Kerala State Housing Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 3,098Tender Fee
Refer Documents
Summary
Kshb Kiifb Works Hvac Works For The Development Of Government Taluk Hospital Kayamkulam Alappzuha District
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_KSHB_628977_2Tender No
2023_CE_KSHB_27(Ele)Tender Authority
Kerala State Housing Board ViewPurchaser Address
-Website
http://http://www.kshb.kerala.gov.in/kshb/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
od162561/2023_2024 : AHUs:Supply, store, installation, testing & commissioning of Ceiling suspended double skin Air Handling Units with thermal break profile with a minimum panel thickness of 40 mm or more , AHRI / Eurovent certified unit complete with cooling coil( DX cooling coil) ,DIDW centrifugal fan with IE3 motor with minimum W/cfm, VFD with enclosure box ( IP 21 rated for indoor and IP 55 rated for out door applications). The VFDs must have active harmonic filters to limit the harmonic distortion to limit the harmonic distortion as per IEEE standards , cleanable fabric filters of MERV 8 and fine filters of MERV 14, strip heaters of following capacity condensate drain pan, coil piping connections, condensate drain connections, mixing box with dampers inbuilt flexible duct connectors. The fan should deliver the design cfm at 50 Hz or lower. The electrical power wiring from the Isolator to the unit upto 5m shall be included.Isolator shall be in electrical contractors scope. HVAC contractor to check the ahu room/location sizes during the AHU selections/sizing, and shall strictly follow the AHU room/location sizing, as no changes whatsoever shall be acceptable. Air balancing to be done as per the approved shop drawings at the time of commissioning. The AHUs should meet the sound pressure levels recommended by ASHRAE. The system shall be complete in all respects of commissioning.The supplier should visit the site before procurement and shall confirm the suitability of the particular unit for particular area and confirm the external static pressure after checking the drawings. The supplier also should vouch for the performance guarranty.9.5 TR,4750 CFM, 20 mm ESP, 6 RD, 14.5kw Strip Heater, with mixing box (Surg ICU)
1
-
-
od162562/2023_2024 : AHUs:Supply, store, installation, testing & commissioning of Ceiling suspended double skin Air Handling Units with thermal break profile with a minimum panel thickness of 40 mm or more , AHRI / Eurovent certified unit complete with cooling coil( DX cooling coil) ,DIDW centrifugal fan with IE3 motor with minimum W/cfm, VFD with enclosure box ( IP 21 rated for indoor and IP 55 rated for out door applications). The VFDs must have active harmonic filters to limit the harmonic distortion to limit the harmonic distortion as per IEEE standards , cleanable fabric filters of MERV 8 and fine filters of MERV 14, strip heaters of following capacity condensate drain pan, coil piping connections, condensate drain connections, mixing box with dampers inbuilt flexible duct connectors. The fan should deliver the design cfm at 50 Hz or lower. The electrical power wiring from the Isolator to the unit upto 5m shall be included.Isolator shall be in electrical contractors scope. HVAC contractor to check the ahu room/location sizes during the AHU selections/sizing, and shall strictly follow the AHU room/location sizing, as no changes whatsoever shall be acceptable. Air balancing to be done as per the approved shop drawings at the time of commissioning. The AHUs should meet the sound pressure levels recommended by ASHRAE. The system shall be complete in all respects of commissioning.The supplier should visit the site before procurement and shall confirm the suitability of the particular unit for particular area and confirm the external static pressure after checking the drawings. The supplier also should vouch for the performance guarranty.8 TR,3850 CFM, 20 mm ESP, 6 RD, 12kw Strip Heater, with mixing box (Surg ICU)
2
-
-
od162563/2023_2024 : "AHUs:Supply, store, installation, testing & commissioning of Ceiling suspended double skin Air Handling Units with thermal break profile with a minimum panel thickness of 40 mm or more , AHRI / Eurovent certified unit complete with cooling coil( DX cooling coil) ,DIDW centrifugal fan with IE3 motor with minimum W/cfm, VFD with enclosure box ( IP 21 rated for indoor and IP 55 rated for out door applications). The VFDs must have active harmonic filters to limit the harmonic distortion to limit the harmonic distortion as per IEEE standards , cleanable fabric filters of MERV 8 and fine filters of MERV 14, strip heaters of following capacity condensate drain pan, coil piping connections, condensate drain connections, mixing box with dampers inbuilt flexible duct connectors. The fan should deliver the design cfm at 50 Hz or lower. The electrical power wiring from the Isolator to the unit upto 5m shall be included.Isolator shall be in electrical contractors scope. HVAC contractor to check the ahu room/location sizes during the AHU selections/sizing, and shall strictly follow the AHU room/location sizing, as no changes whatsoever shall be acceptable. Air balancing to be done as per the approved shop drawings at the time of commissioning. The AHUs should meet the sound pressure levels recommended by ASHRAE. The system shall be complete in all respects of commissioning.The supplier should visit the site before procurement and shall confirm the suitability of the particular unit for particular area and confirm the external static pressure after checking the drawings. The supplier also should vouch for the performance guarranty."6.5 TR,2000 CFM, 20 mm ESP, 6 RD, 10 kw Strip Heater, with mixing box (Minor OT)
1
-
-
od162564/2023_2024 : "AHUs:Supply, store, installation, testing & commissioning of Ceiling suspended double skin Air Handling Units with thermal break profile with a minimum panel thickness of 40 mm or more , AHRI / Eurovent certified unit complete with cooling coil( DX cooling coil) ,DIDW centrifugal fan with IE3 motor with minimum W/cfm, VFD with enclosure box ( IP 21 rated for indoor and IP 55 rated for out door applications). The VFDs must have active harmonic filters to limit the harmonic distortion to limit the harmonic distortion as per IEEE standards , cleanable fabric filters of MERV 8 and fine filters of MERV 14, strip heaters of following capacity condensate drain pan, coil piping connections, condensate drain connections, mixing box with dampers inbuilt flexible duct connectors. The fan should deliver the design cfm at 50 Hz or lower. The electrical power wiring from the Isolator to the unit upto 5m shall be included.Isolator shall be in electrical contractors scope. HVAC contractor to check the ahu room/location sizes during the AHU selections/sizing, and shall strictly follow the AHU room/location sizing, as no changes whatsoever shall be acceptable. Air balancing to be done as per the approved shop drawings at the time of commissioning. The AHUs should meet the sound pressure levels recommended by ASHRAE. The system shall be complete in all respects of commissioning.The supplier should visit the site before procurement and shall confirm the suitability of the particular unit for particular area and confirm the external static pressure after checking the drawings. The supplier also should vouch for the performance guarranty."7.5 TR,3850 CFM, 20 mm ESP, 6 RD, 12kw Strip Heater, with mixing box (Stepdown ICU)
1
-
-
od162565/2023_2024 : Supply, Installation testing and commissioning of Ducted type split/package air cooled Air-conditioners each complete with air cooled condenser and evaporator with copper tubes, GSS casing, filters, cooling coils, fan motors, control wiring, refrigerant controls and accessories, including MICROPROCESSOR CONTROL with indication lamps for the operation of the system with thermostat fixed in the respective rooms to adjust the temperature according to the equipments requirements with Micro- processor control panel for each machine. Bidder to elaborate the features of Microprocessor panel.This shall facilitate all functions such as ON / OFF thermostat to compressor control, fan interlocks, HP/LP & AFT controls etc. The remote control for the unit shall be considered. The refrigerant shall be ecofriendly like R410a, R407c,R32 etc.The power cabling from local isolator / panel , to the machine shall be considered along with this line item.The control wiring between indoor unit and out door unit shall not be considered under this lineitem. Length of power cabling shall be inferred from the drawings. The system shall be complete with all respects of commissioning. The supplier should visit the site before procurement and shall confirm the suitability of the particular unit for particular area and confirm the external static pressure after checking the drawings. The supplier also should vouch for the performance guaranty.2TR, 800 CFM (Audiometry)
1
-
-
od162566/2023_2024 : Supply, Installation testing and commissioning of Ducted type split/package air cooled Air-conditioners each complete with air cooled condenser and evaporator with copper tubes, GSS casing, filters, cooling coils, fan motors, control wiring, refrigerant controls and accessories, including MICROPROCESSOR CONTROL with indication lamps for the operation of the system with thermostat fixed in the respective rooms to adjust the temperature according to the equipments requirements with Micro- processor control panel for each machine. Bidder to elaborate the features of Microprocessor panel.This shall facilitate all functions such as ON / OFF thermostat to compressor control, fan interlocks, HP/LP & AFT controls etc. The remote control for the unit shall be considered. The refrigerant shall be ecofriendly like R410a, R407c,R32 etc.The power cabling from local isolator / panel , to the machine shall be considered along with this line item.The control wiring between indoor unit and out door unit shall not be considered under this lineitem. Length of power cabling shall be inferred from the drawings. The system shall be complete with all respects of commissioning. The supplier should visit the site before procurement and shall confirm the suitability of the particular unit for particular area and confirm the external static pressure after checking the drawings. The supplier also should vouch for the performance guaranty.3TR, 1200 CFM (ECG)
1
-
-
od162567/2023_2024 : Supply, Installation testing and commissioning of Ducted type split/package air cooled Air-conditioners each complete with air cooled condenser and evaporator with copper tubes, GSS casing, filters, cooling coils, fan motors, control wiring, refrigerant controls and accessories, including MICROPROCESSOR CONTROL with indication lamps for the operation of the system with thermostat fixed in the respective rooms to adjust the temperature according to the equipments requirements with Micro- processor control panel for each machine. Bidder to elaborate the features of Microprocessor panel.This shall facilitate all functions such as ON / OFF thermostat to compressor control, fan interlocks, HP/LP & AFT controls etc. The remote control for the unit shall be considered. The refrigerant shall be ecofriendly like R410a, R407c,R32 etc.The power cabling from local isolator / panel , to the machine shall be considered along with this line item.The control wiring between indoor unit and out door unit shall not be considered under this lineitem. Length of power cabling shall be inferred from the drawings. The system shall be complete with all respects of commissioning. The supplier should visit the site before procurement and shall confirm the suitability of the particular unit for particular area and confirm the external static pressure after checking the drawings. The supplier also should vouch for the performance guaranty.3.5TR, 1400 CFM (USG)
1
-
-
od162568/2023_2024 : Supply, Installation testing and commissioning of Ducted type split/package air cooled Air-conditioners each complete with air cooled condenser and evaporator with copper tubes, GSS casing, filters, cooling coils, fan motors, control wiring, refrigerant controls and accessories, including MICROPROCESSOR CONTROL with indication lamps for the operation of the system with thermostat fixed in the respective rooms to adjust the temperature according to the equipments requirements with Micro- processor control panel for each machine. Bidder to elaborate the features of Microprocessor panel.This shall facilitate all functions such as ON / OFF thermostat to compressor control, fan interlocks, HP/LP & AFT controls etc. The remote control for the unit shall be considered. The refrigerant shall be ecofriendly like R410a, R407c,R32 etc.The power cabling from local isolator / panel , to the machine shall be considered along with this line item.The control wiring between indoor unit and out door unit shall not be considered under this lineitem. Length of power cabling shall be inferred from the drawings. The system shall be complete with all respects of commissioning. The supplier should visit the site before procurement and shall confirm the suitability of the particular unit for particular area and confirm the external static pressure after checking the drawings. The supplier also should vouch for the performance guaranty.4.5TR, 1800 CFM (Resuscitation)
2
-
-
od162570/2023_2024 : Supply, Installation testing and commissioning of Ducted type split/package air cooled Air-conditioners each complete with air cooled condenser and evaporator with copper tubes, GSS casing, filters, cooling coils, fan motors, control wiring, refrigerant controls and accessories, including MICROPROCESSOR CONTROL with indication lamps for the operation of the system with thermostat fixed in the respective rooms to adjust the temperature according to the equipments requirements with Micro- processor control panel for each machine. Bidder to elaborate the features of Microprocessor panel.This shall facilitate all functions such as ON / OFF thermostat to compressor control, fan interlocks, HP/LP & AFT controls etc. The remote control for the unit shall be considered. The refrigerant shall be ecofriendly like R410a, R407c,R32 etc.The power cabling from local isolator / panel , to the machine shall be considered along with this line item.The control wiring between indoor unit and out door unit shall not be considered under this lineitem. Length of power cabling shall be inferred from the drawings. The system shall be complete with all respects of commissioning. The supplier should visit the site before procurement and shall confirm the suitability of the particular unit for particular area and confirm the external static pressure after checking the drawings. The supplier also should vouch for the performance guaranty.5TR, 2000 CFM (Post Operative ward)
1
-
-
od162571/2023_2024 : Supply, Installation testing and commissioning of Ducted type split/package air cooled Air-conditioners each complete with air cooled condenser and evaporator with copper tubes, GSS casing, filters, cooling coils, fan motors, control wiring, refrigerant controls and accessories, including MICROPROCESSOR CONTROL with indication lamps for the operation of the system with thermostat fixed in the respective rooms to adjust the temperature according to the equipments requirements with Micro- processor control panel for each machine. Bidder to elaborate the features of Microprocessor panel.This shall facilitate all functions such as ON / OFF thermostat to compressor control, fan interlocks, HP/LP & AFT controls etc. The remote control for the unit shall be considered. The refrigerant shall be ecofriendly like R410a, R407c,R32 etc.The power cabling from local isolator / panel , to the machine shall be considered along with this line item.The control wiring between indoor unit and out door unit shall not be considered under this lineitem. Length of power cabling shall be inferred from the drawings. The system shall be complete with all respects of commissioning. The supplier should visit the site before procurement and shall confirm the suitability of the particular unit for particular area and confirm the external static pressure after checking the drawings. The supplier also should vouch for the performance guaranty.5.5TR, 2200 CFM (Pharmacy Store)
1
-
-
od162573/2023_2024 : Supply, Installation testing and commissioning of Ducted type split/package air cooled Air-conditioners each complete with air cooled condenser and evaporator with copper tubes, GSS casing, filters, cooling coils, fan motors, control wiring, refrigerant controls and accessories, including MICROPROCESSOR CONTROL with indication lamps for the operation of the system with thermostat fixed in the respective rooms to adjust the temperature according to the equipments requirements with Micro- processor control panel for each machine. Bidder to elaborate the features of Microprocessor panel.This shall facilitate all functions such as ON / OFF thermostat to compressor control, fan interlocks, HP/LP & AFT controls etc. The remote control for the unit shall be considered. The refrigerant shall be ecofriendly like R410a, R407c,R32 etc.The power cabling from local isolator / panel , to the machine shall be considered along with this line item.The control wiring between indoor unit and out door unit shall not be considered under this lineitem. Length of power cabling shall be inferred from the drawings. The system shall be complete with all respects of commissioning. The supplier should visit the site before procurement and shall confirm the suitability of the particular unit for particular area and confirm the external static pressure after checking the drawings. The supplier also should vouch for the performance guaranty.
