Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 23,700Document Cost
₹ 2,242Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KSEB_719344_1Tender No
TSDK/E-Tender 07/2024-25/23.12.2024Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General conditions of etendering
BOQ Items
... More
Unloading 1x500 sq. mm XLPE cable from department lorry to substation site and stacking properly without causing any damage to its insulation as per the direction of department officers.
250
8
2133.25
... More
Unpacking the transformer / feeder C&R panels, 110V battery charger, OLTC cubicle LT panel at the place of storage transporting to the place of erection and erecting after providing foundation bolt keeping to lines and levels as per the direction of departmental officers.
1
5005
5005.83
... More
Uncoiling 20/19 core 2.5sqmm, 12 core 4 sqmm control cable (Armoured or un armoured) from cable drums cutting to required length and laying through trench/pipe/cable tray grouping the same neatly using cable tie and carefully including for providing loop wherever necessary and providing cable marker at both ends of cable as per direction of departmental staff at site.
645
53
34539.75
... More
Uncoiling 12/7/6 core 2.5 sq mm control cable (armoured and un armoured) from cable drums and cutting to required length and laying through trench/pipe/cable tray grouping the same neatly using cable tie and carefully including for providing loops wherever necessary and cable marker, at both ends of cable as per direction of departmental staff at site.
975
40
39026.33
... More
Uncoiling 4/2 core 2.5sqmm control cable (armored or unarmored) from cable drums and cutting to required length and laying through trench/pipe/cable tray neatly and carefully including for providing loops wherever necessary and cable marker at both ends of cable as per direction of departmental staff at site.
845
38
32862.05
... More
Uncoiling 5/4/3/2 core 4sqmm control cable(armoured or un armoured) from cable drums and laying through trench/pipe/cable tray neatly and carefully including for providing loops wherever necessary and cable marker at both ends of cable as per direction of departmental staff at site.
565
37
21176.2
... More
Termination of cables in panel by using cable glands of fixing the cable rigidly by any means as per direction of departmental staff at site charges include for providing necessary suitable hole in the gland plate etc.20/19 core 2.5sqmm cable/12 core 4 sqmm cable (using gland of size 28-32mm)
18
384
6923.52
... More
Termination of cables in panel by using cable glands of fixing the cable rigidly by any means as per direction of departmental staff at site charges include for providing necessary suitable hole in the gland plate etc.12/7/6 core 2.5 sqmm cable (using gland of size 25mm)
26
315
8203.52
... More
Termination of cables in panel by using cable glands of fixing the cable rigidly by any means as per direction of departmental staff at site charges include for providing necessary suitable hole in the gland plate etc.4/2 core 2.5 sq mm cable/4/2 core 4 sq mm cable (using gland of size 16-22mm)
70
269
18863.6
... More
Doing termination of all sizes of PVC insulated copper control cable 2.5 mm², pealing, providing number and letter ferrules in the wire, stripping ends, crimping with suitable lugs and connecting to the terminals in the panel board and marshalling kiosk etc., neatly and carefully including cost of copper sockets and ferrules as per the direction of Departmental Officers at site.
590
69
41064
... More
Doing termination of all sizes of PVC insulated copper control cable 4.0 mm², pealing, providing number and letter ferrules in the wire, stripping ends, crimping with suitable lugs and connecting to the terminals in the panel board and marshalling kiosk etc., using cable tie and cable tie neatly and carefully including cost of copper sockets and ferrules as per the direction of Departmental Officers at site.
135
71
9585
... More
Supplying aluminium cable tags punching number and alphabets up to 7 digits and binding to cable using copper wire including cost of all materials as per the direction of Board Officials at site.
88
52
4590.96
... More
Laying 1 x 500 sq mm XLPE cables in trench including drawing through pipes wherever necessary -
250
128
32150
... More
Doing out door/indoor cable termination of 1x500 mm2 11KV XLPE cable very carefully observing directions of manufactures and departmental staff including crimping of socket
8
2335
18680.8
... More
Mounting one 1x500 mm2 XLPE out door cable termination of structures very carefully without causing any damaged to the drilling holes wherever necessary as directed by the departmental officers
4
870
3480.76
... More
Erection of 1 No. 11kV LA (station type ) /11kV Post insulator on the already erected structure after opening of crates at the place of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers.
3
816
2449.65
... More
Fabrication of structures for erecting equipments. The GI & MS angles will be supplied departmentally
20
3845
76900.6
... More
Drilling holes in yard structure
150
61
9180
... More
Cutting of steel angle in yard structure erection
50
212
10613
... More
Welding charge for welding on iron parts using arc welding as per standards
50
135
6779.5
... More
Preparing wiring schedule per transformer / feeder bay of 110 or 66kV with details of type of cable, core and colour, ferrule No. and terminal no of equipments/panels including giving full details in A4 sheet with computer print providing outer border line and sheet no etc. and supplying in the shape of book with special binding etc. and assisting the departmental officers at the time of relay testing and commissioningMaster copy
1
9197
9197.88
... More
Additional copy of the above with spiral binding
4
374
1497.4
... More
Welding one end of the GI strip 50x6mm with the structure with a welding length of 50mm & 6mm thickness on both sides & end of the strip and connecting other end with bolts & nuts if required including hire charges of DC arc welding set, current charges, cost of low hydrogen DC arc welding electrodes (No.E7018) cost of anti corrosive paint etc. complete.
20
378
7560.2
... More
Welding one end of the bended GI strip of size 50x6mm with the riser of the already laid earth mat, welding 150mm in length, 6mm thick on both sides & end of the strip & other end of the strip with yard structure at 2 points 50mm apart each welding points having 50mm length and 6mm thick on both sides & end of the strip including the charges for connecting the strip with structure using bolted joints as per the directions of the department officers. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes(No.E7018) cost of anti corrosive paint etc. complete.
30
554
16644.6
... More
Welding overlapping joints of 50x6mm GI strip with 50mm long, 6mm thick welding on all three sides after doing 2 Nos. bolted joints at the centre as specified after cleaning the surface. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes( No.E7018) cost of anti corrosive paint etc. complete.
60
284
17047.2
... More
Welding one end of the bended GI strip of size 50x6mm with the riser of the already laid earth mat, welding 150mm in length, 6mm thick on both sides & end of the strip and connecting other end with nuts & bolts if required as per the directions of the department officers. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes(No.E7018) cost of anti corrosive paint etc. complete.
25
523
13096.25
... More
Laying of departmentally supplied GI strip/Copper strip of suitable size including cleaning and neatly bending of strips ,cutting ,removing of metal/earth in the yard and buying earth strip to the required depth re-doing the yard metalling as per the direction of the departmental officers
80
188
15102.4
... More
Collecting from store or substation wherever available tools and materials such as jacks pulling and lifting machines,rails,sleepers, plies, ropes, empty drums, dummy plates, bolts and nuts gaskets, etc. including loading and unloading in department vehicle and accompanying and returning the same after completing the work as per the direction of departmental officers.( Only if required)
1
13981
13981
... More
Dismantling the radiator, conservator tank, EHV bushing turret, connecting pipes, cooling fans, meters, breathers, Bucholz relays of a 110/11KV or 66/11KV 12.5 / 10 MVA transformer after draining the oil to the required level and blocking the bushing turret, radiator pipe etc. where ever necessary as per the direction of the departmental officer, safely with out damaging any equipment and observing all safety precautions.
1
42196
42196.22
... More
Turning the transformer of weight 20T to 30T,up to 90 degree using required tools safely and taking all precautions as per the directions of the departmental officers ( only if it is absolutely necessary and where departmental crane is not available)
2
20180
40361.4
... More
Pulling the power transformers of weight 20T to 30T, on the rail track, travelling for a distance up to 30M, using sleepers, rails, jacking, as per the direction of departmental officers at site, safely without damaging any equipments and observing all safety precautions.
2
19044
38088.6
... More
Loading to the department lorry the accessories of 10/12.5MVA transformer such as bushings with proper package, coolers, conservator tank, connecting pipes, bolt and nuts, wheels, rollers, fans, driving mechanism, cooler control box and oil drums etc. safely fastening them properly, accompanying the vehicle with transformer from 66 kV Substation Kothamangalam to 66 kVSubstation Karimanal and unloading and stacking in convenient place, taking all safety precautions as per the direction of departmental officers.
1
42843
42843.2
... More
Loading of power transformers of weight 20T to 30T, carefully and safely by jacking up inch by inch using rails sleepers etc. and placing on the tractor trailer safely, positioning correctly and fastening with steel ropes tightening using turn buckles etc. with out causing damage to transformer and accessories as per the direction of the departmental officer observing all safety precautions and make it ready for transporting (Distance to be specified).
1
30548
30548.3
... More
Accompanying the tractor trailer with transformer 10 /12.5MVA from 110 kV substation Pala to 66kVsubstation Karimanal with sufficient men to give supports for lifting of service wire/ telephone wires, HT/EHT lines etc. where ever necessary using bamboo structures and giving signals to vehicles also removing other obstruction on the way, filling the gutters where ever necessary using earth, metal etc.
1
7276
7276.8
... More
Unloading the power transformers of weight 20T to 30T, carefully and safely inch by inch inserting rails and trawling to the platform made with sleepers and thus lowering very carefully inch by inch for placing on the rail track and hoisting to the plinth with out causing damage to transformer and accessories as per the direction of the departmental officer observing all safety precautions.
1
30692
30692.4
... More
Covering the transformer with tarpouline using ropes bamboos etc.
1
3294
3294.25
... More
Giving three phase connection to the filter unit from the supply mains using cable including fitting three numbers of fuse units near the filter unit and laying the cable from the control room to filter unit and trail run of filter unit after giving connections etc,complete(only if found absolutely necassary and where departmental staff is not available)
1
1995
1995.43
... More
Loading the 6000/5000litre/hr.or above transformer oil filter plant to lorry using tripod, chain block, pulley block, rope etc., after pulling it to the convenient position for lifting and fixing it firmly for safe transportation to the location as directed by department officers, unloading the same without causing any damage and placing it carefully at convenient place etc. complete as directed by department officers at site where ever required.
1
27058
27058.93
... More
Loading the empty oil tank of capacity 3500/5000 Ltr. From the place of its storage using wooden blocks, lever etc. and moving the tank to a distance of 10M from switch yard then loading the same to the dept. vehicle using chain pulley etc. carefully tying the tank in vehicle accompanying the vehicle up to Karimanal substation, removing ties and unloading the tank carefully by the use of wooden blocks rails, chain pulley etc. again moving the tank to a distance of 50M, for safe storage.
1
26966
26966.56
... More
Turning and shifting 6000L/H capacity transformer oil filtering plant or wheel monted 10000/15000 ltr oil tank with all accessories for a distance of 20M to road towing the machine with department lorry by the use of D shackle and iron ropes,accompanying the lorry including supervision through out the journey especially in turning to avoid falling of plant.remove the machine from the lorry and drag up to 10M for safe storage
2
4339
8679.96
... More
Oil draining using 5000LPH capacity oil filtering plant after placing the filtering plant in a suitable place near to the transformer and empty tank.operating the plant and filling the old oil into the empty oil barrel and shifting the sama to a distance upto 50mtr for safe storage from a 10/12.5 MVA 110 or 66/11KV Transformer
1
5592
5592.42
... More
Band bolt removing and lifting the upper cover and placing the same in a safe place and refitting after the repair works etc.complete work as per the direction of departmental officers
1
21949
21949.75
... More
Cleaning the inside of core,hot oil jet washing and cleaning the inside tank.Reffiting the upper cover with gasket
1
25934
25934.1
... More
Replacing the gasket with the departmentally supplied gasket after removing the pld gasket including supplying of materials required such as sand paper,glue,new teflon washer for cooling fin's air nuts,acrolithic sheet for oil gauge etc.including cleaning of all accessories which are dismantled
1
16877
16877.59
... More
Reassembling of all the accessories like HV and LV bushings,conservator tank,all pipelines,cooling fins valves and relays etc
1
35414
35414.84
... More
Hot oil circulation after draining oil from transformer, evacuating the transformer by using vacuum pump after providing LT connection to the pump , connecting the hose to transformer, operating carefully and continuously for attaining sufficient vacuum and keeping in vacuum for 24 hours and operating filter unit carefully and continuously for 24 hours except halt due to poor voltage and trouble in filter plant etc complete as per the direction of dept. officers.
5
5731
28657.9
... More
Disconnecting the power connections to the filtering plant/vaccuum pump,coiling the cable disconnect the hoses and coiling them and folding and removing the tarpouline used for covering the transformer moving the filter plant and vacuum pump to a distant place as directed by the departmental staff(where departmental staff is not available and found neccassary )
1
948
948.07
... More
Overhauling of OLTC of 110/33,110/11,66/33 or 66/11kV transformers by lifting diverter switch after draining oil inside the OLTC chamber , cleaning the contacts, removing sledges from the tank, refilling the chamber with new oil supplied by the board.
1
9778
9778.79
... More
Dismantling already laid 3 x 300 sq mm XLPE cables in trench
70
128
9001.65
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%