Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 18,400Document Cost
₹ 1,770Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KSEB_722289_1Tender No
TENDER NO.79/PMU/SKPM/2024-25 dt28/12/2024Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://http://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.
10
481
4819.5
... More
Fitting one set AB switch and giving connection
2
2795
5591.1
... More
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.
1
564
564.55
... More
Drilling hole of various sizes on existing Channel/Cross Arm.
46
16
769.58
... More
Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
1
8735
8735.82
... More
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
30
762
22864.2
... More
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.
8
481
3855.6
... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.
1
34792
34792.73
... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.
11
3142
34564.86
... More
Providing one Earth using earth pipe incl. digging & backfilling pit and supply of charcoal, salt, sand etc.
10
4245
42455.9
... More
Installing one DTR Meter with box on existing poles and giving the complete connections incl. conveyance of materials.
1
3758
3758.41
... More
Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line.
5
351
1756.35
... More
Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation
25
1589
39743
... More
Providing yard metalling with 6mm & 40mm thick blue metal as specified after constructing a curb wall.
15
769
11537.7
... More
Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
2
10473
20946.72
... More
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.
31
96
2981.58
... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.
11
149
1644.5
... More
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.
22
492
10833.02
... More
Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).
11
906
9970.51
... More
Providing Strut using LT PSC pole incl. digging & back filling pit.
5
1887
9435.25
... More
Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking.
8
1589
12712.72
... More
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
24
1923
46167.36
... More
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
3
1008
3026.58
... More
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).
11
4028
44311.19
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.
30
868
26063.1
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock.
35
1303
45628.8
... More
Additional rate for excavation of Pit for A type pole in Hard Laterite.
5
1303
6518.4
... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite.
5
1737
8687.75
... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock.
5
2606
13031.6
... More
Erecting one LT PSC Pole in position incl. digging & back filling pit.
2
2017
4035.46
... More
Fitting one additional HT pin with insulator
3
149
448.5
... More
Providing Stay for LT poles incl. digging & back filling pit.
2
938
1877.64
... More
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.
1
4805
4805.95
... More
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.
5
3056
15284.55
... More
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.
27
1086
29328.21
... More
Additional rate for providing one disc set on any type of HT pole for making cut point.
15
158
2383.65
... More
Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
8
879
7033.84
... More
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
35
1778
62241.2
... More
Additional rate for excavation of Pit for A type pole in Soft Rock.
6
1955
11730
... More
Fitting 6 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses.
1
11469
11469.68
... More
Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole.
8
341
2734.88
... More
Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint.
50
69
3450
... More
Brick work in cement mortar for superstructure as per the direction of departmental staff.
2
9262
18524.16
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements