Kerala State Electricity Board Tender
... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 5,950Tender Fee
Refer Documents
Summary
Pole Erection And Stantadization Of 11kv Line
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_KSEB_400753_2Tender No
E-Tender No 29/20-21/EE/PMU/KSD dtd 11.12.2020Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://http://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Fitting and providing one HT Stay for 11kVpole incl. digging and back filling pit.
110
-
914
... More
Fitting and providing one Strut using HTPSC pole incl. digging and back filling pit
4
-
2033
... More
Insertion of one HT PSC pole in existingline incl. digging and backfilling pit, fittingcross arm, insulators, binding etc
36
-
2283
... More
Insertion of one HT 'A' type pole in existingline incl. digging and backfilling pit, fittingcross arm, insulators, binding etc.
54
-
2862
... More
Additional rate for excavation of one Pit forHT Pole/HT Stay in Hard Laterite.
108
-
578
... More
Additional rate for excavation of one Pit forHT Pole/HT Stay in Soft Rock.
50
-
867
... More
Additional rate for excavation of Pit for 'A'type pole in Hard Laterite.
42
-
867
... More
Additional rate for excavation of Pit for 'A'type pole in Soft Rock.
30
-
1301
... More
Stringing of one km 11kV line with ACSRRaccoon (3 conductors) incl. cutting andremoving tree branches wherever necessary
1.9
-
23128
... More
Providing one Earth using earth pipe incl.digging separate pit at standard distanceaway from the pole/structure andbackfilling.
12
-
1508
... More
Additional rate for excavation of one EarthPit (2.5m depth) in Hard Laterite
12
-
1157
... More
Providing one Coil Earth using GI earthwire, digging separate pit at standarddistance away from the pole/structure andbackfilling
10
-
723
... More
Fitting one set (3No.) 11kV LA and givingconnections excluding earthing.
6
-
320
... More
Fitting one set AB switch, giving connectionand earthing the same using one earth pipeincl. digging and back filling pit.
7
-
1859
... More
Fitting one Additional 75x40mm, 1.8mChannel cross arm in existing single poleincl. conveyance of materials.
14
-
320
... More
Fitting one Additional 3m Channel crossarm (75x40x6mm), in existing 11kV DPincl. conveyance of materials.
16
-
361
... More
Replacing/inserting HT Stay insulator on theexisting stay
110
-
376
... More
Reconductoring one km 11kV old line of 3conductors with new ACSR Raccoon incl.cutting of tree branches and conveyance.
1.9
-
33071
... More
Drilling hole of various sizes on existingChannel/Cross Arm.
120
-
11
... More
Drilling oval shaped hole of various sizes onexisting Channel/Cross Arm/GI/MS cleatetc.
30
-
28
... More
Cutting Channel/Cross Arm/Angle Iron intotwo pieces.
10
-
45
... More
Transferring LT Sph 2/3 wire OH line tonewly erected HT/LT pole and refitting allitems to the new pole.
15
-
585
... More
Transferring LT 3ph 4/5 wire OH line tonewly erected HT/LT pole and refitting allitems to the new pole.
47
-
1183
... More
Dismantling and reconnecting Sph serviceconnection from the OH line incl. loweringdown the WP portion
40
-
64
... More
Dismantling and reconnecting 3ph serviceconnection from the OH line incl. loweringdown the WP portion
10
-
99
... More
Dismantling (without damage) one No.11kV TW/RSJ/Rail pole after disconnectingstays, strut etc. and stacking the same.
7
-
1201
... More
Dismantling one damaged 11kV PSC/RCCpole after disconnecting stays, strut etc. andstacking the same
30
-
1194
... More
Dismantling (without damage) one 11kVPSC/RCC pole after disconnecting stays,strut etc. and stacking the same.
10
-
2081
... More
Dismantling (without damage) one km11kV line (3 conductors), cross arm,insulators, disc, rolling the conductor andstacking.
3.8
-
9198
... More
Dismantling (without damage) one ABswitch from existing structure and bringingback to section store.
1
-
1115
... More
Dismantling one damaged LT TW/RSJ/Railpole after disconnecting stays, strut etc. andstacking the same.
4
-
382
... More
Dismantling one damaged LT PSC/RCCpole after disconnecting stays, strut etc. andstacking the same.
10
-
671
... More
Dismantling (without damage) one LTPSC/RCC pole after disconnecting stays,strut etc. and stacking the same.
5
-
1280
... More
Dismantling (without damage) one LTPSC/RCC Strut pole incl. removal of clampsand stacking.
1
-
1057
... More
Dismantling one ordinary streetlight/CFL/LED fitting from existing poleand refitting the same on newly erected poleand reconnecting
18
-
327
... More
Loading HT PSC pole from the stackingplace and unloading the same at work site(transport by vehicle).
48
-
507
... More
Loading HT 'A' type pole from the stackingplace and unloading the same at work site(transport by vehicle)
78
-
603
... More
Transporting poles by hired vehicle to adistance upto 5km and carrying upto 4 polesexcluding loading & unloading.
32
-
1428.57
... More
Providing concrete muffing(0.45x0.45x1.5m) inclusive of cost of allmaterial (as per specification).
78
-
3802