Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 15,300Document Cost
₹ 1,534Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_KSEB_614451_1Bid Award Id
ViewTender No
PMU/KKD/e-Tender/03/2023-24 Dtd 18-10-2023Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://http://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Erection of LT 2 way distribution box on
existing cross arm giving connection
incl. cable and earth connection
(excluding earthing).
1
2499
2499
... More
Transporting poles by hired vehicle to a
distance upto 5km and carrying upto 4
poles excluding loading & unloading.
1
1428
1428.57
... More
Fitting and erecting one HT DP using
PSC pole in position incl. fitting 2
channel cross arms, digging & back
filling pit, drawing earth leads.
1
5810
5810
... More
Fitting 5 channel cross arms, AB switch,
DO fuse, LA, HT & LT connections on
existing DP, 3 LT fuses.
1
7254
7254
... More
Fitting one Additional V cross arm in
existing single pole incl. conveyance of
Materials.
2
640
320
... More
Drilling hole of various sizes on existing
Channel/Cross Arm.
27
297
11
... More
Loading HT PSC pole from the stacking
place and unloading the same at work
site (transport by vehicle)
2
1014
507
... More
Additional rate for excavation of one Pit
for HT Pole/HT Stay in Laterite.
2
578
289
... More
Providing one Earth using earth pipe
incl. digging separate pit at standard distance away from the pole/structure &
Backfilling.
5
7540
1508
... More
Providing Transformer fencing , using
50x50x6mm Angle iron, 40 x 6 mm MS
flat and 8 mm MS rod as specified, incl
cost of transportation & foundation
22
33858
1539
... More
Providing yard metalling with 6mm &
40mm thick blue metal as specified after
constructing a curb wall.
8
5720
715
... More
Laying of 11 KV, XLPE UG cable by
HDD Method under normal soil
Conditions
330
495000
1500
... More
Doing one cable end termination on
cables of sizes beyond 3x185 sqmm and
upto and incl. 3x300 sq mm using the
cable jointing kit supplied
Departmentally.
2
2562
1281
... More
Mounting the cable ends of all sizes upto
and incl. 3x300 sq mm with special type
cable clamps incl. cost of extra materials
if needed and giving necessary
Connections.
2
1556
778
... More
Doing straight joint on cables of sizes
beyond 3x185 sqmm and upto and incl.
3x300 sq mm using the cable jointing kit
supplied departmentally as per
Specification.
1
2148
2148
... More
Providing and laying in position
specified grade of Reinforced Cement
concrete ,excluding the cost of
centering,shuttering,finishing and
reinforcement-All work upto plinth
level. 1:1.5:3(1cement:1.5coarse
sand:3graded stone aggregate 20mm
nominal size)
1
9142
9142.08
... More
Providing and laying in position
specified grade of Cement concrete
,excluding the cost of
centering,shuttering.All work upto plinth
level. 1:3:6(1cement:3 coarse
sand:6graded stone aggregate 40mm
1
7256
7256.35
... More
Excavation of cable trench in all classes
of soil and backfilling after laying of
cable (excluding laying of cable).
30
5910
197
... More
Additional rate for excavation of cable
trench in exceptionally hard conditions (
like in *ordinary rock).
15
1680
112
... More
Additional rate for excavating trench on
tarred/concrete surface of specified size.
15
2715
181
... More
Transporting HT UG Cable by hired
vehicle to a distance up to 5 km and
carrying 1 drum including loading and unloading using crane
1
4781
4781.7
... More
Transporting poles by hired vehicle to a
distance beyond 5km and carrying upto
4 poles. (Running km).
10
430
43
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements