Kerala Water Authority Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala Water Authority - KWA Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date21 Feb 2022
Closing Date28 Feb 2022
Tender Amount₹ 11,36,459 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 28,500Document Cost
₹ 2,300Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_KWA_476651_1Bid Award Id
ViewTender No
137/2021-22/EE/PH/PTATender Authority
Kerala Water Authority ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General conditions of E Tendering Process
BOQ Items
... More
Leak rectification work in 110 -140 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earthwork excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concretecutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damagesto the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends,conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning thepipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairablejoint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed andrefilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming,watering, charges for removing surplus soil from work site without causing any damages to the existingutilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providingcaution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction ofDepartmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVCPipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing.
40
-
2864.5
... More
Leak rectification work in 160 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing.
10
-
3586.36
... More
Repairing leakage/breakage of 80-100 mm AC pipe line by cutting and dismantling the damaged pipe portion(up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cuttingfor exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting newAC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operatingthe valves concerned, and rectifying the defects any noticed and without causing any damages to theexisting utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removing surplus soil from worksite, including hire for tools and plant, conveyance of tools and materials, bailing out water, providingcaution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction ofDepartmental officers excluding the cost of pipe and CID Joints.
25
-
3097.3
... More
Repairing leakage/breakage of 125-150 mm AC pipe line by cutting and dismantling the damaged pipe portion(up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cuttingfor exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting newAC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operatingthe valves concerned, and rectifying the defects any noticed and without causing any damages to theexisting utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removing surplus soil from worksite, including hire for tools and plant, conveyance of tools and materials, bailing out water, providingcaution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction ofDepartmental officers excluding the cost of pipe and CID Joints.
40
-
3721.06
... More
Repairing leakage/breakage of 200-250 mm AC pipe line by cutting and dismantling the damaged pipe portion(up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cuttingfor exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting newAC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operatingthe valves concerned, and rectifying the defects any noticed and without causing any damages to theexisting utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removing surplus soil from worksite, including hire for tools and plant, conveyance of tools and materials, bailing out water, providingcaution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction ofDepartmental officers excluding the cost of pipe and CID Joints.
25
-
5135.77
... More
Repairing leakage/breakage of 80 to 100 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 5.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.
3
-
6255.49
... More
Repairing leakage/breakage of 125-150 mm AC pipe line by cutting and dismantling the damaged pipe portion(up to 5.0m) including charges for earth work excavation in all kinds of soil including tar / concrete cuttingfor exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting newAC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operatingthe valves concerned, and rectifying the defects any noticed and without causing any damages to theexisting utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removing surplus soil from worksite, including hire for tools and plant, conveyance of tools and materials, bailing out water, providingcaution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction ofDepartmental officers excluding the cost of pipe and CID Joints.
2
-
7262.16
... More
Repairing leakage/breakage of 200-250 mm AC pipe line by cutting and dismantling the damaged pipe portion(up to 5.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cuttingfor exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting newAC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operatingthe valves concerned, and rectifying the defects any noticed and without causing any damages to theexisting utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removing surplus soil from worksite, including hire for tools and plant, conveyance of tools and materials, bailing out water, providingcaution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction ofDepartmental officers excluding the cost of pipe and CID Joints.
2
-
9424.36
... More
Rectification of joint leakages in 80- 100 mm CI Pipe including earth work excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc. complete, but excluding the cost of pig lead.
2
-
2940.32
... More
Rectification of joint leakages in 125- 150 mm CI Pipe including earth work excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc. complete, but excluding the cost of pig lead.
7
-
3549.42
... More
Rectification of joint leakages in 200-250 mm CI Pipe including earth work excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc. complete, but excluding the cost of pig lead.
2
-
4603.55
... More
Rectification of breakages up to 2.0 m length in 80 -100 mm CI Pipes , including earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing and stacking the damaged portion from the existing line without causing any damages to the line and specials and replacing with the CI pipe with Collar and jointing with hemp & lead after cleaning the ends centering the pipe,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire & conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion and as per the direction of departmental officers etc. complete, but excluding the cost of pipes, collar and pig lead. Add Specification Below
2
-
6594.22
... More
Rectification of breakages up to 2.0 m length in 125-150 mm CI Pipes , including earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing and stacking the damaged portion from the existing line without causing any damages to the line and specials and replacing with the CI pipe with Collar and jointing with hemp & lead after cleaning the ends centering the pipe,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire & conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion and as per the direction of departmental officers etc. complete, but excluding the cost of pipes, collar and pig lead. DeleteAdd Specification Below
2
-
8435.74
... More
Rectification of breakages up to 2.0 m length in 200-250 mm CI Pipes , including earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing and stacking the damaged portion from the existing line without causing any damages to the line and specials and replacing with the CI pipe with Collar and jointing with hemp & lead after cleaning the ends centering the pipe,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire & conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion and as per the direction of departmental officers etc. complete, but excluding the cost of pipes, collar and pig lead. DeleteAdd Specification Below
1
-
11669.38
... More
Rectification of leakages of 32 mm, 40mm & 50mm GI Pipes by replacing lengths up to 1.0m including earth work excavation in all kindss of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.
2
-
2214.03
... More
Rectification of leakages of 65 mm to 80mm GI Pipes by replacing lengths up to 1.0m including earth work excavation in all kindss of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.
2
-
3344.37
... More
Rectification of leakages of 100 mm GI Pipes by replacing lengths up to 1.0m including earth work excavation in all kindss of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.
2
-
3649.01
... More
Rectification of leakages of 65-80 mm GI Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.
4
-
1656.91
... More
Rectification of leakages of 100,125 & 150 mm GI Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.
2
-
2437.11
... More
Supplying and fixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for tools and as per the direction of the department officers etc complete.
50
-
131.78
... More
Rectifying the leakages in boring point / Vertical pipe of public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete.
15
-
1204.92
... More
Repairing 80/100/125mm sluice valve in existing line including necessary trenching for exposing the valve, removing the vertical end, dismantling the top cover, spindle shutter and cleaning the same, inside pipe, resetting the valve and providing the gland packing and refixing etc. complete as directed including cost of all materials, sundries, IR sheet, nut bolt and labour charges
3
-
1416.02
... More
Repairing 150/200/250 mm sluice valve in existing line including necessary trenching for exposing the valve, removing the vertical end, dismantling the top cover, spindle shutter and cleaning the same, inside pipe, resetting the valve and providing the gland packing and refixing etc. complete as directed including cost of all materials, sundries, IR sheet, nut bolt and labour charges
3
-
1622.69
... More
Conveyance of bleaching powder from Division store to various pump houses including loading and unloading, head loading to pump houses, hire charges for vehicles etc. complete as directed
4
-
2650.72
... More
Engaging Mazdoor for additional works such as Tank washing, Cleaning & Clearing the Pump houses & Premises , unexpected works etc which are not included in the estimate including hire for his tools, wages etc., complete on an emergency situation as per the direction of departmental officers
15
-
889.8
... More
Engaging Fitter for additional works such as Disconnection, unexpected works etc which are not included in the estimate including hire for his tools, wages etc., complete on an emergency situation as per the direction of departmental officers
15
-
1176.84
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
6.93
-
8091.05
... More
Supplying quarry muck/red earth at site and spreading the trenches as per the direction ofbrdepartmental officers.br
11.55
-
592.63
... More
Supplying of GSB at site and spreading the trenches as per direction of departmental officers
9.24
-
3080
... More
Supplying ASTM pipe 80 schedule for additional length required for street tap/urgent repairing /replacing works for service lines connected with KWA pipe line works/shifting due to existing line damaged as per direction of departmental officers.
30
-
90.13
... More
Supplying 90/110 m.m PVC valve heavy duty for fixing in line for control the flow ofbrwater/closing for leak rectification works
5
-
813.05
... More
Supplying 63/75 m.m PVC valve heavy duty for fixing in line for control the flow ofbrwater/closing for leak rectification work
5
-
464.6
... More
Supplying 32/40 m.m PVC valve heavy duty for fixing in line for control the flow ofbrwater/closing for leak rectification works
5
-
209.07
... More
Supplying 80mm CID/90mm CIR joint with nut& bolt,Rubber ring etc
20
-
419
... More
Supplying 100mm CID/110mm CIR joint
25
-
504
... More
Supplying 125 mm CID joints with rubber ring and nut bolts, including cost of all materials etc., complete
12
-
632
... More
Supplying 150 mm CID joints with rubber ring and nut bolts, including cost of all materials etc., complete
36
-
782
... More
Supplying 200 mm CID joints with rubber ring and nut bolts, including cost of all materials etc., complete
30
-
1179
... More
Supplying 250 mm CID/250 mm CIR joints with rubber ring and nut bolts, including cost of all materials etc., complete at the site.
6
-
1503
... More
Supply of pig lead/lead wool.
50
-
247.15
... More
Supply of Hemp
10
-
98.85
... More
Supplying 160x90/45/22.5 PVC bend/160x160x160/140/110 PVC Tee 10 kg at the site
6
-
1393.8
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements