Kerala State Electricity Board Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date8 Oct 2020
Closing Date22 Oct 2020
Tender Amount₹ 8,29,965 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 poles. (Running km).26 trips-9km

234

-

43

... More
Renewal of existing damaged/old 11kV PSC/RCC Pole with new 'A' type pole in place and refitting of all items incl. conveyance (except pole).

1

-

4145

... More
Additional rate for reinstalling LT line on the renewed 11kV pole having both HT and LT (HT/LT) lines.

4

-

496

... More
Renewal of existing damaged/broken old 11kV Stay to the existing stay rod.

1

-

376

... More
Drilling hole of various sizes on existing Channel/Cross Arm.

58

-

11

... More
Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

77

-

2178

... More
Fitting and erecting one HT 'A' type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

2

-

2756

... More
Additional rate for providing one disc set on any type of HT pole for making cut point.

60

-

105

... More
Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.

3

-

5810

... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.

68

-

914

... More
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.

8

-

2033

... More
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.

8

-

3197

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.

52

-

289

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.

48

-

578

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock.

20

-

867

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Rock.

18

-

1735

... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.

3.1

-

23128

... More
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.

7

-

1508

... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite.

6

-

1157

... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock.

1

-

1735

... More
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.

74

-

723

... More
Fitting one set AB switch and giving connection

3

-

1859

... More
Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles) .3.1X14

43.4

-

1157

... More
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.

2

-

320

... More
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.

14

-

320

... More
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.

9

-

376

... More
Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials.

19

-

361

... More
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

67

-

1280

... More
Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling

50

-

312

... More
Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking.

2

-

1057

... More
Dismantling one section fuse

3

-

128

... More
Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole.

117

-

227

... More
Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.

17

-

585

... More
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.

80

-

1183

... More
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.

25

-

64

... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.

1

-

99

... More
Redoing Sph WP S/C complete incl. changing WP, E/Meter, cut-out, neutral link etc, and conveyance of material.

1

-

578

... More
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.

3

-

160

... More
Providing WP support with PSC pole incl. digging & back filling pit.

2

-

1293

... More
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).

5

-

3802



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.