Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 5,900Document Cost
₹ 896Tender Fee
Refer Documents
Summary
Jal Jeevan Mission (jjm) -alappuzha District Providing Functional House Hold Tap Connection (fhtc) In Thuravoor Panchayath And Allied Work- Balance Work For Extending Distribution Line.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_KWA_460333_1Bid Award Id
ViewTender No
07/2021-22/AEE/PHSTender Authority
Kerala Water Authority ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General conditions of E Tendering Process
BOQ Items
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating
each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soil (Ref. Item No. 2.10.1 of DSR)
302.5
-
579.85
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
125
-
28.82
Engaging Coolie
5
-
917.26
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).
75 mm nominal outer dia pipes.
425
-
90.86
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).
110 mm nominal outer dia pipes.
150
-
133.89
Interconnecting the newly laid 75 mm PVC line with the existing 315 mm PVC pipe by cutting the existing PVC line diametrically, the cut being diametrically perpendicular to the axis of pipe and smoothing of cut ends, inserting suitable Tee and specials supplied by the contractor and placing in position, joining with solvent cement and testing to the required test pressure, including necessary earth work excavation, cost of specials supplied by the contractor,labour charges and hire for tools etc.,complete
2
-
2881.72
Interconnecting the existing 110/90/75 mm PVC line with the newly laid 110/90/75 mm PVC pipe by cutting the existing 110/90/75 mm PVC pipe diametrically, the cut being diametrically perpendicular to the axis of pipe and smothering of cut ends, inserting suitable specials such as Tee/Saddle clamp /any other type supplied by the contractor and placing in position, jointing with solvent cement and testing to the required test pressure, including necessary earth work excavation, cost of specials supplied by the contractor, labour charges , and hire for tools etc; complete. Interconnecting with newly laid 110/90/75 mm PVC Pipe
2
-
1255.62
Drilling suitable holes in reinforced or plain cement concrete with power driven
drill machine to a minimum depth of 100mm upto 200mm in RCC beams, lintels,
columns and slabs to introduce steel bars for sunshades/balconies including
fixing the steel bars in position using epoxy resin anchor grout of approved
make but excluding the cost of reinforcement, all complete as per direction of
Engineer-In-Charge.Upto and including 12mm dia.
72
-
138.91
Part -IV -Temporary Road Restoration
-
-
-
Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete
2.25
-
8405.11
Part II- Cost of Materials
-
-
-
Supply of uPVC Pipe, IS 4985: 2000 , 6kg/cm2, 75mm Dia..
425
-
144.6
Supplying 75 mm PVC End cap (6 Kg/cm2)
3
-
46.52
Supplying 75 mm PVC bend (6 Kg/cm2)
10
-
108.43
Supply of uPVC Pipe, IS 4985: 2000 , 6kg/cm2, 110mm Dia.
150
-
291.8
Supply of 110mm PVC bend 6Kg/cm2
4
-
241.82