Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 21,999Document Cost
₹ 2,124Tender Fee
Refer Documents
Summary
Deposit Work For Shifting Ht And Lt Line From Muriyamkanni To Chethallur School For Road Widening Kiifb Under Es Sreekrishnapuram
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KSEB_713948_1Bid Award Id
ViewTender No
02/2024-25/AEE/ESD/CPYTender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://https://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling
9
469
4224.69
... More
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
18
3129
56322.9
... More
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.
1
3056
3056.91
... More
Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. and stacking the same.
2
3130
6260.18
... More
Dismantling one Channel cross arm from existing DP structure, and bringing back to section store.
2
282
564.54
... More
Drilling hole of various sizes on existing Channel/Cross Arm.
48
16
803.04
... More
Providing WP support with PSC pole incl. digging & back filling pit.
3
1943
5830.5
... More
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.
10
492
4924.1
... More
Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.
0.97
7443
7220.33
... More
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.
0.9
13827
12444.46
... More
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
28
1923
53861.92
... More
Providing Strut using LT PSC pole incl. digging & back filling pit.
2
1887
3774.1
... More
Dismantling (without damage) one HT stay incl. back filling, and bringing back to section store.
23
904
20799.36
... More
Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
45
3274
147346.2
... More
Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
6
4143
24858.84
... More
Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
1
8735
8735.82
... More
Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses.
1
10905
10905.14
... More
Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line.
6
351
2107.62
... More
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.
7
2266
15865.85
... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.
37
1373
50828.01
... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite.
3
868
2606.31
... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite.
3
1737
5212.65
... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock.
1
2606
2606.32
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.
30
434
13047.3
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.
44
868
38225.88
... More
Additional rate for excavation of Pit for A type pole in Hard Laterite.
6
1303
7822.08
... More
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.
44
1086
47794.12
... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.
0.9
34792
31313.46
... More
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
30
1778
53349.6
... More
Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole
18
722
13003.38
... More
Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
10
879
8792.3
... More
Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole.
88
341
30083.68
... More
Stringing one km LT Sph 2 wire line (Rabbit) incl. fitting cross arm etc. removing touchings and conveyance of materials.
0.97
16967
16458.7
... More
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.
90
96
8656.2
... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.
6
149
897
... More
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.
4
481
1927.8
... More
Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite.
14
434
6088.74
... More
Dismantling 100kVA Transformer, erecting new 100kVA Transformer, giving connections incl. loading & unloading at site.
1
11644
11644.27
... More
Providing Stay for LT poles incl. digging & back filling pit.
9
938
8449.38
... More
Re-Tensioning one span 11kV line incl. replacing insulators, tightening stay, cutting tree branches and conveyance.
10
727
7276.4
... More
Renewing one 11kV Jumper using Copper/ACSR conductor as per standard specification (in loop formation for tapping from line).
9
432
3895.38
... More
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).
9
4028
36254.61
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock.
11
1303
14340.48
... More
Dismantling transformer station in DP structure excluding the rate of dismantling earthing
1
14935
14935.36
... More
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
28
762
21339.92