).
75 mm nominal outer dia pipes.
950
-
90.86
Interconnecting the existing 110/90/75 mm PVC line with the newly laid 110/90/75 mm PVC pipe by cutting the existing 110/90/75 mm PVC pipe diametrically, the cut being diametrically perpendicular to the axis of pipe and smothering of cut ends, inserting suitable specials such as Tee/Saddle clamp /any other type supplied by the contractor and placing in position, jointing with solvent cement and testing to the required test pressure, including necessary earth work excavation, cost of specials supplied by the contractor, labour charges , and hire for tools etc; complete. Interconnecting with newly laid 110/90/75 mm PVC Pipe
4
-
1255.62
Interconnecting the existing 200/180/160/140mm PVC line with the newly laid 110/90/75 mm PVC pipe by cutting the existing 200/180/160/140 PVC pipe diametrically, the cut being diametrically perpendicular to the axis of pipe and smothering of cut ends, inserting suitable specials such as Tee/Saddle clamp /any other type supplied by the contractor and placing in position, jointing with solvent cement and testing to the required test pressure, including necessary earth work excavation, cost of specials supplied by the contractor, labour charges , and hire for tools etc; complete. Interconnecting with newly laid 110/90/75 mm PVC Pipe
2
-
1971.46
Part -II -Temporary Road Restoration
-
-
-
Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete
2
-
8405.11
Part III- Cost of Materials
-
-
-
Supply of uPVC Pipe, IS 4985: 2000 , 6kg/cm2, 75mm Dia..
950
-
144.6
Supplying 75 mm PVC bend (6 Kg/cm2)
10
-
108.43
Supplying 75 mm PVC Endcap (6 Kg/cm2)
4
-
46.52
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements