Kerala State Electricity Board Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date14 Mar 2025
Closing Date21 Mar 2025
Tender Amount₹ 12,33,215 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling one suspension clamp from 11 KV ABC

27

77

2080.35

... More
Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

11

1796

19756.99

... More
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same

22

3129

68839.1

... More
Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. and stacking the same.

10

3130

31300.9

... More
Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.

45

879

39565.35

... More
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole

46

1778

81802.72

... More
Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole

6

722

4334.46

... More
Dismantling one Anchor clamp /dead end clamp from 11 KV ABC

11

77

847.55

... More
Additional rate for providing one disc set on any type of HT pole for making cut point

42

158

6674.22

... More
Dismantling one damaged 11kV TW/RSJ/Rail pole after disconnecting stays, strut etc.and stacking the same.

1

1097

1097.73

... More
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion

78

96

7502.04

... More
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting

22

492

10833.02

... More
Dismantling one HT pin insulator with pin and bring back to section store.

21

192

4039.56

... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.

15

149

2242.5

... More
Dismantling one V cross arm/Channel cross arm from existing Pole, and bringing back to section store.

17

192

3270.12

... More
Dismantling one Channel cross arm from existing DP structure, and bringing back to section store.

2

282

564.54

... More
Dismantling one LT 4 line cross arm from existing pole.

19

104

1986.45

... More
Dismantling one LT 2 line cross arm from existing pole.

3

70

210.15

... More
Dismantling one set(3No) 11kV LA

1

160

160

... More
Dismantling one section fuse

8

192

1538.88

... More
Dismantling (without damage) one HT PSC/RCC Strut pole incl. removal of clamps and stacking

1

2866

2866.64

... More
Dismantling of 11 kV Aerial bunched cable XLPE insulated of size 3 x 150+ 1 x 120 sqmm with bare insulated Messenger

650

24

16204.5

... More
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.

0.95

13827

13135.82

... More
Dismantling (without damage) one AB switch from existing structure and bringing back to section store.

2

1676

3353.82

... More
Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking

2

1589

3178.18

... More
Dismantling transformer station in DP structure excluding the rate of dismantling earthing

1

14935

14935.36

... More
Fitting 6 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses

1

11469

11469.68

... More
Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.

1

10473

10473.36

... More
Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line.

5

351

1756.35

... More
Installing one DTR meter No 925.23 1 925.23 CONTR with box on existing channel/angle cross-arm on DP structure and giving connections including conveyance

1

925

925.23

... More
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling

42

2266

95195.1

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.

10

868

8687.7

... More
Additional rate for excavation of Pit for A type pole in Laterite.

8

651

5210.56

... More
Additional rate for excavation of Pit for A type pole in Hard Laterite.

10

1303

13036.8

... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite.

20

1737

34751

... More
Dismantling 160kVA Transformer, erecting new 160kVA Transformer, giving connections incl. loading & unloading at site.

1

12004

12004.95

... More
Demolishing stone rubble masonry in cement mortar manually/by mechanical means including stacking or serviceable material and disposal of un serviceable material within 50M lead as per direction of Deptl officers at site

3.04

2393

7270.47

... More
Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).

18

906

16315.38

... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.

0.95

34792

33053.09

... More
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.

8

564

4516.4

... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.

25

1373

34343.25

... More
Providing WP support with PSC pole incl. digging & back filling pit

18

1943

34983

... More
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit

2

3056

6113.82

... More
Fitting one set (3No.) 11kV LA and giving connections excluding earthing.

1

481

481.95

... More
Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmm with bare/insulated Messenger through existing poles

650

50

32968

... More
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.

9

481

4337.55

... More
Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable

15

963

14445

... More
Fiting One no MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable

24

193

4632

... More
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.

3

240

721.35

... More
Providing Strut using LT PSC pole incl. digging & back filling pit.

2

1887

3774.1

... More
Insertion of one HT A type pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc.

3

4302

12906.15

... More
Insertion of one LT PSC pole in existing 3ph OH line incl. digging & back filling pit, fitting cross arm, insulator, binding etc.

1

2371

2371.09

... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.

8

3142

25138.08

... More
Erection of suspension clamp for 11KV ABC of any size

28

164

4610.76

... More
Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm

6

370

2220

... More
Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads

23

4143

95292.22

... More
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.

6

4805

28835.7

... More
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).

28

4028

112792.12

... More
Fitting one set AB switch and giving connection

2

2795

5591.1

... More
Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line

3

140

420.27

... More
Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.

19

210

3992.66

... More
Erection of Anchor clamp / dead end clamp for 11kV ABC of any size

11

164

1811.37

... More
Fitting one additional HT pin with insulator

21

149

3139.5

... More
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.

18

481

8675.1

... More
Erecting one LT PSC Pole in position incl. digging & back filling pit.

2

2017

4035.46

... More
Providing Cable Tie

150

3

577.5

... More
Providing additional HT stay insulator in existing stay.

25

298

7459

... More
Fitting and erecting one HT PSC Pole in position incl.fitting cross arm, digging & back filling pit, drawing earth leads.

22

3274

72035.92

... More
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.

22

1086

23897.06

... More
Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

11

478

5267.02

... More
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

1

762

762.14



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.