Kerala Water Authority Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 3,100Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Deposit Work - 2021 - 22 - Thrikkunnapuzha Grama Panchayat - Pipe Line Extension From Aasari Parambu To Puhuval And Pipe Line Realignment In Thodu Portions At Veeppanchira Bridge Amp Valel Bridge For Solving Water Scarcity In Ward No 4 Of Tkn Panch
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_KWA_487731_1Bid Award Id
ViewTender No
KWA/01/2022-23/AEE/HPDTender Authority
Kerala Water Authority ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m
30
-
159.65
Bailing out water with 5 HP engine and pumpset including conveyance to the site, errection, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc. complete.
NEW DATA (Prepared based on PHED SDB - Item No.1070
67.14
-
38.57
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
72
-
90.86
"Laying HDPE pipes (IS : 4984)on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi automatic electrofusion machines, testing the pipe line thus fabricated to suit the hydrulic working pressure and after testing , aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and leveling the trenches including all labour charge, hire for appliances etc. complete but excluding cost of pipe and fittings. 90 mm OD HDPE pipe"
26
-
97.37
"Laying HDPE pipes (IS : 4984)on under water including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi automatic electrofusion machines, testing the pipe line thus fabricated to suit the hydrulic working pressure and after testing , aligning the pipeline, lowering the pipe in position under water, testing the line to suitable pressure with potable water including all labour charge, hire for appliances,country boat etc. complete but excluding cost of pipe and fittings. r|n 90 mm OD HDPE pipe"
55
-
128.81
Supplying precast reinforced cement concrete in moldings in cylindrical shapes suitable for 90 mm OD HDPE pipe having inner diameter 150 mm and outer diameter 270 mm and 400 mm long using C C 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size), providing reinforcement using TMT steel bars, watering and curing the blocks, conveying and inserting the precast molding in to the pipe while laying pipes in under water and ensuring pipes to be rest in bottom surface of river etc complete including cost andbrconveyance of all materials, hire charges of mold, watering and curing charges etc:complete but excluding laying charges of HDPE pipe as per the direction of engineer in charge.etc completebr
45
-
463.14
Jointing the newly laid 90mm HDEP line to the newly laid 90 mm PVC Pipe line or existing 90mm /75mm /63mm PVC line by inserting the 90mm CIR joint, 90 mm PVC Coupling /90X75mm / 90X63mm PVC Reducer or any other specials supplied by the contractor and placing in position , jointing with solvent cement and testing to the required test pressure including cost of all specials,all labour charges etc complete as per direction of departmental officers.
6
-
856.87
Jointng the newly laid 90mm PVC line to the existing 75/63mm PVC line by cutting the existing line diametrically, and smoothening the cut ends and inserting the 90x75 mm/ 90x 63mm PVC reducer or any other specials supplied by the contractor and placing in position , jointing with solvent cement and testing to the required test pressure including cost of all specials,all labour charges etc complete as per direction of departmental officers.
3
-
184.24
Supplying 90 mm PVC bend.
1
-
92.92
APPENDIX B :- COST OF MATERIALS
-
-
-
Supply of PE Pipe, PE100, PN10, 90mm dia, conforming to IS 4984/2016.
81
-
267.15
Supply of uPVC Pipe, IS 4985: 2000 , 6kg/cm2, 90mm Dia.
72
-
202.3
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements