Kerala State Electricity Board Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Civil And Construction
Electrical and Electronics
Pipe Line Project
Electrical Works
Eprocure
Opening Date6 Dec 2024
Closing Date23 Dec 2024
Tender Amount₹ 5,42,089 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses.

1

10905

10905.14

... More
Drilling hole of various sizes on existing Channel/Cross Arm.

52

16

869.96

... More
Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).

4

906

3625.64

... More
Providing one Earth using earth pipe incl. digging & backfilling pit and supply of charcoal, salt, sand etc.

5

4245

21227.95

... More
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).

4

4028

16113.16

... More
Erecting one LT PSC Pole in position incl. digging & back filling pit.

2

2017

4035.46

... More
Additional rate for excavation of one Pit for LT Pole/LT Stay in Soft Rock.

2

651

1302.64

... More
Providing Stay for LT poles incl. digging & back filling pit.

2

938

1877.64

... More
Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials.

0.1

31957

3195.75

... More
Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls.

0.1

14129

1412.93

... More
Additional rate for excavation of Pit for A type pole in Soft Rock.

4

1955

7820

... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite.

5

1737

8687.75

... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.

24

1373

32969.52

... More
Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line.

3

351

1053.81

... More
Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation

24

1589

38153.28

... More
Providing yard metalling with 6mm & 40mm thick blue metal as specified after constructing a curb wall.

15

769

11537.7

... More
Installing one DTR Meter with box on existing poles and giving the complete connections incl. conveyance of materials.

1

3758

3758.41

... More
Fitting one set AB switch and giving connection

1

2795

2795.55

... More
Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.

1

8735

8735.82

... More
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

24

762

18291.36

... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.

8

3142

25138.08

... More
Erection of Anchor clamp / dead end clamp for 11kV ABC of any size

16

164

2634.72

... More
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.

1

4805

4805.95

... More
Fiting One no MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable

15

193

2895

... More
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

2

1008

2017.72

... More
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

13

1923

25007.32

... More
Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking.

1

1589

1589.09

... More
Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

2

478

957.64

... More
Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.

6

879

5275.38

... More
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.

25

1778

44458

... More
Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials.

6

542

3255.54

... More
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.

3

3056

9170.73

... More
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.

2

481

963.9

... More
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.

4

481

1927.8

... More
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.

2

564

1129.1

... More
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.

20

1086

21724.6

... More
Additional rate for excavation of one Pit for Coil Earthing in Hard Laterite.

20

868

17375.4

... More
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.

2

2266

4533.1

... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock.

2

2606

5212.64

... More
Erection of suspension clamp for 11KV ABC of any size

20

164

3293.4

... More
Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm

18

370

6660

... More
Fitting and Erecting one HT PSC Single pole in position, including digging and back filling pit in ordinary soil (as per standards) excluding fitting cross arm and F clamp

18

2642

47572.38

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.

18

868

15637.86

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock.

20

1303

26073.6

... More
Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles

550

45

25091

... More
Fitting and Erecting one HT A Pole in position, including digging and back filling pit in ordinary soil (as per standards) excluding fitting cross arm and F clamp

1

3511

3511.69

... More
Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

1

4143

4143.14

... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.

0.22

34792

7654.4

... More
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.

0.2

13827

2765.44

... More
Additional rate for providing one disc set on any type of HT pole for making cut point.

3

158

476.73



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.