Kerala Water Authority Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 11,083Document Cost
₹ 980Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KWA_718505_1Tender No
WRD/KWA-CE(CR)/TR/3417/2024Tender Authority
Kerala Water Authority ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General conditions of E Tendering Process
BOQ Items
... More
100.98.140:Supply of HDPE Pipe PE 100 (IS 4984/1995), 8kg, 200mm Outer Dia.
36
1068
38474.28
... More
OD287161/2023-2024:Provision for specials for 200 mm HDPE pipe -10 % of cost of pipe
36
106
3847.32
... More
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
6
555
3333.24
... More
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
2
2045
4090.28
... More
OD287162/2023-2024:Cutting DI Pipe
2
692
1384.34
... More
OD287164/2023-2024:Trenching the river bed in liquid mud and ordinary soil for laying HDPE pipes up to depth about 1 m below average bed level using diving set and air compressors or using any other scientific method stocking the excavated soil at convenient place and refilling the trenches after laying pipes including all labour charges and hire for diving set, air compressor, all appliance and equipments, ,maintaining the depth of trench, laying pipes etc compllete
52
2214
115156.6
... More
OD287165/2023-2024:Laying 160 mm OD HDPE pipes under water including conveying within initial lead and aligning the pipes ,Electro fusion welding using automatic or semi automatic electro fusion machines, testing the pipes in line thus fabricated to suit the hydrolic working pressure and after testing ,aligning the pipe line ,lowering the pipe in position into the bed of the canal/Thodu,testing the line to suitable pressure with potable water after laying the pipe excluding cost of pip[e, all labour charge, hire for appliances etc complete but excluding cost of pipe fittings
36
340
12258.36
... More
OD287166/2023-2024:Laying 200 mm OD HDPE pipes under water including conveying within initial lead and aligning the pipes ,Electro fusion welding using automatic or semi automatic electro fusion machines, testing the pipes in line thus fabricated to suit the hydrolic working pressure and after testing ,aligning the pipe line ,lowering the pipe in position into the bed of the canal/Thodu,testing the line to suitable pressure with potable water after laying the pipe excluding cost of pip[e, all labour charge, hire for appliances etc complete but excluding cost of pipe fittings
36
394
14209.56
... More
100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete.
111.9
36
4132.47
... More
OD287167/2023-2024:Interconnecting the existing 160 mm PVC pipe with newly laid 160 mm HDPE pipe using collar joint including all labour charges
2
7985
15971.1
... More
OD287168/2023-2024:Interconnecting the existing 200 mm DI pipe with newly laid 200 mm HDPE pipe using collar joint including all labour charges
2
8301
16602.32
... More
OD287169/2023-2024:Supplying, conveying and casting RCC sleeves as per design with CC 1:2:4 using 20mm broken stone including hire for form work cost and conveyance of all materials, watering, curing etc complete.
62
2637
163538.02
... More
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
0.4
7990
3196.34
... More
OD290822/2023-2024:Dismantling existing pipe including all labour charges.
70
283
19815.6
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements