Kerala State Electricity Board Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date13 Nov 2024
Closing Date2 Dec 2024
Tender Amount₹ 1,71,12,556 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc.

9

632

5692.05

... More
Towers, tower extensions and other structure and all other materials including earthing materials.

104

447

46517.12

... More
Transport of materials issued departmentally for the works from dept. stores and distribution to locations for erection including storage, if necessary, loading and unloading charges with a lead of 50m by head load and initial lift of 1.5m at each end as directed by Board staff. - general area- by lorry (Up to 5km).

-

-

-

... More
Line conductor and earth conductor / OPGW

11.5

703

8095.89

... More
Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc.

9

781

7036.02

... More
Towers, tower extensions and other structure and all other materials including earthing materials.

104

475

49442.64

... More
Transport of materials issued departmentally for the works from dept. stores and distribution to locations for erection including storage, if necessary, loading and unloading charges with a lead of 50m by head load and initial lift of 1.5m at each end as directed by Board staff. - general area- by lorry (Over 5 Km & Upto 6 Km).

-

-

-

... More
Line conductor and earth conductor / OPGW

11.5

719

8278.16

... More
Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc.

9

799

7191.72

... More
Towers, tower extensions and other structure and all other materials including earthing materials.

104

485

50540.88

... More
Transport of materials issued departmentally for the works from dept. stores and distribution to locations for erection including storage, if necessary, loading and unloading charges with a lead of 50m by head load and initial lift of 1.5m at each end as directed by Board staff. - general area- by lorry (Over 6 Km & Upto 7 Km).

-

-

-

... More
Line conductor and earth conductor / OPGW

11.5

735

8460.32

... More
Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc.

9

816

7347.33

... More
Towers, tower extensions and other structure and all other materials including earthing materials.

104

496

51638.08

... More
Transport of materials issued departmentally for the works from dept. stores and distribution to locations for erection including storage, if necessary, loading and unloading charges with a lead of 50m by head load and initial lift of 1.5m at each end as directed by Board staff. - general area- by lorry (Over 7 Km & Upto 8 Km).

-

-

-

... More
Line conductor and earth conductor / OPGW

11.5

751

8642.48

... More
Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc.

9

833

7502.76

... More
Towers, tower extensions and other structure and all other materials including earthing materials.

104

507

52737.36

... More
Transport of materials issued departmentally for the works from dept. stores and distribution to locations for erection including storage, if necessary, loading and unloading charges with a lead of 50m by head load and initial lift of 1.5m at each end as directed by Board staff. - general area- by lorry (Over 8 Km & Upto 9 Km).

-

-

-

... More
Line conductor and earth conductor / OPGW

11.5

767

8824.99

... More
Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc.

9

850

7658.46

... More
Towers, tower extensions and other structure and all other materials including earthing materials.

104

517

53838.72

... More
Transport of materials issued departmentally for the works from dept. stores and distribution to locations for erection including storage, if necessary, loading and unloading charges with a lead of 50m by head load and initial lift of 1.5m at each end as directed by Board staff. - general area-by lorry (over 9km and upto 10km).

-

-

-

... More
Line conductor and earth conductor / OPGW

11.5

783

9007.15

... More
Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc.

9

868

7814.52

... More
Towers, tower extensions and other structure and all other materials including earthing materials.

104

528

54936.96

... More
Transport of materials issued departmentally for the works from dept. stores and distribution to locations for erection including storage, if necessary, loading and unloading charges etc. as directed by Board staff. - general area- by lorry( for every additional km and part thereof ).

-

-

-

... More
Line conductor and earth conductor / OPGW

3738.48

15

58133.36

... More
Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc.

2925

16

49637.25

... More
Towers, tower extensions and other structure and all other materials including earthing materials.

33801.37

10

354914.39

... More
Clearing light jungles including uprooting of rank vegetation,grass,brushwood,trees and saplings of girth upto 30 cm .measured at a height of 1M above ground level and removal of rubbish up to a distance 50 m outside the periphery of the area cleared

12000

7

87600

... More
Uprooting and removing palm or coconut stumps including stacking.

15

343

5155.35

... More
Uprooting and removing only stumps of trees of all girths other than palm or coconut including stacking.)

75

515

38665.5

... More
Earth work in excavation by mechanical means(Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil

310

211

65521.6

... More
Earth work in excavation by mechanical means(Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. Ordinary rock

1031

409

422369.77

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift up to 1.5 M as directed by Engineer In Charge. Hard rock (blasting prohibited)

207

1181

244522.89

... More
Earth work excavation in all kinds of soil by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 1.5 M to 3M. All kinds of soil

310

316

98087.1

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 1.5 M to 3M as directed by Engineer In Charge. Ordinary rock

1031

598

616599.86

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 1.5 M to 3M as directed by Engineer In Charge. hard rock

207

1369

283519.62

... More
Earth work excavation in all kinds of soil by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 3M to 4.5 M All kinds of soil

310

421

130649.5

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 3 M to 4.5M as directed by Engineer In Charge. Ordinary rock

1031

786

810840.26

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 3 M to 4.5M as directed by Engineer In Charge Hard rock (blasting prohibited) hard rock

207

1558

322518.42

... More
Bailing out water with engine and pump set including conveyance to site and erection cost of fuel, lubricating oil and other stores, pay of staff etc.complete .

3200

124

399776

... More
Dewatering manual (rate for 8 hrs.)

3200

129

414016

... More
Close timbering over areas including strutting,shoring and packing cavities( where ever required) complete.(Measurement to be taken of the face area timbered)

-

-

-

... More
Depth not exceeding 1.5 m

865

135

116922.05

... More
Depth exceeding 1.5 m but not exceeding 3 m

865

150

130476.6

... More
Depth exceeding 3 m but not exceeding 4.5 m

865

167

144723.15

... More
Centering and shuttering including strutting, propping etc. and removal of form work for :

1020

331

337752.6

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level with Thermo-Mechanically Treated bars

22700

97

2203716

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size) -footing

3.5

8809

30831.61

... More
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately.

270

9762

2635950.6

... More
Add for using extra cement in the items of design mix over and above the specified cement content therein

85

782

66525.25

... More
Stub setting (using template/probe) for 110 kV towers. Erection of stub, stub template, fixing of jack for supporting template, allignment and leveling for exact location of stubs of stub setting template, dismantling of template after completion of initial curing of Cement concrete, movement of template from one location to another complete, as directed by Board staff. - general area (For110 kV DC Tower)

15

10021

150316.5

... More
Pipe Earthing-Providing earthing in terminal tower as per standard specification by providing 150mm dia bore hole for a depth of 3.6m and placing of GI pipes 50 mm dia GI "C" class 3m long into the bore including cost of 600 mm dia RCC collar placing over the earth pipe and connecting the earth pipe and tower leg using 7/3.66 mm GI earth wire with lugs connecting to the pipe and fixing necessary GI clamp etc., including drilling of bore cost of all lead and lifts etc., complete

30

11165

334958.4

... More
Providing counter poise type earthing wherever necessary for tower location including extra excavation in foundation pits of towers for fixing wih G.I wire on both terminals for connection the GI pipe with tower leg fefilling with excavated earth mixed with salt and charcoal as per standard specification including cost of S fabrication of legs for connectio arrangement all other materials, transport all labour leads and lifts, etc., complete.

1160

328

381396.4

... More
Drilling bore holes of sizes 150mm or nearest in all classes of soil including hire charges of plant and machinery cost of oil ,fuel,tool etc. and taking all necessary precautions for safety to the substation equipments etc. as per the direction of departmental officers at site.

288

665

191520

... More
Driving down the ground electrode upto a depth of 12 m from the already taken earth pit as directed by the departmental officers.

24

2051

49225.92

... More
Welding of overlapping joints for mat,riser lap joints with 32/25mm MS rod placed in trenches, having 150mm in length 6mm in thick on both sides of the rod and both ends of overlapped MS rods with 6mm welding thickness after cleaning the surfaces neatly. Charges includes cost of low hydrogen DC electrode (No. E7018), hire charges of DC arc welding set and tools and plants required, current charges including labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of department officers.

60

757

45478.8

... More
Welding of overlapping joints for mat,riser lap joints with 32/25mm MS rod placed in trenches, having 150mm in length 6mm in thick on both sides of the rod and both ends of overlapped MS rods with 6mm welding thickness after cleaning the surfaces neatly. Charges includes cost of low hydrogen DC electrode (No. E7018), hire charges of DC arc welding set and tools and plants required, current charges including labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of department officers.

20

593

11871.6

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m

4350

255

1110772.5

... More
Supplying and stacking good earth at site.

60

562

33750.6

... More
Drilling of holes (Labour for drilling 16 holes)

300

166

50091

... More
Filing of holes (Enlarging)

300

90

27222

... More
Cutting of steel angles

850

333

283840.5

... More
Erection of tower super structure above ground level including erection of normal and special hill side extension members wherever necessary, providing tower accessories like phase, danger and number plates, bird guards, anticlimbing devices, including tighting ,punching and tack welding upto bottom cross arm in the bolt and nut after punching and applying zink rich primer wherever necessary etc. complete, as directed by Board staff (For 110 kV DC Tower - Average height is 22 mtrs) general area

94.43

15432

1457284.37

... More
Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work

50

64

3200

... More
Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly.

2

4952

9904

... More
Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly.

1.5

9401

14101.5

... More
Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials.

1

9198

9198

... More
Paving out, stringing and tensioning OF POWER CONDUCTORS including attaching insulator strings with arcing horns or rings on to the tower cross arms, clamping the conductor to the insulator strings using suspension clamps with armour rods and tension clamps, jumpering the conductors at tension points, jointing the conductors and pilot wire wherever necessary, installation of vibration dampers hire charges of tractor and stringing tools, etc. Complete. For 110kV AL59 Wolf conductor.

3

234358

703075.47

... More
Additional rate for Assembling of double tension/suspension string using 90KN/70KN Disc insulators,lifting the same using pulleys and ropes,fixing it on to tower crossarms with care etc. complete.

180

1486

267571.8

... More
Paving out, stringing and tensioning as per standard of one 7/10 OR 7/3.15stranded steel earth wire including fixing the conductors on to the tower top using tension clamps and suspension clamps, jumpering the conductors at tension points, jointing the conductor wherever necessary, erection of earth bonds, hire charges of tractor and stringing tools, etc. Complete. ((.46/.59)* rate for 7/3.66)

3

48984

146953.17

... More
Paving out, stringing and tensioning as per standard one OPGW including fixing the conductors on to the tower tops using tension clamps and suspension clamps , jumpering the conductor at tension points , jointing of conductor where ever necessary, erection of earth bonds, hire charges d for pulling machines, tractors and stringing tools, all hire and labour for protective trestles and providing suitable back strings at the time of stringing etc complete.

3

75269

225808.8

... More
Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and Neutral, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials except poles) from stacking place.

2

11277

22554

... More
Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.

1.5

21250

31875

... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works.

1

23128

23128

... More
Random rubble masonry with hard stone in foundation and plinth including levelling up upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand)-

90

7114

640348.2

... More
Plastering on the top of revetment with 1:4 cement mortar 20mm thick .

50

424

21230

... More
Pointing the outer faces of revetment with cement mortar 1:3

140

331

46452

... More
Rewinding of 'AL 59 Wolf/ conductor ' from dilapidated conductor drums unsuitable for transporting /paving out on to serviceable conductor drums issued departmentally including all hire charges for tools & plants necessary for rewinding.

2.5

7837

19594.6

... More
Rewinding of "7/3.15mm or 7/10 stranded steel earth wire' from dilapidated conductor drums unsuitable for transporting/paving out on to serviceable conductor drums issued departmentally including all hire charges for tools & plants necessary for rewinding

1

6347

6347.26

... More
Providing special type trussels For NH/SH road crossing, railway crossings

2

10540

21081.86

... More
Providing derrick support and temporary stay arrangement for a tower.

5

4442

22212.35

... More
Forming temporary Road 1 M ( Footpath -3 M Wide)

400

366

146628



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.