Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 42,400Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Construction Of New 11 Kv Feeder To Mulayankavu Under Electrical Section Koppam
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KSEB_717760_1Tender No
TENDER/2024-25/6156/89 dated 12.12.2024Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://http://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite.
10
1737
17375.5
... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite.
20
868
17375.4
... More
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
75
1778
133374
... More
Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
32
879
28135.36
... More
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
57
1923
109647.48
... More
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
10
1008
10088.6
... More
Dismantling one LT 2 line cross arm from existing pole.
20
70
1401
... More
Dismantling one LT 4 line cross arm from existing pole.
15
104
1568.25
... More
Dismantling one section fuse
4
192
769.44
... More
Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling
15
469
7041.15
... More
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.
110
96
10579.8
... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.
20
149
2990
... More
Dismantling one damaged 11kV A type pole after disconnecting stays, strut etc. and stacking the same.
1
2229
2229.95
... More
Dismantling one damaged 11kV TW/RSJ/Rail pole after disconnecting stays, strut etc. and stacking the same.
5
1097
5488.65
... More
Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.
0.1
7443
744.36
... More
Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls.
2.1
14129
29671.57
... More
Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole.
218
341
74525.48
... More
Reshackling one span LT 3ph 4 wire OH line, replacing insulators, tightening stay, cutting tree branches incl. conveyance.
32
493
15790.4
... More
Reshackling one span LT Sph 2 wire OH line, replacing insulators, tightening stay, cutting tree branches incl. conveyance.
16
262
4198.56
... More
Dismantling one damaged HT PSC/RCC Strut pole incl. removal of clamps and stacking.
1
1528
1528.45
... More
Renewing one LT Jumper connection using Copper/ACSR conductor as per standard specification.
110
101
11155.1
... More
Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles
230
40
9319.6
... More
Installation of Insulation piercing connector for main to service line main
:16-95 sqmm, Tap : 4-35 sqmm
20
57
1155.8
... More
Installation of Insulation piercing connector for main to service line main
:25-95 sqmm, Tap : 25-95 sqmm
5
57
288.95
... More
Installation of Insulation piercing connector for main to service line main
:16-95 sqmm, Tap 16-95 sqmm
6
57
346.74
... More
Dismantling of suspension clamp suitable for LT AB cable
6
77
462.3
... More
Dismantling of Anchor clamp / dead end clamp for LT AB cable
8
77
616.4
... More
Re-joining snapped one LT conductor after removing damaged portion incl. Reshackling and conveyance of all materials complete.
11
702
7728.05
... More
Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size
20
48
963.2
... More
Fitting one set AB switch and giving connection
2
2795
5591.1
... More
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.
12
564
6774.6
... More
Drilling hole of various sizes on existing Channel/Cross Arm.
18
16
301.14
... More
Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
49
3274
160443.64
... More
Additional rate for providing one disc set on any type of HT pole for making cut point.
189
158
30033.99
... More
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
68
762
51825.52
... More
Additional rate for excavation of Pit for A type pole in Hard Laterite.
28
1303
36503.04
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.
104
868
90352.08
... More
Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles).
6
1737
10425.3
... More
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.
31
481
14940.45
... More
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.
4
481
1927.8
... More
Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
26
4143
107721.64
... More
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).
30
4028
120848.7
... More
Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
2
10473
20946.72
... More
Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).
14
906
12689.74
... More
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.
4
4805
19223.8
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.
56
434
24354.96
... More
Additional rate for excavation of Pit for A type pole in Laterite.
2
651
1302.64
... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.
88
1373
120888.24
... More
Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon
2300
43
100027
... More
Doing straight joint on cables of sizes upto and incl. 3x185 sqmm using the cable jointing kit supplied departmentally as per specification.
6
3142
18855.84
... More
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.
15
3056
45853.65
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%