Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala State Electricity Board - KSEB Tender
Software and IT Solutions
Telecommunication Services
Electrical and Electronics
Electrical Works
Eprocure
Opening Date30 Jul 2024
Closing Date21 Oct 2024
Tender Amount₹ 2,11,00,00,000
Costs
EMD
₹ 5,00,000Document Cost
₹ 17,700Tender Fee
Refer Documents
Summary
Supply Installation,system Integration, O And M Of Smart Meters Phase-1
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KSEB_682722_1Bid Award Id
ViewTender No
CEIT/SM-P1/KSEBL/2024-25/03 dated 27.07.2024Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://http://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
3 phase whole current Smart Meter (with Net-Metering) LT Meter: 10 / 20 – 100 A with polycarbonate/SMC weather proof outdoor type meter cover box. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box.
2300
-
-
... More
3 phase LT-CT operated Smart Meter (with Net-Metering) -/5A, Accuracy class 0.5S, LT Meter with CTs, control cables etc. (Exl. Meter Box)
800
-
-
... More
3 phase CT/PT operated Smart Meter (with Net-Metering) – HT Meter --/5A/1A of Accuracy class 0.2S with control cables (Exl. Meter Box and DI)
7630
-
-
... More
3 phase LT-CT operated Smart Meter – DT Meter(with Net-Metering) -/5A, Accuracy class 0.5S, CTs, control cables etc. (Exl.Meter Box & DI)
91760
-
-
... More
3 phase CT/PT operated Smart Meter – Feeder Meter -/5A /1A of Accuracy class 0.5S, control cables etc. (Exl. Meter Box & DI)
3000
-
-
... More
3 phase CT/PT operated Smart Meter – Boundary Meter with net metering -/5A /1A of Accuracy class 0.5S with Net metering, control cables etc. (Exl. Meter Box & DI)
1200
-
-
... More
SMC/ Deep drawn MS sheet weather proof Outdoor type meter cover box for 3 phase LT-CT operated Smart Meter (with Net-Metering and prepaid functionality) -/5A, Accuracy class 0.5S, LT Meter with CT. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box.
800
-
-
... More
SMC/ Deep drawn MS sheet weather proof Outdoor type meter cover box -3 phase LT-CT operated Smart Meter – DT Meter. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box.
91760
-
-
... More
Deep drawn MS sheet weather proof Outdoor type meter cover box-3 phase CT/PT operated Smart Meter (with Net-Metering and prepaid functionality) – HT Meter. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box.
1200
-
-
... More
Deep drawn MS sheet weather proof Outdoor type meter cover box-3 phase CT/PT operated Smart Meter (with Net-Metering and prepaid functionality) – HT Meter. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box.
7630
-
-
... More
Communication Network Infrastructure & Connectivity for the project area, including Supply of all hardware equipment (SIM cards/DCU/Gateways etc.) and integrated software components/ associated accessories required for the successful establishment and operation of communication network inclusive of 7 years OEM warranty (from date of commissioning).
-
-
-
... More
Planning, Supply, Setup, testing and commissioning of RF Communication Network Infrastructure & Connectivity consisting of DCU/Gateways etc. (inclusive of 7 years OEM warranty) as required for the successful establishment of connectivity for all Smart Meters feasible as per design proposed by bidder, terminated at the AMI-DC collocated at KSEBL DC, and also at the AMI-DC at KSEBL DRC.
1
-
-
... More
Head End System software (HES),NMS and other softwares
-
-
-
... More
Supply, installation, integration, testing and commissioning of HES, NMS and other related software applications, including perpetual licenses for Operating Systems and Database and Applications with 1 year warranty, for 300,000 users/ consumers/ smart meters at KSEBL-DC
1
-
-
... More
Supply, installation, integration, testing and commissioning of HES ,NMS, other related software applications, including perpetual licenses for Operating Systems and Database and Applications with 1 year warranty, for 300,000 users/ consumers/ smart meters at KSEBL-DRC
1
-
-
... More
Configuration, customization, business process/ systems integration with MDMS and any other Utility Applications, Ticketing tool, Consumer Portal, development of Analytics Reports, SLA dashboard etc. as necessary for successful operation of this project
1
-
-
... More
Design, Development & deployment of allied IT applications as required by KSEBL for performance monitoring & execution of entire project. 1. Meter & SIM inventory Management
2. Smart Meter Installation & Consumer Indexing
3. SLA monitoring tool
1
-
-
... More
Connectivity Charges(GPRS/LTE/4G/5G/NBIoT) Connectivity Charges (actuals, on pro-rata basis) for the project period of 72 months
291690
-
-
... More
Interim FMS (for the period from commissioning for a set of meters to Enterprise wide go live ) for the maximum of 18 months
291690
-
-
... More
Operation and Maintenance charges *
-
-
-
... More
Facility Management Services (FMS)
-
-
-
... More
Smart Meter, HES & Communication Network Operations & Reporting at NOMC including Manpower
-
-
-
... More
– Year 1
1
-
-
... More
– Year 2
1
-
-
... More
– Year 3
1
-
-
... More
–Year 4
1
-
-
... More
–Year 5
1
-
-
... More
–Year 6
1
-
-
... More
Field Operations - Smart Metering & communication infrastructure Technical Support & Network Infrastructure Operation & Maintenance, including Manpower.
-
-
-
... More
– Year 1
1
-
-
... More
– Year 2
1
-
-
... More
– Year 3
1
-
-
... More
–Year 4
1
-
-
... More
–Year 5
1
-
-
... More
–Year 6
1
-
-
... More
Annual Technical Support (ATS) for a period of 6 years after completion of warranty of one year
-
-
-
... More
from OEM – for HES
-
-
-
... More
– Year 1
1
-
-
... More
– Year 2
1
-
-
... More
– Year 3
1
-
-
... More
–Year 4
1
-
-
... More
–Year 5
1
-
-
... More
–Year 6
1
-
-
... More
for all other related applications software.
-
-
-
... More
– Year 1
1
-
-
... More
– Year 2
1
-
-
... More
– Year 3
1
-
-
... More
–Year 4
1
-
-
... More
–Year 5
1
-
-
... More
–Year 6
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements