Kerala State Housing Board Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Housing Board - KSHB Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date16 Dec 2023
Closing Date16 Jan 2024
Tender Amount₹ 1,17,33,341 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
od149832/2023_2024 : Supply, Instllation, testing and commissioning of the following sizes Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. with all accessories required for complete installation as per the technical specification.28 mm

7

-

-

... More
od149833/2023_2024 : Supply, Instllation, testing and commissioning of the following sizes Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. with all accessories required for complete installation as per the technical specification.35 mm

3

-

-

... More
od149834/2023_2024 : Supply, Instllation, testing and commissioning of following sizes Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. with all accessories required for complete installation as per the technical specification.54 mm

1

-

-

... More
od149835/2023_2024 : Supply, Instllation, testing and commissioning of following sizes Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. with all accessories required for complete installation as per the technical specification.76 mm

1

-

-

... More
od149837/2023_2024 : Supply, Instllation, testing and commissioning of the following sizes Integrated area alarm with Valve Box (Including valves) and gauge (should comply with ISO 7396 & European CE and BMS compatibility) with all accessories required for complete installation as per the technical specification.5 Gas - O2, Air 4, N2O, Air 7, CO2 and 1 Vac

4

-

-

... More
od149838/2023_2024 : Supply, Instllation, testing and commissioning of the following sizes Integrated area alarm with Valve Box (Including valves) and gauge (should comply with ISO 7396 & European CE and BMS compatibility) with all accessories required for complete installation as per the technical specification.3 Gas - O2, Air 4, N2O and 1 Vac

1

-

-

... More
od149839/2023_2024 : Supply, Instllation, testing and commissioning of the following sizes Integrated area alarm with Valve Box (Including valves) and gauge (should comply with ISO 7396 & European CE and BMS compatibility) with all accessories required for complete installation as per the technical specification.2 Gas - O2, Air 4 and 1 Vac

5

-

-

... More
od149840/2023_2024 : Supply, Instllation, testing and commissioning of the following sizes Integrated area alarm with Valve Box (Including valves) and gauge (should comply with ISO 7396 & European CE and BMS compatibility) with all accessories required for complete installation as per the technical specification.1 Gas - O2 and 1 Vac

2

-

-

... More
od149843/2023_2024 : Supply, Instllation, testing and commissioning of the following Terminal Units in surface mounted, flush mounted, ceiling mounted, energy panels, gas energy duct systems, Bed Head units, OT wall panels etc. with all accessories required for complete installation as per the technical specification. Should Meet the requirements of EN ISO 9170-1 standards and European CE.Terminal Unit - VAC

184

-

-

... More
od149844/2023_2024 : Supply, Instllation, testing and commissioning of the following Terminal Units in surface mounted, flush mounted, ceiling mounted, energy panels, gas energy duct systems, Bed Head units, OT wall panels etc. with all accessories required for complete installation as per the technical specification. Should Meet the requirements of EN ISO 9170-1 standards and European CE.Terminal Unit - N2O

5

-

-

... More
od149845/2023_2024 : Supply, Instllation, testing and commissioning of the following Terminal Units in surface mounted, flush mounted, ceiling mounted, energy panels, gas energy duct systems, Bed Head units, OT wall panels etc. with all accessories required for complete installation as per the technical specification. Should Meet the requirements of EN ISO 9170-1 standards and European CE.Terminal Unit - MA7

5

-

-

... More
od149846/2023_2024 : Supply, Instllation, testing and commissioning of the following Terminal Units in surface mounted, flush mounted, ceiling mounted, energy panels, gas energy duct systems, Bed Head units, OT wall panels etc. with all accessories required for complete installation as per the technical specification. Should Meet the requirements of EN ISO 9170-1 standards and European CE.Terminal Unit - MA4

42

-

-

... More
od149847/2023_2024 : Supply, Instllation, testing and commissioning of the following Terminal Units in surface mounted, flush mounted, ceiling mounted, energy panels, gas energy duct systems, Bed Head units, OT wall panels etc. with all accessories required for complete installation as per the technical specification. Should Meet the requirements of EN ISO 9170-1 standards and European CE.Terminal Unit - co2

4

-

-

... More
od149848/2023_2024 : Supply, Instllation, testing and commissioning of following Terminal Units in surface mounted, flush mounted, ceiling mounted, energy panels, gas energy duct systems, Bed Head units, OT wall panels etc. with all accessories required for complete installation as per the technical specification. Should Meet the requirements of EN ISO 9170-1 standards and European CE.Terminal Unit - AGSS

5

-

-

... More
od149856/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.VAC

184

-

-

... More
od149857/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.MA4

42

-

-

... More
od149858/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.MA7

5

-

-

... More
od149859/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.CO2

4

-

-

... More
od149860/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.AGSS

5

-

-

... More
od149861/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.Theater Vacuum Units

4

-

-

... More
od149862/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.O2

184

-

-

... More
od149863/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.N2O

5

-

-

... More
od149864/2023_2024 : Supply, installation, testing, and commissioning of matching prob as per the technical specification.Ward Vacuum Units

184

-

-

... More
od149877/2023_2024 : Supply, Installation, testing, and commissioning of Master Plant Alarm Panel (post source), BMS compatible with all accessories required for complete installation.

1

-

-

... More
od149878/2023_2024 : Supply, Installation, testing, and commissioning of Oxygen Flowmeters with humidifier bottles.

184

-

-

... More
od149995/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers, and straight couplings joining the lines by flux-less silver brazing method for copper to copper on wall/ceiling by using suitable and strong enough supports, as per the requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidized non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half-hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008. 76mm

80

-

-

... More
od149996/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers, and straight couplings joining the lines by flux-less silver brazing method for copper to copper on wall/ceiling by using suitable and strong enough supports, as per the requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidized non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half-hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008. 54mm

30

-

-

... More
od149997/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers and straight couplings joining the pipes by flux less silver brazing method for copper to copper on wall / ceiling by using suitable and strong enough supports, as per requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidised non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008.42 mm

30

-

-

... More
od149998/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers, and straight couplings joining the lines by flux-less silver brazing method for copper to copper on wall/ceiling by using suitable and strong enough supports, as per the requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidized non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half-hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008. 35mm

180

-

-

... More
od149999/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers, and straight couplings joining the lines by flux-less silver brazing method for copper to copper on wall/ceiling by using suitable and strong enough supports, as per the requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidized non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half-hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008. 28mm

400

-

-

... More
od150000/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers, and straight couplings joining the lines by flux-less silver brazing method for copper to copper on wall/ceiling by using suitable and strong enough supports, as per the requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidized non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half-hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008. 22mm

1450

-

-

... More
od150001/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers, and straight couplings joining the lines by flux-less silver brazing method for copper to copper on wall/ceiling by using suitable and strong enough supports, as per the requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidized non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half-hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008. 15mm

1400

-

-

... More
od150002/2023_2024 : Supply, Installation, testing, and commissioning of the following sizes of copper pipe with all accessories like bends, tees, reducers, and straight couplings joining the lines by flux-less silver brazing method for copper to copper on wall/ceiling by using suitable and strong enough supports, as per the requirement with all accessories required for complete installation. Should have Medical Grade LLOYD certified Copper Pipes: Copper pipes manufactured from phosphorous de-oxidized non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half-hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008. 12 mm

1000

-

-

... More
od150456/2023_2024 : Supply, Instllation, testing and commissioning of the following Terminal Units in surface mounted, flush mounted, ceiling mounted, energy panels, gas energy duct systems, Bed Head units, OT wall panels etc. with all accessories required for complete installation as per the technical specification. Should Meet the requirements of EN ISO 9170-1 standards and European CE.Terminal Unit - O2

184

-

-

... More
OXYGEN SUPPLY

-

-

-

... More
od149880/2023_2024 : Supply, Installation, testing, and commissioning of Emergency Oxygen Manifold of capacity 1 Banks X 6 Cylinders complete with tailpipes, NRV, relief valve, fixing chain etc.

1

-

-

... More
od149881/2023_2024 : Supply, Installation, testing and commissioning of Emergency Oxygen Supply System with flow regulator: Supply, Installation, testing, and commissioning of Emergency Oxygen manifold complete with middle frame cylinder. Emergency Oxygen Supply System as per technical specifications. Should comply with the standards of ISO 7396/HTM 02-01

1

-

-

... More
od149882/2023_2024 : Supply, Installation, testing, and commissioning of Oxygen Manifold of capacity 2 X 6 Cylinders complete with tailpipes, NRV, relief valve, fixing chain, etc.

1

-

-

... More
od149883/2023_2024 : Supply, Installation, testing, and commissioning of Fully Automatic Main Oxygen supply system: Supply, Installation, testing, and commissioning of Fully Automatic gas control panel with a flow capacity of 1332 LPM at 5 bar regulating/Supply pressure. Should have the connectivity of the Cylinder service and liquid oxygen plant. (As per technical specification Standard: ISO 7396 / HTM 02-01).

1

-

-

... More
N2O SUPPLY

-

-

-

... More
od149888/2023_2024 : Supply, Installation, testing, and commissioning of Emergency Nitrous Oxide Manifold of capacity 1 Banks X 2 Cylinders complete with tailpipes, NRV, Relife valve, fixing chain, etc.

1

-

-

... More
od149889/2023_2024 : Supply, Installation, testing and commissioning of Emergency N20 Supply System with flow regulator: Supply, Installation, testing, and commissioning of Emergency Oxygen manifold complete with middle frame cylinder. Emergency Oxygen Supply System as per technical specifications. Should comply the standards of ISO 7396/HTM 02-01

1

-

-

... More
od149890/2023_2024 : Supply, Installation, testing, and commissioning of Nitrous Oxide Manifold of capacity 2 Banks X 2 Cylinders complete with tailpipes, NRV, relief valve, fixing chain etc.

1

-

-

... More
od149891/2023_2024 : Supply, Installation, testing, and Commissioning of Nitrous Oxide Fully Automatic gas control panel: This should meet the minimum flow of 583 LPM and complies with iso 7396/HTM 02-01.

1

-

-

... More
CO 2 SUPPLY

-

-

-

... More
od149933/2023_2024 : Supply, Installation, testing and commissioning of Emergency Co2 Supply System with flow regulator: Supply, Installation, testing and commissioning of Emergency Oxygen manifold complete with middle frame cylinder. Emergency Oxygen Supply System as per technical specifications. Should comply the standards of ISO 7396/HTM 02-01.

1

-

-

... More
od149934/2023_2024 : Supply, Installation, testing, and commissioning of Carbon Dioxide Manifold of capacity 2 Banks X 1 Cylinders complete with tailpipes, NRV, relief valve, fixing chain, etc.

1

-

-

... More
od149935/2023_2024 : Supply, Installation, testing and commissioning of Carbon Dioxide Fully Automatic gas control panel: Should meet the minimum flow of 583 LPM and complies with iso 7396/HTM 02-01.

1

-

-

... More
od151138/2023_2024 : Supply, Installation, testing, and commissioning of Emergency Carbon Dioxide Manifold of capacity 1 Banks X 1 Cylinder complete with tailpipes, NRV, Relife valve, fixing chain, etc.

1

-

-

... More
MEDICAL AIR PLANT

-

-

-

... More
od149943/2023_2024 : Supply, Installation, testing, and commissioning of 2 sets of Medical Grade Air purification systems as per the technical specification and air quality according to European pharmacopea.Full System should be in accordance with HTM 02-01 /ISO 7396 standard.

1

-

-

... More
od149944/2023_2024 : Supply, Installation, testing, and commissioning of Air receiving tank of capacity 1000 Lit including drain valve and valves required with all accessories required for complete installation as per the technical specification.

1

-

-

... More
od149945/2023_2024 : Supply, Installation, testing, and commissioning of Compressed air plant system, lubricated air cooled, fixed speed rotary screw compressor complete with 10 HP Motor, maximum working pressure of 10 Bar with all accessories required for complete installation as per the technical specification.

1

-

-

... More
MEDICAL VACCUM PLANT

-

-

-

... More
od149946/2023_2024 : Supply installation testing and commissioning of Bed Head Horizontal Wall Panel: Supply installation testing and commissioning of 1500mm Horizontal Bed Head Panel with European CE certificate for ICU Category.

25

-

-

... More
od149947/2023_2024 : Supply installation testing and commissioning of Bed Head Horizontal Wall Panel: Supply installation testing and commissioning of 1000mm Horizontal Bed Head Panel with European CE certificate for Wards.

76

-

-

... More
od149948/2023_2024 : Supply installation testing and commissioning of Bed Head Horizontal Wall Panel: Supply installation testing and commissioning of continuous Horizontal Bed Head Panel with a European CE certificate.

28

-

-

... More
od149949/2023_2024 : Supply, Installation, testing and commissioning of the electrical control panel for 2 X Compressors & 2 vacuum plants with complete accessories as mentioned in technical specifications.

1

-

-

... More
od149950/2023_2024 : Supply, Installation, testing, and commissioning of 1 set of double bacteria filter units + 1 secretion trap as per technical specification.

1

-

-

... More
od149951/2023_2024 : Supply, Installation, testing, and commissioning of Vaccum tank of capacity 1500 Lit including valves required with all accessories required for complete installation as per the technical specification.

1

-

-

... More
od149952/2023_2024 : Supply, Installation, testing, and commissioning of Air Vacuum Pump system, double cylinder, single stage, Air-cooled type, suitably mounted on M.S. Channel base frame to delivery by 3 Phase (AC), 440 Volts, TEFC Electric Motor complete with V-Belt gaurd & DOL starter, 1000 RPM speed, 55 C.F.M. Piston displacement, Max Vaccum referred to 30" barometer with closed intake 29" 65 HG, Moor capacity 7.5 HP with all accessories required for complete installation as per the technical specification.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.