Kerala State Electricity Board Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Civil And Construction
Electrical and Electronics
Electrical Works
Eprocure
Opening Date15 Nov 2024
Closing Date3 Dec 2024
Tender Amount₹ 80,73,911 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fitting and erecting one HT DP using 'A' type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. Distribution data key No: 117

1

10473

10473.36

... More
Erection of tower super structures above ground level including erection of normal and special hillside extention members where ever necessary,providing tower accessories like phase,danger & number plates,bird guards anticlimbing device etc complete. (transmission line data item 43)

75

11758

881853

... More
Fitting and providing one Strut using 'A' type pole incl. digging & back filling pit.As per Distribution data key No: 121

2

3925

7851.36

... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.As per Distribution data key No: 119

95

1373

130504.35

... More
Fitting and providing one HT Fly stay for 11kV pole using 'A' type pole incl. digging & back filling pits.As per Distribution data key No: 123

1

5674

5674.73

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. As per Distribution data key No: 127

40

434

17396.4

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. As per Distribution data key No: 128

10

868

8687.7

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. As per Distribution data key No: 129

5

1303

6518.4

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Rock. As per Distribution data key No: 130

5

2606

13031.6

... More
Additional rate for excavation of Pit for 'A' type pole in Laterite. As per Distribution data key No: 131

40

651

26052.8

... More
Additional rate for excavation of Pit for 'A' type pole in Hard Laterite. As per Distribution data key No: 132

20

1303

26073.6

... More
Additional rate for excavation of Pit for 'A' type pole in Soft Rock. As per Distribution data key No: 133

5

1955

9775

... More
Additional rate for excavation of Pit for 'A' type pole in Rock. As per Distribution data key No: 134

1

3910

3910

... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. As per Distribution data key No:160

10

868

8687.7

... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. As per Distribution data key No:161

5

1737

8687.75

... More
Providing one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil. As Per Distribution data Key No.158

140

592

82987.8

... More
Erection of one set 33KV line Isolator on the already erected structure including opening crates and conveyance of all accessories from the place of storage to the place of erection to lines and levels including erection of mechanism box checking operation and aligning properly as per the direction of departmental officers.(as per item No: 19 of transmission data)

1

9091

9091.46

... More
Paving out, stringing and tensioning as per std of 3 line ACSR dog conductors including attaching insulator string with arcing horns or rings on to the tower crossarms, clamping the conductors to the insulator strings using suspension clamps with armour rods and tension clamps, jumpering the conductors at the tension points, jointing the conductors and pilot wire where ever necessary, installation of vibration dampers, hire charges of tractor and strining tools, all hire and labour for protective trestile work, providing suitable back stays at the time of stringing including cutting and removing tree branches wherever necessary.etc complete-

5.6

71430

400008.62

... More
Fitting and connecting 33 kV FPI. As per Distribution data key New/1.93

3

351

1053.69

... More
Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls.As per Distribution data key No: 566

3.4

14129

48039.69

... More
Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.As per Distribution data key No: 565

0.8

7443

5954.91

... More
Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls.As per Distribution data key No:567

3.5

3551

12431.06

... More
Dismantling one section fuse As per Distribution data key No:568

10

192

1923.6

... More
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.As per Distribution data key No:513

3.1

13827

42864.26

... More
Dismantling one LT 2 line cross arm from existing pole. As per Distribution data key No: 560

5

70

350.25

... More
Dismantling one LT 4 line cross arm from existing pole. As per Distribution data key No: 561

50

104

5227.5

... More
Dismantling (without damage) one 11kV 'A' type pole after disconnecting stays, strut etc. and stacking the same.As per Distribution data key No: 506

1

3130

3130.09

... More
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. As per Distribution data key No: 504

45

3129

140807.25

... More
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.As per Distribution data key No: 554

17

1923

32701.88

... More
Additional rate for refitting/redoing one disc set while renewing any type of 11kV cut pole Key No:- 324

30

722

21672.3

... More
Drilling oval shaped hole of various sizes on existing channel/crosarm/GI/MS cleat etc Key No:- 364

50

40

2038.5

... More
Cutting channel/ crossarm/angle into two pieces Key No:- 365

50

62

3136.5

... More
Additional rate for refitting/redoing one shackle set and reshackling one span while renewing any type of pole.Key No:- 405

130

341

44441.8

... More
Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. Distribution data key No: 419

10

879

8792.3

... More
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. Distribution data key No: 420

10

1778

17783.2

... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works.As per Distribution data key No: 135

3.1

34792

107857.46

... More
Stringing one km LT Sph 2 wire line (Rabbit) incl. fitting cross arm etc. removing touchings and conveyance of materials.As per Distribution data key No: 212

0.8

16967

13574.18

... More
Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials.As per Distribution data key No: 214

3.4

31957

108655.33

... More
Stringing one km LT addl conductor (rabbit) after fitting cross arm,but without realigning existing conductor,incl. Fitting crossarm,insulator etc. removing touchings and conveyance of materials. As per Distribution data key No: 216

3.5

7665

26828.45

... More
Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint. As per Distribution data key No: 776

150

69

10350

... More
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. As per Distribution data key No: 171

50

564

28227.5

... More
Dismantling one V cross arm/Channel cross arm from existing Pole, and bringing back to section store.Distribution data key No: 515

45

192

8656.2

... More
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.As per Distribution data key No: 169

45

481

21687.75

... More
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.As per Distribution data key No: 170

105

481

50604.75

... More
Fitting one Additional 2.4m Channel cross arm in existing single pole incl. conveyance of materials.As per Distribution data key No: 185

50

578

28907

... More
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.

8

564

4516.4

... More
Drilling holes of various sizes on existing Channel/cross arm. As per Distribution data key No: 363

1750

16

29277.5

... More
Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.As per Distribution data key No: 174

50

140

7004.5

... More
Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.As per Distribution data key No: 175

25

149

3737.5

... More
Fitting one additional HT pin with insulatorAs per Distribution data key No: 179

90

149

13455

... More
Additional rate for providing one disc set on any type of HT pole for making cut point.As per Distribution data key No: 115

30

158

4767.3

... More
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.As per Distribution data key No: 221

10

240

2404.5

... More
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.As per Distribution data key No: 451

130

96

12503.4

... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.As per Distribution data key No:452

50

149

7475

... More
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.As per Distribution data key No: 610

50

492

24620.5

... More
Laying of departmentally supplied GI strip/Copper strip of suitable size including cleaning and neatly bending of strips ,cutting, removing of metal/earth in the yard and burying earth strip to the required depth re-doing the yard metalling as per the direction of the departmental officers.

75

180

13564.5

... More
Dismantling of Anchor clamp / dead end clamp for LT AB cable As Per Distribution data Key No.28.27

145

77

11172.25

... More
Dismantling of suspension clamp suitable for LT AB cable As Per Distribution data Key No.28.26

10

77

770.5

... More
Erection of Anchor clamp / dead end clamp for LT ABC of any size As Per Distribution data Key No.28.5

145

164

23877.15

... More
Erection of suspension clamp for LT ABC of any size As Per Distribution data Key No.28.6

10

164

1646.7

... More
Transport of materials issued departmentally for the works from departmental stores and distribution to locations for erection including storage if necessary loading and unloading charges etc(item No:2 of data for construction of transmission lines) 1. Line conductors

7.09

2538

17995.34

... More
Transport of materials issued departmentally for the works from departmental stores and distribution to locations for erection including storage if necessary loading and unloading charges etc(item No:2 of data for construction of transmission lines) 2. Insulators and Accessories

0.5

2788

1394.18

... More
Transport of materials issued departmentally for the works from departmental stores and distribution to locations for erection including storage if necessary loading and unloading charges etc(item No:2 of data for construction of transmission lines) 3. Towers, Extension and other structures including earthing materials etc

75

1713

128475

... More
Transporting 'A' type 14m pole by Hand cart (limited to 4km).As per Distribution data key No: 106

40

566

22665.6

... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. As per Distribution data key No: 726

23

3142

72271.98

... More
Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 poles. (Running km). As per Distribution data key No: 727

23

103

2380.5

... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (As per PRICE Software Item No.2.8.1)

300

296

89082

... More
Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials. All kinds of soil (As per PRICE Software Item No.2.26.1)

100

403

40331

... More
Excavation work by mechanical means (Hydraulic excavator)/ manualmeans in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including lift upto 1.5 m, including getting out the excavated soil and disposal ofdressing of sides and ramming of bottoms, surplus excavated soils as directed, within a lead of 50 m, in ordinary rock -DSR 2.9.1

60

527

31650.6

... More
Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials. Ordinary or hard rock (As per PRICE Software Item No.2.26.2)

10

718

7182.9

... More
Excavation work by mechanical means (Hydraulic excavator)/ manualmeans in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including lift upto 1.5 m, including getting out the excavated soil and disposal ofdressing of sides and ramming of bottoms, surplus excavated soils as directed, within a lead of 50 m, in hard rock (Blasting prohibited)-DSR 2.9.3

20

1271

25438

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) (As per PRICE Software Item No.15.2.1)

2

2045

4090.34

... More
Close timbering in case of shaft,well,cesspit ,manhole and the like including strutting,shoring and packing cavities( where ever required) complete.( Measurement to be taken of the face area timbered)Depth exceeding 1.5M but not exceeding 3M (As per PRICE Software Item No.2.17.2)

240

191

45916.8

... More
Open timbering in case of shaft,well,cesspit ,manhole and the like including strutting,shoring and packing cavities (where ever required) complete. (Measurement to be taken of the face area timbered)Depth exceeding 1.5M but not not exceeding 3M (As per PRICE Software Item No.2.22.2)

120

57

6849.6

... More
Providing and laying in position cement concrete of specified grade, excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 cement : 3 coarse sand (zone-III): 6 graded stone aggregate 20 mm nominal size).

99

7367

729387.45

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.

4000

98

393200

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases of columns, etc. for mass concrete. Item No.5.9.1 (As per PRICE Software)

1000

335

335310

... More
Stub setting in lines and levels using template in concrete foundation for 14 m A,B,C type lattice towers,etc as per specification and as directed by the departmental staff at site.( Paivalike-Kubanoor 33 kV line Data Sl. No : 06) (Guruvayur-Blangad covered conductor line work under Transmission division,Thrissur

49

2595

127159.9

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size).

275

9085

2498413.5

... More
Filling available excavated earth (Excluding rock) in trenches, Plinth, side of foundation etc, in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming and watering lead up to 50 M lift up to 1.5 M (As per PRICE Software item no: 2.25 )

372

258

96188.04

... More
Bailing out water with engine and pump set including conveyance to site and erection cost of fuel, lubricating oil and other stores, pay of staff etc.complete (Transmission labour data Sino.108)

10

123

1232.7

... More
Dewatering Manual (Transmission line data Item No:109

16

109

1757.6

... More
Welding charge for welding on iron parts using arc welding as per standards As per Transmission Data for Substation works item# 74

50

112

5642.5

... More
Transportation of 33 kV 3x300 mm2 UG cable with drum from the storage place to location at an average distance of 10km including all charges for loading, unloading, placing in exact places suitably, returning the balance bit to store etc. complete - up to 5 km (Transmission Line data-APPENDIX - I,Serial No.a)

4

954

3818.16

... More
Loading 3x300 sq. mm XLPE cable from its place of storage to department lorry and properly without causing any damage to its insulation and make ready for transporting as per the direction of department officers. (Tr data 109a)

300

36

10899

... More
Unloading 3x300 sq. mm XLPE cable from department lorry to substation site and stacking properly without causing any damage to its insulation as per the direction of department officers. 75% of item No.108

300

27

8175

... More
Un coiling & laying of one number 3x300 mm2 33KV Aluminium XLPE cable including loop length direct in ground including excavation, sand cushioning, fixing of protection slab, refilling the trench etc. as per the direction of department staff

300

577

173283

... More
Mounting one 3x300 mm2 33kV XLPE out door cable termination of structures very carefully without causing any damaged to the drilling holes wherever necessary as directed by the departmental officers

2

1422

2845.48

... More
Doing out door/indoor cable termination of 3x300 mm2 33KV XLPE cable very carefully observing directions of manufactures and departmental staff including crimping of socket (Transmission data 64(a)

2

7646

15293.46

... More
Supply and fixing Aluminium identification tags 150X150x1mm thick embedded with “ KSEBL 33kV CABLE CHIRAKKAL - ANTHIKKAD”

2

165

330.12

... More
Supplying and fixing cable route marker with 10 cm X 10 cm X 5 mm thick G.I. plate with inscription there on, bolted /welded to 35 mm X 35 mm X 6 mm angle iron, 60 cm long and fixing the same in ground as required.Supplying, connecting and working danger lights in full night for detecting the place where the cable trench are situated, all the connections like wires, light holders, danger lights,diesel generator etc complete. Charges for all materials and labour

30

455

13667.4

... More
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth. ( As per PRICE Software Code 2.33.1)

15

447

6719.85

... More
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth ( As per PRICE Software Code 2.33.2)

5

1994

9972.3

... More
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth upto and including 240 cm girth ( As per PRICE Software Code 2.33.3)

1

9252

9252.59

... More
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Above 240cm ( As per PRICE Software Code 2.33.4)

1

18539

18539.15

... More
Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. ( Price software, item no: 50.2.33.5)

5

307

1536.9

... More
Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. ( Price software, item no: 50.2.33.6)

5

550

2754.5

... More
Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. ( Price software, item no: 50.2.33.7)

2

750

1500.58

... More
Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. ( Price software, item no: 50.2.33.8)

1

1013

1013.94



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.