Kerala State Electricity Board Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Electrical Goods and Equipments
Eprocure
Opening Date8 Mar 2019
Closing Date19 Mar 2019
Tender Amount₹ 8,89,185 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Transporting Transformers by hired vehicle upto 5km and upto 2 No. of 63 to 250kVA Transformers / RMUs excluding loading & unloading.

2

-

1428.57

... More
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

2

-

2081

... More
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.

0.2

-

9198

... More
Dismantling (without damage) one HT stay incl. back filling, and bringing back to section store.

3

-

601

... More
Dismantling one V cross arm/Channel cross arm from existing Pole, and bringing back to section store.

13

-

128

... More
Dismantling one Channel cross arm from existing DP structure, and bringing back to section store.

33

-

188

... More
Dismantling (without damage) one AB switch from existing structure and bringing back to section store.

3

-

1115

... More
Dismantling one HT pin insulator with pin and bring back to section store.

9

-

128

... More
Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole

24

-

480

... More
Renewing one 11kV Jumper using Copper/ACSR conductor as per standard specification (in loop formation for tapping from line).

15

-

288

... More
Renewing one 11kV Jumper connection using Copper/ACSR conductor as per standard specification.

6

-

201

... More
Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

3

-

2178

... More
Fitting and erecting one HT 'A' type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

2

-

2756

... More
Additional rate for providing one disc set on any type of HT pole for making cut point.

30

-

105

... More
Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.

7

-

5810

... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.

15

-

914

... More
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.

2

-

2033

... More
Insertion of one HT PSC pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc.

1

-

2283

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.

25

-

578

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock.

10

-

867

... More
Additional rate for excavation of Pit for 'A' type pole in Soft Rock.

2

-

1301

... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.

0.21

-

23128

... More
Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses.

2

-

7254

... More
Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation.

2

-

4759

... More
Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line.

6

-

233

... More
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.

26

-

1508

... More
Providing one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil.

8

-

395

... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock.

8

-

1735

... More
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.

4

-

723

... More
Fitting one set (3No.) 11kV LA and giving connections excluding earthing.

5

-

320

... More
Fitting one set (3No.) 11kV DO Fuse and giving connection.

1

-

320

... More
Fitting one set AB switch and giving connection

9

-

1859

... More
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.

11

-

320

... More
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.

3

-

320

... More
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.

59

-

376

... More
Fitting one Additional 3m Channel cross arm (35x35x5mm), in existing 11kV DP incl. conveyance of materials.

14

-

353

... More
Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.

63

-

93

... More
Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.

13

-

139

... More
Fitting one additional HT pin with insulator

33

-

99

... More
Fitting one additional F top bracket

7

-

99

... More
Insertion of one HT PSC pole in existing HT/LT line incl. digging & back filling pit, fitting cross arm, insulator, binding etc.

1

-

2720

... More
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

1

-

671

... More
Dismantling one LT 2 line cross arm from existing pole.

15

-

46

... More
Dismantling one LT 4 line cross arm from existing pole.

4

-

70

... More
Dismantling (without damage) one span of HT or LT cradling and stacking the same neatly and in good condition for re-use.

1

-

815

... More
Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.

0.04

-

4952

... More
Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls.

0.16

-

9401

... More
Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls.

0.04

-

2230

... More
Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole.

43

-

227

... More
Renewing one LT Jumper connection usingCopper/ACSR conductor as per standard specification.

8

-

67

... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.

5

-

99

... More
Stringing one km LT Sph 3 wire line (Rabbit for Ph&N, Weasel for St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials.

0.04

-

15798

... More
Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials.

0.143

-

21250

... More
Excavation of cable trench in all classes of soil and backfilling after laying of cable (excluding laying of cable).

800

-

197

... More
Additional rate for excavation of cable trench in exceptionally hard conditions ( like in *ordinary rock).

600

-

112

... More
Additional rate for excavating trench on tarred/concrete surface of specified size.

200

-

181

... More
Laying HT XLPE UG cable (of sizes beyond 3x185 sqmm and upto and incl. 3x300 sqmm) as per specification excl. excavation and backfilling.

800

-

349

... More
Mounting the cable ends of all sizes upto and incl. 3x300 sq mm with special type cable clamps incl. cost of extra materials if needed and giving necessary connections.

8

-

778

... More
Doing one cable end termination on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally.

8

-

1281

... More
Doing straight joint on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally as per specification.

3

-

2148



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.