Kerala Water Authority Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala Water Authority - KWA Tender
Civil And Construction
Drainage Work
Pipe Line Project
Eprocure
Opening Date26 Feb 2022
Closing Date8 Mar 2022
Tender Amount₹ 3,72,883 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 9,350Document Cost
₹ 750Tender Fee
Refer Documents
Summary
Kdp Vechoocira Grama Panchayath Rwss To Kollamula
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_KWA_478161_1Bid Award Id
ViewTender No
105(Rt)/2021-2022/EE/PH/PTATender Authority
Kerala Water Authority ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General conditions of E Tendering Process
BOQ Items
... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).
75 mm nominal outer dia pipes.
140
-
88.14
... More
Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work65 mm dia nominal bore
48
-
853.4
... More
Making connection of G.I. distribution branch with G.I main of following sizes by providing and fixing tee, including cutting and threading the pipe etc. complete:50 to 80 mm nominal bore
1
-
1707.61
... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
3.75
-
1278.65
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
3.75
-
8091.05
... More
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :65 mm nominal bore
1
-
1773.58
... More
Supplying and fitting in position 75 mm PVC End cap in position
1
-
102.21
... More
Cost of materials
-
-
-
... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 75mm Dia.
140
-
226.35
... More
Reach 5 - Ward 6 Santhoshkavala - Semitheripadi - Punjab colony road
-
-
-
... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating
each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soil (Ref. Item No. 2.10.1 of DSR)
51
-
562.48
... More
Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
102
-
28.24
... More
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).
75 mm nominal outer dia pipes.
102
-
88.14
... More
Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work65 mm dia nominal bore
120
-
853.4
... More
Making connection of G.I. distribution branch with GI Main of following sizes by providing and fixing tee, including cutting and threading the pipe etc. complete : 15mm & 20 mm nominal bore
Observed Data derived from item no.18.13.1).of DAR
1
-
737.45
... More
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :65 mm nominal bore
1
-
1773.58
... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
3.75
-
1278.65
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.02
-
8091.05
... More
Supplying and fitting in position 75 mm PVC End cap in position
1
-
102.21
... More
Cost of materials
-
-
-
... More
Supply of uPVC Pipe, IS 4985: 2000 , 10kg/cm2, 75mm Dia.
102
-
226.35
... More
Note:-An Amount of Rs.457.77/- is included in PWD Road restoration charges for berm Cutting.