Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date30 Nov 2024
Closing Date9 Dec 2024
Tender Amount₹ 13,71,596 
Notes
Download

Costs

Summary

Ht Post Shifting For Road Widening Part 4 At Muringoor To Ezhatumugham

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
506-Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. and stacking the same.

4

3130

12520.36

... More
504-Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

58

3129

181484.9

... More
509-Dismantling one damaged HT TW/RSJ/Rail Strut pole incl. removal of clamps and stacking.

1

830

830.09

... More
124-Insertion of one HT PSC pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc.

38

3433

130464.26

... More
112-Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

8

3274

26194.88

... More
113-Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

6

4143

24858.84

... More
121-Fitting and providing one Strut using A type pole incl. digging & back filling pit.

1

3925

3925.68

... More
116-Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.

1

8735

8735.82

... More
117-Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.

2

10473

20946.72

... More
122-Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.

5

4805

24029.75

... More
512-Dismantling (without damage) one HT PSC/RCC Strut pole incl. removal of clamps and stacking.

1

2866

2866.64

... More
120-Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.

5

3056

15284.55

... More
514-Dismantling (without damage) one HT stay incl. back filling, and bringing back to section store.

30

904

27129.6

... More
119-Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.

46

1373

63191.58

... More
163-Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.

56

1086

60828.88

... More
325-Additional rate for reinstalling LT line on the renewed 11kV pole having both HT and LT (HT/LT) lines.

42

745

31307.22

... More
392-Renewal of existing damaged/old 11kV Fly stay with new Fly stay (excluding stay-pole & stay-rod) including conveyance.

4

1129

4516.36

... More
513-Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.

0.58

13827

7950.63

... More
135-Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.

0.59

34792

20353.75

... More
516-Dismantling one Channel cross arm from existing DP structure, and bringing back to section store.

18

282

5080.86

... More
515-Dismantling one V cross arm/Channel cross arm from existing Pole, and bringing back to section store.

5

192

961.8

... More
170-Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.

26

481

12530.7

... More
171-Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.

5

564

2822.75

... More
517-Dismantling (without damage) one AB switch from existing structure and bringing back to section store.

1

1676

1676.91

... More
167-Fitting one set AB switch and giving connection

1

2795

2795.55

... More
157-Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.

7

2266

15865.85

... More
160-Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite.

5

868

4343.85

... More
161-Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite.

2

1737

3475.1

... More
169-Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.

5

481

2409.75

... More
554-Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

14

1923

26930.96

... More
204-Erecting one LT PSC Pole in position incl. digging & back filling pit.

2

2017

4035.46

... More
266-Providing WP support with PSC pole incl. digging & back filling pit.

15

1943

29152.5

... More
205-Providing Stay for LT poles incl. digging & back filling pit.

8

938

7510.56

... More
559-Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking.

5

1589

7945.45

... More
206-Providing Strut using LT PSC pole incl. digging & back filling pit.

5

1887

9435.25

... More
568-Dismantling one section fuse

15

192

2885.4

... More
221-Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.

15

240

3606.75

... More
451-Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.

75

96

7213.5

... More
452-Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.

15

149

2242.5

... More
453-Redoing Sph WP S/C complete incl. changing WP, E/Meter, cut-out, neutral link etc, and conveyance of material.

5

868

4343.85

... More
454-Redoing 3ph WP S/C complete incl. changing WP, E/Meter, cut-out, neutral link etc, and conveyance of material.

2

1094

2189.18

... More
555-Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling

7

469

3285.87

... More
566-Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls.

0.72

14129

10144.85

... More
565-Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.

0.33

7443

2441.51

... More
567-Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls.

0.57

3351

1910.49

... More
212-Stringing one km LT Sph 2 wire line (Rabbit) incl. fitting cross arm etc. removing touchings and conveyance of materials.

0.28

16967

4683.09

... More
213-Stringing one km LT Sph 3 wire line (Rabbit for Ph&N, Weasel for St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials.

0.06

23764

1307.03

... More
214-Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials.

0.14

31957

4346.21

... More
215-Stringing one km LT 3ph 5 wire line (Rabbit for Ph and Weasel for N&St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials.

0.59

38753

22864.83

... More
520-Dismantling transformer station in DP structure excluding the rate of dismantling earthing

1

14935

14935.36

... More
145-Erecting one 160kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation.

1

7393

7393.45

... More
518-Dismantling one HT pin insulator with pin and bring back to section store.

3

192

577.08

... More
713-Dismantling one Transformer (upto and incl. 160kVA) from existing structure to ground.

1

2429

2429.64

... More
138-Fitting 6 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses.

1

11469

11469.68

... More
405-Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole.

200

341

68372

... More
625-Dismantling one 1x40W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole and reconnecting.

22

611

13454.98

... More
610-Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.

10

492

4924.1

... More
561-Dismantling one LT 4 line cross arm from existing pole.

2

104

209.1

... More
952-Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).

22

4028

88622.38

... More
953-Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation

23

1589

36563.56

... More
954-Providing yard metalling with 6mm & 40mm thick blue metal as specified after constructing a curb wall.

10

769

7691.8

... More
131-Additional rate for excavation of Pit for A type pole in Laterite.

10

651

6513.2

... More
132-Additional rate for excavation of Pit for A type pole in Hard Laterite.

8

1303

10429.44

... More
133-Additional rate for excavation of Pit for A type pole in Soft Rock.

4

1955

7820

... More
127-Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.

64

434

27834.24

... More
128-Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.

40

868

34750.8

... More
129-Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock.

5

1303

6518.4

... More
208-Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite.

25

217

5436.25

... More
209-Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite.

15

434

6523.65

... More
363-Drilling hole of various sizes on existing Channel/Cross Arm.

80

16

1338.4

... More
702-Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

13

762

9907.82

... More
706-Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

15

478

7182.3

... More
703-Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).

18

906

16315.38

... More
726-Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.

12

3142

37707.12



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.