Kerala State Electricity Board Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Civil And Construction
Eprocure
Opening Date6 Jun 2024
Closing DateCancelled
Tender Amount₹ 23,86,360 
Notes
Download

Costs

Summary

Construction Of Ht Abc From Moonnamparabu To Bharaniparambu

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm

144

53280

370

... More
Fiting One no MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable

126

24318

193

... More
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.

21

11855

564.55

... More
Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles

6500

296530

45.62

... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.

33

103694

3142.26

... More
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

114

86883

762.14

... More
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.

0.18

2419

13827.18

... More
Insertion of one HT PSC pole in existing HT/LT line incl. digging & back filling pit, fitting cross arm, insulator, binding etc.

56

229029

4089.82

... More
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.

23

11084

481.95

... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.

140

192322

1373.73

... More
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.

105

186723

1778.32

... More
Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole.

280

95720

341.86

... More
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.

280

26930

96.18

... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.

78

11661

149.5

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Rock.

10

26063

2606.32

... More
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.

9

27512

3056.91

... More
Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).

16

14502

906.41

... More
Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

10

17960

1796.09

... More
Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials.

10

5425

542.59

... More
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.

43

97461

2266.55

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.

35

30406

868.77

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.

40

17396

434.91

... More
Providing one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil.

8

4742

592.77

... More
Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.

4

34943

8735.82

... More
Fitting one set AB switch and giving connection

5

13977

2795.55

... More
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.

8

3855

481.95

... More
Renewal of existing damaged/broken old 11kV Stay to the existing stay rod.

25

14113

564.55

... More
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.

102

110795

1086.23

... More
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

27

27239

1008.86

... More
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

20

38472

1923.64

... More
Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

41

134248

3274.36

... More
Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

16

66290

4143.14

... More
Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls.

3.5

49452

14129.32

... More
Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls.

3.5

11731

3351.73

... More
Stringing one km LT 3ph 5 wire line (Rabbit for Ph and Weasel for N&St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials.

3.5

135638

38753.95

... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.

0.18

6088

34792.73

... More
Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole

27

19505

722.41

... More
Fitting one set (3No.) 11kV LA and giving connections excluding earthing.

14

6747

481.95

... More
Providing Cable Tie

1400

5390

3.85



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.