Kerala State Electricity Board Tender
... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Providing Earth Mat For Strengthening Yard Earthing At Existing 110 Kv Switchyard Of Kuttiady Hydro Electric Project Kakkayam Under Generation Division Kakkayam
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KSEB_746877_1Tender No
11/EE/KGD/KKM/2024-25Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Laying of earth mat of required size as specified using 32mm MS rod including levelling lowering and placing in trenches, complete as per the direction of departmental officers.
228.5
1047
239246.36
... More
Welding one end of the bended GI strip of size 50x6mm with the riser of the already laid earth mat, welding 150mm in length, 6mm thick on both sides & end of the strip & other end of the strip with yard structure at 2 points 50mm apart each welding points having 50mm length and 6mm thick on both sides & end of the strip including the charges for connecting the strip with structure using bolted joints as per the directions of the department officers. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes (No.E7018) cost of anti-corrosive paint etc. complete.
400
541
216712
... More
Drilling holes in yard structure
500
55
27990
... More
Appendix B -CIVIL WORK
-
-
-
... More
Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
1.2
5924
7115.78
... More
Supplying and laying tarpaulin sheet of 150 GSM thick of approved make and quality over levelled surface including cost of tarpaulin,wastage,overlap,cost of connveyance and labour charges,etc.complete
3315
86
286714.35
... More
Driving down the ground electrode up to a depth of 3m from the already taken earth pit as directed by the departmental officers.
150
171
25686
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20
mm nominal size)
1
8540
8540.67
... More
Appendix C - ELECTRICAL WORK
-
-
-
... More
Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock
108
530
57329.09
... More
Supply and stacking 20mm metal for measurement including all cost of material and labour charges
148
2316
342807.96
... More
Supply and stacking 6mm metal for measurement including all cost of material and labour charges
156
2395
373699.56
... More
Spreading 40mm broken stone to a uniform thickness of 150mm including all charges etc complete
443
884
391740.47
... More
Welding the nodal points (cross joints) in the trenches at two sides to a thickness of 6mm after cleaning the surface neatly. Charges include cost of low hydrogen DC electrodes (No. E7018), hire charges of DC welding set and tools and plants required, current charges, labour charges for holding MS rod in position and applying two coats of anti-corrosive paints at the welded joints etc. complete as per the directions of departmental officers.
1500
301
452970
... More
Welding one end of the bended GI strip of size 50x6mm with the riser of the already laid earth mat, welding 150mm in length, 6mm thick on both sides & end of the strip and connecting other end with nuts & bolts if required as per the directions of the department officers. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes(No.E7018) cost
of anti corrosive paint etc. complete.
180
510
91969.2
... More
Welding of overlapping joints for mat,riser lap joints with 32 MS rod placed in trenches, having 150mm in length 6mm in thick on both sides of the rod and both ends of overlapped MS rods with 6mm welding thickness after cleaning the surfaces neatly. Charges includes cost of low hydrogen DC electrode (No.E7018), hire charges of DC arc welding set and tools and plants required, current charges including labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of department officers.
1600
638
1021808
... More
Welding the ground electrode with the main electrode, after cleaning the surface neatly. Charges include cost of low hydrogen content DC electrodes (No. E7018), hire charges of DC arc welding set, tools and plants, current charges, labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of departmental officers.
200
386
77346
... More
Welding overlapping joints of 50x6mm GI strip with 50mm long, 6mm thick welding on all three sides after doing 2 Nos. bolted joints at the centre as specified after cleaning the surface. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes( No.E7018) cost of anti-corrosive paint etc. complete.
550
275
151442.5
... More
Picking collecting and stacking neatly without sticking soil on metal at suitable places(up to 100mts) for measurement pointed out by departmental officers for the 6mm in the existing yard including all labour etc. complete.
140.25
309
43408.3
... More
Spreading 20mm broken stone to make uniform level at top including all charges etc complete
148
309
45806
... More
Bending 32mm MS rod for crossing cable trench/foundations/risers etc.
2500
127
318075
... More
Providing and fixing PVC pipes includes joints of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in charge. 110 mm dia 4 Kg/cm2
138
477
65944.68
... More
Picking collecting and stacking neatly without sticking soil on metal at suitable places(up to 100mts) for Measurement pointed out by departmental officers for the 40mm / 20mm (mixed layer) in the existing yard including all labour etc complete
280.5
884
248044.23
... More
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
686.49
298
205124.11
... More
Spreading 6mm broken stone to a uniform thickness of 100mm including all charges etc complete
296
309
91612
... More
Drilling holes and driving down MS ground electrode from the bottom level of trench in all classes of soil including rock etc. complete as per the directions of department officers
150
215
32356.5
... More
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete up to plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more.
70
98
6924.4
... More
15 mm cement plaster on the rough side of single or half brick wall of mix:1:4 (1 cement :4 fine sand)..
19.4
364
7075.18
... More
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil
2954.97
28
85280.35
... More
Labour charges for careful removal of covering slab over cable trench to the nearest convenient place and replacing the same after works in cable trench ,without damaging the covering slab and nearby
structures
200
74
14896
... More
Laying of departmentally supplied GI strip 50x6 mm/ suitable size including cleaning and neatly bending of strips ,cutting, removing of metal/earth in the yard and burying earth strip to the required depth redoing the yard metalling as per the direction of the departmental officers.
3400
182
618800
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements