Kerala State Electricity Board Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Civil And Construction
Eprocure
Opening Date20 Sep 2022
Closing Date3 Oct 2022
Tender Amount₹ 38,74,559 
Notes
Download

Costs

Summary

Erection Of Eht Towers At Both Sides Of Mahe River Including Stringing Of 11kv Double Circuit Line Across The River For Electricity Department, Mahe Under Deposit Work

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Towers, tower extensions and other structure and all other materials including earthing materials.

14

-

598.91

... More
Transport of materials issued departmentally for the works from dept. stores and distribution to locations for erection including storage, if necessary, loading and unloading charges etc. by lorry (up to 5 Km) (Transmission Data based on PWD SoR 2018- Sl No.2)

-

-

-

... More
Line conductor and earth conductor.

0.85

-

942.65

... More
Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc.

0.66

-

1046.81

... More
Towers, tower extensions and other structure and all other materials including earthing materials.

14

-

636.57

... More
Transport of materials issued departmentally for the works from dept. stores and distribution to locations for erection including storage, if necessary, loading and unloading charges etc. by lorry (up to 10Km) (Transmission Data based on PWD SoR 2018- Sl No.2)

-

-

-

... More
Line conductor and earth conductor.

0.85

-

1048.75

... More
Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc.

0.66

-

1162.63

... More
Towers, tower extensions and other structure and all other materials including earthing materials.

14

-

707.31

... More
Transport of materials issued departmentally for the works from dept. stores and distribution to locations for erection including storage, if necessary, loading and unloading charges etc. by lorry ( Additional kms after 10km ) (Transmission Data based on PWD SoR 2018- Sl No.2)

-

-

-

... More
Line conductor and earth conductor.

0.85

-

20.82

... More
Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc.

180.68

-

22.73

... More
Towers, tower extensions and other structure and all other materials including earthing materials.

3836

-

14.06

... More
Clearing jungle excluding uprooting of rank vegetation, grass, brush wood,trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. (CPWD DSR 2018 code No.2.31)

300

-

7.3

... More
Earth work in excavation by mechanical means(Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. (CPWD DSR 2018 Code No 2.6.1)

51

-

211.36

... More
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials -1.5m to 3m (CPWD DSR 2018- Code No. 2.26 )

-

-

-

... More
a) All kinds of soil

36

-

316.41

... More
b) Ordinary or hard rock

19

-

598.06

... More
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials -3m to 4.5m (CPWD DSR 2018- Code No. 2.26)

-

-

-

... More
a) All kinds of soil

14

-

421.45

... More
b) Ordinary or hard rock

6

-

786.46

... More
Dewatering mechanical bailing out water with engine and pump set including conveyance to the site and erection cost of fuel, lubricating oil and other stores, pay of staff etc. complete. (Transmission Data based on CPWD DSR 2018, Sl No. 108, KSEB )

1400

-

113.77

... More
Dewatering manual (rate for 8 hrs.) (Transmission Data based on CPWD DSR 2018, Sl No. 109, KSEB )

250

-

129.38

... More
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered). (CPWD DSR 2018- Code No. 2.16 )

-

-

-

... More
Depth not exceeding 1.5 m

99

-

151.04

... More
Depth exceeding 1.5 m but not exceeding 3 m (2.16.2)

99

-

164.09

... More
Depth exceeding 3 m but not exceeding 4.5 m (2.16.3)

211

-

193.62

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : (CPWD DSR 2018- Code No. 4.3)

80

-

331.13

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.(CPWD DSR 2018- Code No. 5.22.6)

1300

-

97.08

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (CPWD DSR 2018 code No. 4.1.3 )

1

-

7765.26

... More
Cement concrete 1:2¼:3¾ mixture using 20mm metal for encasing stubs and first members of super structure of 220kV tower (in water logged locations according to requirementas directed by the board officers at site), in accordance with the specification (including mixing, laying, watering, curing, cost and conveyance of all materials) and all labour charges etc.complete. (Transmission Data based on CPWD DSR 2018- Sl No. 15)

3

-

9067.23

... More
Stub setting of 110 kV DC towers - Surveying for marking and pegging of tower locations at site as per the approved tower schedule, stub setting in correct alignment using template of all types of 220 kV DC towers in concrete foundation/ rock foundation excluding excavation, concreting and back filling but including grouting, anchoring, etc. in the case of rock foundation and removing the stub setting template after the expiry of the predetermined time, etc. complete. (- Sl No. 16 of revised Transmission Data)

2

-

1305.11

... More
Pipe Earthing: Excavation of earth pit of size 0.3 x 0.3 x 3.6 m including over excavation on account of sloping the banks and necessary hire for planks for filling of charcoal, earthing of tower by means of a 50 mm dia, 3 m long pipe and a double run 7/9 S.W.G galvanised steel wire or G.1 tape including cost of charcoal but excluding cost of pipes, steel wire or copper tape with connecting lugs, nuts, etc. which will be supplied at departmental stores (to be specified) (Transmission Data based on CPWD DSR 2018- Sl No. 19)

4

-

8700.18

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (CPWD DSR 2018- code No. 2.25 )

350

-

255.35

... More
Supplying and filling with contractors own earth cut and conveyed from the source of availabillity including lorry conveyance and filling by layers as per lines and levels as directed by the departmental officers at site etc. complete. (CPWD Approved Observed Data - DSR 2018 Code 50.2.25.1).

80

-

519.26

... More
Drilling of holes (Labour for drilling 16 holes) (Transmission Data based on CPWD DSR 2018- Sl No.45)

40

-

166.97

... More
Filing of holes (Enlarging)(Transmission Data based on CPWD DSR 2018- Sl No.46)

40

-

90.74

... More
Cutting of steel angles (Transmission Data based on CPWD DSR 2018- Sl No. 47)

40

-

333.93

... More
Erection of tower superstructure above ground level including erection of normal and special hill side extension members wherever necessary, providing tower accessories like phase, danger and number plates, bird guards, anticlimbing devices etc. complete. (Transmission Data based on CPWD DSR 2018- Sl No. 18)

14

-

19507.82

... More
Paving out, stringing and tensioning as per standard of Six line 'ACSR DOG' conductors including attaching insulator strings with arcing horns or rings on to the tower cross arms, clamping the conductor to the insulator strings using suspension clamps with armour rods and tension clamps, jumpering the conductors at tension points, jointing the conductors and pilot wire where ever necessary, installation of vibration dampers, hire charges of tractor and stringing tools, all hire and labour for protective trestle work, providing suitable back stays at the time of stringing, etc. complete. (Transmission Data based on CPWD DSR 2018- Sl No. 25)

0.3

-

181141.14

... More
Paving out, stringing and tensioning as per standard of one 7/10 or 7/3.15 mm stranded steel earth wire including fixing the conductors on to the tower top using tension clamps and suspension clamps, jumpering the conductors at tension points, jointing the conductor wherever necessary, erection of earth bonds, hire charges of tractor and stringing tools, all hire and labour for protective trestles and providing suitable back stays at the time of stringing, etc. complete. (Transmission Data based on CPWD DSR 2018- Sl No. 30)

0.3

-

62827.8

... More
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :(CPWD DSR 2018-code No 7.1)

150

-

7114.98

... More
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) :(CPWD DSR 2018- Code No. 13.33.1)

128

-

331.8

... More
Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom of pile cap). 300 mm dia piles. DSR : 20.2.1.

240

-

2099.49

... More
Driving down teak wood pile 150mm to 200 mm dia to approved line and levels through various strata excluding cost of piles, which will be supplied at departmental stores ( to be specified) excluding conveyance charge of teak wood piles but including all hire and labour for fixin g, staging platform and all other appliances necessarty for pile driving after pointing the bottom and upto 8m depth belwo ground level, etc complete.

100

-

877.4

... More
Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge. Single pile upto 50 tonne capacity Initial test CPWD DSR 2018-code No 20.6.1.1

2

-

62209.94

... More
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). (CPWD DSR 2018-code No5.37)

25

-

9762.78

... More
Add for using extra cement in the items of design mix over and above the specified cement content therein( CPWD DSR 2018: 5.35)

5

-

782.65

... More
1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: (CPWD DSR 2018-code No.4.1.8 )

5

-

6729.95

... More
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15º landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size)( CPWD DSR 2018-code No 5.3)

10

-

11349.63

... More
Construction of earthern ringbunds for bailing outwater for excavation for foundation and stubsetting,includingshoring,ifnecessary,with plaited coconut cadjan and bamboos,etc.as per dimensions noted below. Transmission Data based on KSEB33(c)

60

-

2337.35

... More
Integrity testing of pile using Low Strain / Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge. Note:- The inclusion of the above item in the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project. (CPWD DSR 2018-code No. 20.9)

1

-

1091.42

... More
Fabrication of structures for erecting equipments.The GI & MS angles will be supplied departmentaly

25

-

3590.44

... More
Dismantling of tower superstructure above ground level including dismantling of normal and special hill side extension members tower accessories like phase, danger and number plates, bird guards, anticlimbing devices etc. complete. (Transmission Data based on CPWD DSR 2018- Sl No. 18)

14

-

9753.91

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

18.9

-

8481.43



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.