Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala Water Authority - KWA Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date19 Feb 2022
Closing Date28 Feb 2022
Tender Amount₹ 36,09,288 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

101.25

-

565.96

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 63 mm nominal outer dia pipes.

225

-

88.69

... More
Shifting house connection from existing PVC mains up to 160 mm dia upto a length of 5m using 20mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges but excluding cost of water meter and meter box and excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers.

5

-

3130.91

... More
Interconnection of existing PVC/AC/GI pipe line with newly laid PVC pipe line of various sizes using equal Tee, including charges of earthwork and refilling,all labour charges,material cost, Cost of CIR, hire charges etc. complete.

2

-

1711.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

11.25

-

8141.14

... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 63mm Dia.

225

-

154.05

... More
Kakkodu Ward

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

7.25

-

2083.58

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

480

-

28.36

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

192

-

565.96

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :" Ordinary Rock. (Ref. Item No. 2.13.1 of DSR)

40.75

-

821.93

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 75 mm nominal outer dia pipes.

480

-

88.69

... More
Interconnection of existing PVC/AC/GI pipe line with newly laid PVC pipe line of various sizes using equal Tee, including charges of earthwork and refilling,all labour charges,material cost, Cost of CIR, hire charges etc. complete.

2

-

1711.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

7.25

-

8141.14

... More
Supply of uPVC Pipe, IS 4985: 2000 , 8kg/cm2, 75mm Dia.

480

-

203.25

... More
Karakkad Ward

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

14.25

-

2083.58

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

285

-

28.36

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

128.25

-

565.96

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 75 mm nominal outer dia pipes.

285

-

88.69

... More
Interconnection of existing PVC/AC/GI pipe line with newly laid PVC pipe line of various sizes using equal Tee, including charges of earthwork and refilling,all labour charges,material cost, Cost of CIR, hire charges etc. complete.

1

-

1711.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

14.25

-

8141.14

... More
Supply of uPVC Pipe, IS 4985: 2000 , 8kg/cm2, 75mm Dia.

285

-

203.25

... More
Thumpodu Ward

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

10

-

2083.58

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

350

-

28.36

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

165

-

565.96

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 75 mm nominal outer dia pipes.

350

-

88.69

... More
Interconnection of existing PVC/AC/GI pipe line with newly laid PVC pipe line of various sizes using equal Tee, including charges of earthwork and refilling,all labour charges,material cost, Cost of CIR, hire charges etc. complete.

1

-

1711.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

10

-

8141.14

... More
Supply of uPVC Pipe, IS 4985: 2000 , 8kg/cm2, 75mm Dia.

350

-

203.25

... More
Vilakkuvettom

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

16.5

-

2083.58

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

380

-

28.36

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

133

-

565.96

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :" Ordinary Rock. (Ref. Item No. 2.13.1 of DSR)

40.5

-

821.93

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 63 mm nominal outer dia pipes.

380

-

88.69

... More
Interconnection of existing PVC/AC/GI pipe line with newly laid PVC pipe line of various sizes using equal Tee, including charges of earthwork and refilling,all labour charges,material cost, Cost of CIR, hire charges etc. complete.

3

-

1711.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

16.5

-

8141.14

... More
Supply of uPVC Pipe, IS 4985: 2000 , 8kg/cm2, 63mm Dia.

380

-

139.4

... More
Kalayanadu

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

4.5

-

2083.58

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

155.5

-

565.96

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 63 mm nominal outer dia pipes.

270

-

88.69

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."

50

-

88.69

... More
Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work50 mm dia nominal bore

60

-

677.85

... More
Supply 50mm GI bend at site

8

-

325.22

... More
Interconnection of existing PVC/AC/GI pipe line with newly laid PVC pipe line of various sizes using equal Tee, including charges of earthwork and refilling,all labour charges,material cost, Cost of CIR, hire charges etc. complete.

3

-

1711.1

... More
Shifting house connection from existing PVC mains up to 160 mm dia upto a length of 5m using 20mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges but excluding cost of water meter and meter box and excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers.

10

-

3130.91

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

4.95

-

8141.14

... More
Supply of uPVC Pipe, IS 4985: 2000 , 8kg/cm2, 63mm Dia.

270

-

139.4

... More
Supply of uPVC Pipe, IS 4985: 2000 , 8kg/cm2, 90mm Dia.

50

-

278.75

... More
Valacodu

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

5

-

2083.58

... More
Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road

45

-

367.73

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

65

-

565.96

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 75 mm nominal outer dia pipes.

140

-

88.69

... More
Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work50 mm dia nominal bore

80

-

677.85

... More
Interconnection of existing PVC/AC/GI pipe line with newly laid PVC pipe line of various sizes using equal Tee, including charges of earthwork and refilling,all labour charges,material cost, Cost of CIR, hire charges etc. complete.

2

-

1711.1

... More
Shifting the existing dismantled water supply service connections/ tap connections from old line to the new line by supplying and providing saddle piece of adequate size, 20 mm valve, 20 mm coupling, 20 mm CPVC pipes, 20 mm elbows and all other specials needed and connecting to the existing consumer aetc complete

2

-

1779.82

... More
Supply of uPVC Pipe, IS 4985: 2000 , 8kg/cm2, 75mm Dia.

140

-

203.25

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

5

-

8141.14

... More
Plachery

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

1

-

2083.58

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

200

-

565.96

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m Hard Rock(Requiring Blasting). (Ref. Item No. 2.13.2 of DSR)

49

-

1164.04

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 75 mm nominal outer dia pipes.

500

-

88.69

... More
Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. but excluding cost of pipes and fittings - External work. 65 mm dia nominal bore Data derived from item no.18.12.7 of DAR Data for 10 m

20

-

212.18

... More
Interconnection of existing PVC/AC/GI pipe line with newly laid PVC pipe line of various sizes using equal Tee, including charges of earthwork and refilling,all labour charges,material cost, Cost of CIR, hire charges etc. complete.

2

-

1711.1

... More
Supply of uPVC Pipe, IS 4985: 2000 , 8kg/cm2, 75mm Dia.

500

-

203.25

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1.77

-

8141.14

... More
Nellipally

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

19

-

2083.58

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

171

-

565.96

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

380

-

28.36

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 75 mm nominal outer dia pipes.

380

-

88.69

... More
Interconnection of existing PVC/AC/GI pipe line with newly laid PVC pipe line of various sizes using equal Tee, including charges of earthwork and refilling,all labour charges,material cost, Cost of CIR, hire charges etc. complete.

2

-

1711.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

19

-

8141.14

... More
Supply of uPVC Pipe, IS 4985: 2000 , 8kg/cm2, 75mm Dia.

380

-

203.25

... More
Ikkarakonam

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

5

-

2083.58

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

280.5

-

565.96

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :" Ordinary Rock. (Ref. Item No. 2.13.1 of DSR)

44.5

-

821.93

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

660

-

28.36

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 75 mm nominal outer dia pipes.

660

-

88.69

... More
Interconnection of existing PVC/AC/GI pipe line with newly laid PVC pipe line of various sizes using equal Tee, including charges of earthwork and refilling,all labour charges,material cost, Cost of CIR, hire charges etc. complete.

2

-

1711.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

5

-

8141.14

... More
Supply of uPVC Pipe, IS 4985: 2000 , 8kg/cm2, 75mm Dia.

660

-

203.25

... More
Kallar Ward

-

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

5

-

2083.58

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)

170

-

565.96

... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)

350

-

28.36

... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 75 mm nominal outer dia pipes.

350

-

88.69

... More
Interconnection of existing PVC/AC/GI pipe line with newly laid PVC pipe line of various sizes using equal Tee, including charges of earthwork and refilling,all labour charges,material cost, Cost of CIR, hire charges etc. complete.

1

-

1711.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

5

-

8141.14

... More
Supply of uPVC Pipe, IS 4985: 2000 , 8kg/cm2, 75mm Dia.

350

-

203.25

... More
Note: GST @ 18% of bill amount will be paid additionally.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.