Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala State Electricity Board - KSEB Tender
Cable and Wires
Eprocure
Opening Date15 Dec 2020
Closing Date28 Dec 2020
Tender Amount₹ 47,62,132 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 50,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Construction Of Foundations For Equipments, Structures, Cable Trench Etc At 110kv Substation, Kazhakuttom For Providing Additional Power To The Extent Of 3 Mva Each To M/s Technopark Phase 1, 2, 3 Campuses
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_KSEB_400795_1Bid Award Id
ViewTender No
BID No. 2/ TSD-VELI/ 2020-21 dtd 11-12-2020Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://http://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered). Depth not exceeding 1.5 m
40
-
149.72
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 40 mm nominal size)
30
-
6640.71
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
10
-
6176.71
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
240
-
7962.22
... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete
600
-
267.52
... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
250
-
522.2
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
16500
-
78.07
... More
12 mm cement plaster of mix 1:4 (1 cement: 4 fine sand)
430
-
238.55
... More
Demolishing Stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge
25
-
1387.16
... More
Placing in position of precast RCC slab over the trench as directed by th deptl. Officers at site
51
-
802.66
... More
Stub setting in correct alignment for Isolators , surveying and fixing the stubs using template for the set including cost for removing the template after the expiry of the pre-determined time etc. complete as per the direction of dept staff at site
15
-
402.82
... More
Fixing foundation bolt for Equipments such as CT, LA, CVT, CB and other equipment, columns using template into concrete structures at the time of concreting as per directions of the departmental officers at site.
90
-
169.83
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
200
-
173.45
... More
Fabrication of structures for erecting equipments. The GI & MS angles will be supplied departmentally
15
-
2446.75
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements