Kerala Water Authority Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 2,760Tender Fee
Refer Documents
Summary
State Plan 2023 24 Construction Renovation Of Civil Structures Owned By Kwa Wss To Kannur And Adjoining Panchayath Strengthening Work Of Water Tank At Thana General Civil Work
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KWA_693682_1Tender No
WRD/KWA-CE(NR)/TR/2268/2023_5Tender Authority
Kerala Water Authority ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General conditions of E Tendering Process
BOQ Items
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
13.72
-
-
100.37.3:Welding M.S. sheet, pipe and special by gas or electric plant for three run welding including cost of welding rod / gas, all labour and hire charges of tools etc., complete.
2400
-
-
15.5:Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge.
137.2
-
-
13.65.1:Painting with black anti- corrosive bitumastic paint of approved brand and manufacture to give an even shade:Two or more coats on new work
137.2
-
-
26.38.2:Shotcreting R.C.C. columns, beams and slabs etc. in layers with approved
design mix concrete having the specified minimum characteristic compressive
strength [with ordinary portland cement, coarse sand and graded stone
aggregate of 10 mm maximum size in proportion as per design criteria]
including the cost of centering and shuttering at edges and corners etc. as
directed by Engineer- in-Charge
Note: Rates shall include the providing necessary ground wires etc. The
levelling gauges, if used, shall be paid for separately. Payment under this item
shall be made only after proper wet curing has been done and surface has
been satisfactorily evaluated by sounding/tapping with a blunt metal
instrument.50mm thick in Grade M 25 with cement content not less than 330 kg per cum
125.7
-
-
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
155.87
-
-
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
7599.92
-
-
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
171.3
-
-
5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
23.26
-
-
5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
23.99
-
-
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
11.88
-
-
15.10.2:Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge:In cement mortar
9
-
-
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
9
-
-
13.7.2:12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
241.2
-
-
13.85.3:Applying priming coats with primer of approved brand and manufacture, having low VOC ( Volatile Organic Compound) content.With water thinnable cement primer on walls surface having VOC content less than 50 grams / litre
241.2
-
-
13.82.2:Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 grams/ litre, of approved brand and manufacture including applying additional coats wherever required, to achieve even shade and colour.Two coats
181.2
-
-
100.98.1008:Engaging Coolie.
4
-
-
14.85:Taking out existing wooden door shutter, repair by cutting, painting etc. and refixing of repaired door shutters to existing door frames, including replacement of hinges with screws, etc. as required, all complete as per the direction of the Engineer-in-charge.
2
-
-
21.8.1:Filling the gap in between aluminium frame & adjacent RCC/ Brick / Stone work by providing weather silicon sealant over backer rod of approved quality as per architectural drawing and direction of Engineer-in -Charge complete.Upto 5 mm depth and 5 mm width
4.25
-
-
OD232593/2022-2023:Providing all safety measures, hire for equipment for support jack, props, etc complete ( rent upto 14 days)
2128
-
-
22.23.1:Providing and applying integral crystalline slurry of hydrophilic in nature for
waterproofing treatment to the RCC structures like retaining walls of the basement,
water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels
/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts
integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts
integral crystalline slurry : 1 part water) for horizontal surfaces and applying the
same from negative (internal) side with the help of synthetic fiber brush. The material
shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing
permeability of concrete by more than 90% compared with control concrete as per
DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline
slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work
shall be carried out all complete as per specification and the direction of the engineerin-
charge. The product performance shall carry guarantee for 10 years against any
leakage.For vertical surface two coats @0.70 kg per sqm
550
-
-
22.23.2:Providing and applying integral crystalline slurry of hydrophilic in nature for
waterproofing treatment to the RCC structures like retaining walls of the basement,
water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels
/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts
integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts
integral crystalline slurry : 1 part water) for horizontal surfaces and applying the
same from negative (internal) side with the help of synthetic fiber brush. The material
shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing
permeability of concrete by more than 90% compared with control concrete as per
DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline
slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work
shall be carried out all complete as per specification and the direction of the engineerin-
charge. The product performance shall carry guarantee for 10 years against any
leakage.For horizontal surface one coat @1.10 kg per sqm.
736
-
-
5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum).
47.25
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements