Kerala State Electricity Board Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Eprocure
Opening Date4 Sep 2024
Closing Date11 Sep 2024
Tender Amount₹ 22,15,107 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Renewing one 11kV Jumper connection using Copper/ACSR conductor as per standard specification.

12

3638

303.18

... More
Renewing one LT Jumper connection using

12

1216

101.41

... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.

55

172824

3142.26

... More
Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 poles. (Running km).

50

5175

103.5

... More
Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable

30

28890

963

... More
Providing one Earth using earth pipe incl. digging & backfilling pit and supply of charcoal, salt, sand etc.

25

106139

4245.59

... More
Providing one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil.

2

1185

592.77

... More
Drilling hole of various sizes on existing Channel/Cross Arm.

57

953

16.73

... More
Fitting one set AB switch and giving connection

4

11182

2795.55

... More
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.

16

9032

564.55

... More
Fitting one set (3No.) 11kV LA and giving connections excluding earthing.

5

2409

481.95

... More
Erection of Anchor clamp / dead end clamp for 11kV ABC of any size

84

13832

164.67

... More
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

198

150903

762.14

... More
Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.

4

34943

8735.82

... More
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.

3

14417

4805.95

... More
Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

187

612305

3274.36

... More
Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

3

12429

4143.14

... More
Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).

3

2719

906.41

... More
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).

3

12084

4028.29

... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.

160

219796

1373.73

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.

50

43438

868.77

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock.

50

65184

1303.68

... More
Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles

4800

218976

45.62

... More
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.

187

203125

1086.23

... More
Doing straight joint on cables of sizes upto and incl. 3x185 sqmm using the cable jointing kit supplied departmentally as per specification.

9

28283

3142.64

... More
Erection of suspension clamp for 11KV ABC of any size

120

19760

164.67

... More
Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

15

7182

478.82

... More
Erecting one LT PSC Pole in position incl. digging & back filling pit.

9

18159

2017.73

... More
Renewal of existing damaged/old LT PSC/RCC (Sph line) pole with new PSC pole in place and refitting of all items incl. conveyance (except pole).

5

17500

3500.12

... More
Providing Stay for LT poles incl. digging & back filling pit.

9

8449

938.82

... More
Renewal of existing damaged/broken old LT stay with existing stay rod.

5

2174

434.91

... More
Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials..

0.4

12782

31957.45

... More
Conversion of one km LT Sph 2 wire to 3ph 4 wire line incl. dismantling existing 2 conductors, stringing 3 Rabbit & 1 Weasel incl. conveyance.

0.4

15296

38241.68

... More
Insertion of one LT PSC pole in existing 3ph OH line incl. digging & back filling pit, fitting cross arm, insulator, binding etc.

1

2371

2371.09

... More
Straightening one Slanted LT pole after unbinding the line and rebinding the line after work.

2

2055

1027.68

... More
Reshackling one span LT 3ph 4 wire OH line, replacing insulators, tightening stay, cutting tree branches incl. conveyance.

30

14803

493.45

... More
Reshackling one span LT Sph 2 wire OH line, replacing insulators, tightening stay, cutting tree branches incl. conveyance.

30

7872

262.41

... More
Re-joining snapped one LT conductor after removing damaged portion incl. Reshackling and conveyance of all materials complete.

24

16861

702.55

... More
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.

25

2404

96.18

... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.

6

897

149.5

... More
Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation

30

47691

1589.72

... More
Providing yard metalling with 6mm & 40mm thick blue metal as specified after constructing a curb wall.

20

15383

769.18

... More
Installing one DTR Meter with box on existing poles and giving the complete connections incl. conveyance of materials.

1

3758

3758.41

... More
Additional rate for providing one disc set on any type of HT pole for making cut point.

3

476

158.91

... More
Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses.

1

10905

10905.14

... More
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.

2

963

481.95



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.