1
-
-
od162575/2023_2024 : Supply, Installation ,Testing & commissioning of Condensing unit with R-410A /R 407C/ R32gas. It should be complete with inverter type scroll compressor, air cooled condenser including MICRO-PROCESSOR CONTROL with indication lamps, remote control, temperature controller, and sensors along with the control box, its transformer, relays, necessary power and control wiring between the thermostat, controller, and the communication cabling between the out door and temp.controller , All the fittings associated with the unit like - but not limited to -filter, refrigerant, drier etc. to be considered and can not charge seperately. The rate should be inclusive everything ready for commissioning . The capacities for the same is listed under<br>8.5 TR <br>
6
-
-
od162576/2023_2024 : Supply, Installation ,Testing & commissioning of Condensing unit with R-410A /R 407C/ R32gas. It should be complete with inverter type scroll compressor, air cooled condenser including MICRO-PROCESSOR CONTROL with indication lamps, remote control, temperature controller, and sensors along with the control box, its transformer, relays, necessary power and control wiring between the thermostat, controller, and the communication cabling between the out door and temp.controller , All the fittings associated with the unit like - but not limited to -filter, refrigerant, drier etc. to be considered and can not charge seperately. The rate should be inclusive everything ready for commissioning . The capacities for the same is listed under11TR
1
-
-
REFRIGERANT PIPING
-
-
-
od162577/2023_2024 : "Supply,Installation and commissioning of copper refrigerant piping, complete with 19mm thick closed cell Class O Nitrile Rubber Insulation , fittings, elbows, bends, supporting and clambing arrangement on walls, cable trays/trenches including necessary civil works.<br>Refrigerant piping to be measured based on the distance between the indoor and outdoor units irrespective of number of circuits. The piping will be measured as one length for suction and liquid line. Insulation will be measured along with the piping and not be claimed as extra. "<br>
130
-
-
od179986/2023_2024 : Supply,installation,testing and commissioning of G.I. tray for exposed refrigerant copper piping. The cost for putting primer and applying 2 coats enamel paint shall be considered along with this and shall not be charged seperately.<br>
20
-
-
DRAIN PIPING
-
-
-
od162579/2023_2024 : Supply, installation, testing & commissioning of following sizes insulated PVC drain pipe' from terminal units (AHUs, split units etc.) drain pans to nearest floor drain complete with interconnection, flanges, elbows, tees, nuts, U-trap etc. The insulation shall be 9 mm thick closed cell Class O Nitrile Rubber foam insulation. ( Upto the nearest shaft)<br>25 mm dia. <br>
198
-
-
AIR DISTRIBUTION WORKS: SHEET METAL WORKS
-
-
-
od162580/2023_2024 : "Supply, Fabrication, installation, testing & commissioning of Factory fabricated GSS sheet metal rectangular/round ducting complete with neoprene rubber gasket, elbow, splitter dampers, turning vanes, access doors, hanger, supports, etc . All ducts shall be fabricated from Galvanised Sheet Steel (GSS) conforming to IS: 655-2006.<br><br>Longest side (mm) Minimum sheet thickness<br><br> For GSS For Aluminium<br>750 mm and below 0.63 0.80<br>751 mm to 1500 mm 0.80 1.00<br>1501 mm to 2250 mm 1.00 1.50<br>2251 mm & above 1.25 1.80"<br>22 Gauge (0.8MM)<br>
334
-
-
od162581/2023_2024 : "Supply, Fabrication, installation, testing & commissioning of Factory fabricated GSS sheet metal rectangular/round ducting complete with neoprene rubber gasket, elbow, splitter dampers, turning vanes, access doors, hanger, supports, etc . All ducts shall be fabricated from Galvanised Sheet Steel (GSS) conforming to IS: 655-2006.Longest side (mm) Minimum sheet thickness For GSS For Aluminium750 mm and below 0.63 0.80751 mm to 1500 mm 0.80 1.001501 mm to 2250 mm 1.00 1.502251 mm & above 1.25 1.80"24 Gauge (0.63MM)
854
-
-
INSULATION
-
-
-
od163070/2023_2024 : Supplying and fixing of following thickness duly laminated aluminum foil of mat finish closed cell Nitrile rubber (Class “O”) insulation on duct after applying suitable adhesive for Nitrile rubber. The joints shall be sealed with 50 mm wide and 3 mm thick self adhesive nitrile rubber tape insulation complete as per specifications and as required.Supply and Return ductwork complete running in Air-Conditioned space (Thickness-13 mm).
247
-
-
od163071/2023_2024 : Supply and Return ductwork complete running in Non Air-Conditioned space.(Thickness-19mm). covered with 2 coats of vapor barrier<br>
752
-
-
od163072/2023_2024 : Supply and Return ductwork complete running in , External Roof and in Risers.(Thickness-25 mm) covered with aluminium sheets of 26 gauge.<br>
30
-
-
od163073/2023_2024 : Supply, Fabricating , Fixing of 26 gauge aluminium sheet cladding in the 25mm insulated duct work
30
-
-
od163074/2023_2024 : Supply, store, installation, testing & commissioning of Acoustic Insulation for ducts and the return plenum using nitrile rubber, open cell foam, fibre free, minimum density of 140 kg/cu.m should have microban, as per ASTM G-21, ASTM E-2180, thermal conductivity not exceeding 0.047 W/m.K at 20 C, conform to class 1 rating for flame spread in accordance to BS 476 part 7, to thickness of minimum of 10mm all inline with the specificatoin and to meet the design noise criteria. The system shall be complete in all respects for commissioning. The duct insulation measured in the line item is considered as per the duct dimention. The measurement shall be taken according to that any material wastage shall not be considered during measurement . The system shall be complete in all respects for commissioning. Not to be applied in OT and ICU units.<br>Acoustic liner 10mm<br>
24
-
-
od163075/2023_2024 : Supply, store, installation, testing & commissioning of Under deck insulation 50 mm thick TF quality,28kg/m3 dense, EPS,Fixed by using rawl plugs GI washers etc. The system shall be complete in all respects for commissioning.<br>
606
-
-
AIR TERMINATION
-
-
-
od163081/2023_2024 : Supply, store, installation, testing & commissioning of Grilles, Diffusers with plenums and Dampers as specified below. The system shall be complete in all respects forcommissioning.<br>4 Way Supply Air Square Diffusers with opposed blade dampers<br>
33
-
-
od163082/2023_2024 : Supply, store, installation, testing & commissioning of Grilles, Diffusers with plenums and Dampers as specified below. The system shall be complete in all respects forcommissioning.<br>4 Way Return Air Square Diffusers<br>
33
-
-
od163083/2023_2024 : Supply, store, installation, testing & commissioning of Grilles, Diffusers with plenums and Dampers as specified below. The system shall be complete in all respects forcommissioning.Exhaust air grille
6
-
-
od163084/2023_2024 : Supply, store, installation, testing & commissioning of Grilles, Diffusers with plenums and Dampers as specified below. The system shall be complete in all respects forcommissioning.<br>Fresh air grille<br>
1
-
-
od163086/2023_2024 : Supply, installation, testing and commissioning of GI volume control duct damper complete with neoprene rubber gaskets, nuts, bolts, screws linkages, flanges etc., as per specifications.GI volume control damper.
33
-
-
od163087/2023_2024 : Supply, store, installation, testing & commissioning of Fire dampers quick release fusible link , louver type, constructed out of 18 Gauge galavanised steel casing etc., in accordance with BS 476, DW 144, DW 151, DW 154 as appropriate and have Fire resistance rating.<br>
4
-
-
od163088/2023_2024 : Supply, store, installation, testing & commissioning of Louvers at all air intake locations and extract locations. The system shall be complete in all respects forcommissioning.The dimensions shall be referred from the shared layouts.<br>
4
-
-
CONTROL WIRING
-
-
-
od163096/2023_2024 : Supply, installation, testing and commissioining of humidity control panel with 3 phase indication lamps,auto manual selector switch,on off push buttons with indications,overload relay, incomming MCB, Humiidstat,heater digital thermostat, safety thermostat, contactors,humidity digital display ,temperature digital display,trip indication.The control panel shall be made from 16 Gauge CRCA sheet with powder coat finish.Logic-Heaters to be operate automatically when the selector switch is in Auto mode and whenever operator wants to control the humidity in manual mode keep the Auto manual selector switch in manual mode and switch On the heater bank<br>
7
-
-
od163097/2023_2024 : Supply, store, installation, testing & commissioning of Thermostats for AHU units. The system shall be complete in all respects for commissioning.<br>
7
-
-
od163098/2023_2024 : Supply , installation and commissioning of power and control cabling with all necessary accessories for humidity control panel<br>
900
-
-
od163099/2023_2024 : Supply , installation and commissioning of power and control cabling with all necessary accessories for Thermostat <br>
400
-
-
od163100/2023_2024 : Supply,installation,testing and commissioning of control cum transmission wiring with suitable gauge wire in suitable PVC conduits between indoor and out door unit.<br>
200
-
-
EXTRACT AND FRESH AIR FANS
-
-
-
od163103/2023_2024 : Supply, store, installation, testing & commissioning of Wall Mounted Axial fan with bird cowl.<br>50 CFM<br>
17
-
-
od163104/2023_2024 : Supply, store, installation, testing & commissioning of Wall Mounted Axial fan with bird cowl.100 CFM
18
-
-
od163105/2023_2024 : Supply, store, installation, testing & commissioning of Wall Mounted Axial fan with bird cowl.<br>100 CFM<br>
17
-
-
od163106/2023_2024 : Supply, store, installation, testing & commissioning of Wall Mounted Axial fan with bird cowl.<br>150 CFM<br>
1
-
-
od163107/2023_2024 : Supply, store, installation, testing & commissioning of Wall Mounted Axial fan with bird cowl.250 CFM
5
-
-
od180020/2023_2024 : Supply, store, installation, testing & commissioning of Wall Mounted Axial fan with bird cowl.<br>350 CFM <br>
1
-
-
od180021/2023_2024 : Supply, store, installation, testing & commissioning of Wall Mounted Axial fan with bird cowl.<br>450 CFM<br>
2
-
-
od180022/2023_2024 : Supply, store, installation, testing & commissioning of Wall Mounted Axial fan with bird cowl.<br>550 CFM<br>
1
-
-
od180023/2023_2024 : Supply, store, installation, testing & commissioning of Wall Mounted Axial fan with bird cowl.<br>800 CFM <br>
1
-
-
od163108/2023_2024 : Supply, store, installation, testing & commissioning of Wall Mounted Axial fan with bird cowl.900 CFM
10
-
-
od163109/2023_2024 : Supply, store, installation, testing & commissioning of Inline Centrifugal Extract Fans shall be with direct driven circular section, suitable for ceiling suspension/mounting. The starters for the same should be considered in this scope. The units shall be complete with flexible duct connections at inlet and outlet. The motor shall be IP 55 rated, protected by inbuilt thermal contact relay as protection against burn-out as specified and as indicated in the technical specifications and drawings for the following and the system shall be complete in all respects for commissioning. <br>50 CFM,4mm ESP<br>
1
-
-
od163110/2023_2024 : Supply, store, installation, testing & commissioning of Inline Centrifugal Extract Fans shall be with direct driven circular section, suitable for ceiling suspension/mounting. The starters for the same should be considered in this scope. The units shall be complete with flexible duct connections at inlet and outlet. The motor shall be IP 55 rated, protected by inbuilt thermal contact relay as protection against burn-out as specified and as indicated in the technical specifications and drawings for the following and the system shall be complete in all respects for commissioning. <br>100 CFM,4mm ESP<br>
3
-
-
od163111/2023_2024 : Supply, store, installation, testing & commissioning of Inline Centrifugal Extract Fans shall be with direct driven circular section, suitable for ceiling suspension/mounting. The starters for the same should be considered in this scope. The units shall be complete with flexible duct connections at inlet and outlet. The motor shall be IP 55 rated, protected by inbuilt thermal contact relay as protection against burn-out as specified and as indicated in the technical specifications and drawings for the following and the system shall be complete in all respects for commissioning. 250 CFM, 5mm ESP
1
-
-
od163112/2023_2024 : Supply, store, installation, testing & commissioning of Inline Centrifugal Extract Fans shall be with direct driven circular section, suitable for ceiling suspension/mounting. The starters for the same should be considered in this scope. The units shall be complete with flexible duct connections at inlet and outlet. The motor shall be IP 55 rated, protected by inbuilt thermal contact relay as protection against burn-out as specified and as indicated in the technical specifications and drawings for the following and the system shall be complete in all respects for commissioning. 350 CFM, 6mm ESP
1
-
-
od163113/2023_2024 : Supply, store, installation, testing & commissioning of Inline Centrifugal Extract Fans shall be with direct driven circular section, suitable for ceiling suspension/mounting. The starters for the same should be considered in this scope. The units shall be complete with flexible duct connections at inlet and outlet. The motor shall be IP 55 rated, protected by inbuilt thermal contact relay as protection against burn-out as specified and as indicated in the technical specifications and drawings for the following and the system shall be complete in all respects for commissioning.550 CFM, 6mm ESP
3
-
-
od163120/2023_2024 : Supply, store, installation, testing & commissioning of Inline Centrifugal Fresh air Fans with mesh filter shall be with direct driven circular section, suitable for ceiling suspension/mounting. The units shall be complete with flexible duct connections at inlet and outlet. The motor shall be IP 55 rated, protected by inbuilt thermal contact relay as protection against burn-out as specified and as indicated in the technical specifications and drawings for the following and the system shall be complete in all respects for commissioning. The electrical cabling and termination from the local isolator panel to the relevant Fan upto 5m to be priced under this scope.100 CFM, 6mm ESP
1
-
-
od163121/2023_2024 : Supply, store, installation, testing & commissioning of Inline Centrifugal Fresh air Fans with mesh filter shall be with direct driven circular section, suitable for ceiling suspension/mounting. The units shall be complete with flexible duct connections at inlet and outlet. The motor shall be IP 55 rated, protected by inbuilt thermal contact relay as protection against burn-out as specified and as indicated in the technical specifications and drawings for the following and the system shall be complete in all respects for commissioning. The electrical cabling and termination from the local isolator panel to the relevant Fan upto 5m to be priced under this scope.300 CFM, 6mm ESP
1
-
-
od163122/2023_2024 : Supply, store, installation, testing & commissioning of Inline Centrifugal Fresh air Fans with mesh filter shall be with direct driven circular section, suitable for ceiling suspension/mounting. The units shall be complete with flexible duct connections at inlet and outlet. The motor shall be IP 55 rated, protected by inbuilt thermal contact relay as protection against burn-out as specified and as indicated in the technical specifications and drawings for the following and the system shall be complete in all respects for commissioning. The electrical cabling and termination from the local isolator panel to the relevant Fan upto 5m to be priced under this scope.500 CFM, 6mm ESP
1
-
-
od163123/2023_2024 : Supply, store, installation, testing & commissioning of Inline Centrifugal Fresh air Fans with mesh filter shall be with direct driven circular section, suitable for ceiling suspension/mounting. The units shall be complete with flexible duct connections at inlet and outlet. The motor shall be IP 55 rated, protected by inbuilt thermal contact relay as protection against burn-out as specified and as indicated in the technical specifications and drawings for the following and the system shall be complete in all respects for commissioning. The electrical cabling and termination from the local isolator panel to the relevant Fan upto 5m to be priced under this scope.650 CFM, 6mm ESP