Kerala State Electricity Board Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Civil Works Others
Eprocure
Opening Date30 Apr 2019
Closing Date10 May 2019
Tender Amount₹ 38,57,776 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Transport of materials issued departmentally for the works form departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges etc Line and Earth conductors

7

5964

852.14

... More
Transport of materials issued departmentally for the works form departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges etc Insulators and accessories, Power conductor accessories, Earth conductor accessories etc.

6.2

5283

852.14

... More
Transport of materials issued departmentally for the works form departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges etc Towers, extensions and other structures and all other materials including earthing materials etc.

82

69875

852.14

... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50. For All kinds of soil.

738

127578

172.87

... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed All kinds of soil. Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.Up to 3m

253

61704

243.89

... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift from 3m to 4.5m, disposed earth to be levelled and neatly dressed All kinds of soil.

34

10707

314.92

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in- charge for Ordinary rock

82

24877

303.39

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in- charge for Ordinary rock Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.Up to 3m

252

108551

430.76

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in- charg for Ordinary rock Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.Up to 3m to 4.5m

111

61952

558.13

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in- charge.Hard rock (requiring blasting)

80

43184

539.8

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in- charge.Hard rock (requiring blasting) Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.Up to 3m

50

33358

667.17

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in- charge.Hard rock (requiring blasting) Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.Up to 3m to 4.5m

100

79454

794.54

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in- charge .Hard rock (blasting prohibited)

20

17013

850.68

... More
Bailing out water with engine and pump set including conveyance to site and erection cost of fuel, lubricating oil and other stores, pay of staff etc.complete

100

8806

88.06

... More
Open timbering in case of shafts, wells, cesspits, manholes and the like including strutting and shoring complete (Measurements to be taken of the face area timbered):Depth not exceeding 1.5 m Depth exceeding 3 m but not exceeding 4.5 m

500

43815

87.63

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights :Foundations, footings, bases of columns, etc. for mass concrete

165

43923

266.2

... More
Construction of earthern ring bunds for bailing out water for excavation for foundation and stub setting, including shoring, if necessary, with plaited coconut cadjan and bamboos, etc. as per dimensions noted below.Bunds up to 0.5m height 1m bottom and 0.5m top width

300

70749

235.83

... More
Stub setting- of 110 kV Multy towers Surveying for marking and pegging of tower locations at site as per the approved tower schedule, stub setting in correct alignment using template of all types of 110 kV Multy towers in concrete foundation/ rock foundation excluding excavation, concreting and back filling but including grouting, anchoring, etc. in the case of rock foundation and removing the stub setting template after the expiry of the predetermined time, etc. complete.

5

41388

8277.78

... More
Stub setting- Surveying for marking and pegging of tower locations at site as per the approved tower schedule, stub setting in correct alignment using template of all types of 110 kV DC towers in concrete foundation/ rock foundation excluding excavation, concreting and back filling but including grouting, anchoring, etc. in the case of rock foundation and removing the stub setting template after the expiry of the predetermined time, etc. complete.

1

6640

6640.21

... More
Drilling holes for providing anchor / dowel bars varying in depth and diameter in rock or conctrete and cleaning the holes, grouting with cement grout after fixing dowel bars including cost of all materials, labours etc. complete as per specification and drawings.

70

16457

235.11

... More
Providing anchor bars of varying depth using Tor steel, bend, jumped, etc. including cost and conveyance of all materials, labours etc. complete as per specification and drawings as directed by departmental officers.

300

21375

71.25

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stoneaggregate 40 mm nominal size).

22

145375

6607.97

... More
Cement concrete 1 : 2 : 4 mixture with 40 mm metal for tower footing in accordance with the specification including the cost of cement to be supplied by the contractor at site, conveyance charges of cement to site of work, all hire and labour for form work, watering, curing, etc, complete

16

118374

7398.39

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).

72

570453

7922.96

... More
Cement concrete 1:21/4:33/4 ( 1:2.25:3.75 )mixture with 20 mm metal for tower footing in accordance with the specification including the cost of cement to be supplied by the contractor at site, conveyance charges of cement to site of work, all hire and labour for form work, watering, curing, etc, complete.

15

156869

10457.97

... More
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.

4400

341792

77.68

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.

1350

232996

172.59

... More
Erection of tower super structure above ground level including erection of normal and special hill side extension members where ever necessary, providing tower accessories like phase, danger and number plates, bird guards, anti climbing devices, etc. complete

78

654355

8389.17

... More
Pipe earthing - Excavation of earth pit of size 0.3 x 0.3 x 3.6 m including over excavation on account of sloping the banks and necessary hire for planks for filling of charcoal, earthing of tower by means of a 50 mm dia, 3 m long pipe and a double run 7/9 S.W.G galvanised steel wire or G.1 tape including cost of charcoal but excluding cost of pipes, steel wire or copper tape with connecting lugs, nuts, etc. which will be supplied at departmental stores (to be specified)

12

52362

4363.55

... More
Paving out, stringing and tensioning as per standard of Twelve line ACSR Wolf' conductors including attaching insulator strings with arcing horns or rings on to the tower cross arms, clamping the conductor to the insulator strings using suspension clamps with armour rods and tension clamps, jumpering the conductors at tension points, jointing the conductors and pilot wire where ever necessary, installation of vibration dampers, hire charges of tractor and stringing tools, all hire and labour for protective trestle work, providing suitable back stays at the time of stringing, etc. complete. ( for Multi circuit)

1.5

245296

163530.78

... More
Paving out, stringing and tensioning as per standard of one 7/10 or 7/3.15 mm stranded steel earth wire including fixing the conductors on to the tower top using tension clamps and suspension clamps, jumpering the conductors at tension points, jointing the conductor wherever necessary, erection of earth bonds, hire charges of tractor and stringing tools, all hire and labour for protective trestles and providing suitable back stays at the time of stringing, etc. complete.

1.5

17364

11576.19

... More
Rewinding of "WOLF ACSR' fromdilapidated conductor drums unsuitable for transporting/paving out on to serviceable conductor drums issued departmentally including all hire charges for tools & plants necessary for rewinding

0.75

3988

5317.99

... More
Rewinding of 7/3.15 or 7/10mm stranded steel earth wire from dilapated conductor drums (unserviceable for transporting) to serviceable conductor drums issued departmentally including all hire charges for tools and plants and other appliances necessary for rewinding.

0.75

3228

4304.39

... More
Drilling of holes

20

1685

84.25

... More
Filing of holes

20

882

44.1

... More
Cutting of steel angles

32

5391

168.49

... More
Providing GI barbed wire protection to towers with 2 strand barbed wire weighing 9.38 kg per 100 m (minimum) fixed with GI staples to posts around erected towers including cost and conveyance of all materials, labor charges etc. complete as directed.

1100

10758

9.78

... More
Dismantling (with out damage) one Km 11 KV / 33kV line( 3 Conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials.

3

27594

9198

... More
Dismantling (with out damage) one km LT S Ph 2 wire OH line conductor by dismantling cross arms insulators and stacking the conductors in rolls properly.

1.5

7428

4952

... More
Dismantling (with out damage) one km LT 3 Ph 4 wire OH line conductor by dismantling cross arms insulators and stacking the conductors in rolls properly.

0.5

4700

9401

... More
Stringing of one km 11 kV line with ACSR Rabbit (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works.

1

19475

19475

... More
Stringing of one km. 11 KV line with ACSR Raccoon ( 3 conductors ) after fitting insulators and giving jumpers connections including cutting removing tree branches wherever necessary excluding cut point works.

2

46256

23128

... More
Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc using ACSR Rabbit for Phase and ACSR Weasel for Neutral, for one km LT 3 ph 4 wire line including cutting removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.

0.5

10625

21250

... More
Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc using ACSR Rabbit for Phase and Neutral, for one km LT Single ph 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.

1.5

16915

11277

... More
Transferring LT Single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators , refitting the same on the new pole, binding etc. complete.

20

11700

585

... More
Transferring LT Three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators , refitting the same on the new pole, binding etc. complete.

20

23660

1183

... More
Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead.

55

1136

20.66

... More
Dismantling and winding as per standard of Six line ACSR wolf conductor after removing the attached insulator strings with arcing horns or rings on to the tower cross arm, unclamping the conductor to the insulator strings using suspension clamps with armour rods and tension clamps, removing jumper from the conductor wherever necessary, removing the vibration dampers, hire charges or tractor and stringing tools, all hire and labour for protective trestle, back stays at the time of stringing etc., complete.

1.5

66311

44207.95

... More
Dismantling and winding as per standard as per standard of one 7/9 standard steel earth wire including removing the conductors on to the tower top ,tension clamps and suspension clamps and jumper conductor earth bonds, hire charges of tractor and stringing tools, all hire and labour charges for protective trestles and providing suitable back stays at the time of stringing etc., complete.

1.5

8682

5788.09

... More
Dismantling of tower super structure above ground level including Dismantling of normal and special hill side extension members wherever necessary, removing tower accessories like phase, danger and number plates, bird guard, anticlimbing device etc., complete.

29

121643

4194.59

... More
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

3

4105

1368.45

... More
Arranging scaffoldings on either sides of the Main road as per the directions of dept. officers excluding hire charges of materials.

1

3795

3795.84



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.