Kerala State Electricity Board Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Machinery and Tools
Eprocure
Opening Date28 Feb 2024
Closing Date16 Mar 2024
Tender Amount₹ 11,41,251 
Notes
Download

Costs

Summary

Kas- Repairs To Control Shaft Gate Hoisting Structure And Maintenance Works Of Gate Including Painting

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
:Replacing Rubber seals including cutting and removing all existing rubber seals from the gate, supplying and fixing new Teflon cladded rubber seal of approved make and good quality after getting the approval of departmental officers having the same dimensions as that of the existing one including making holes in the seals at par with steel stem replacing all nuts and bolts with SS nuts (12mm diameter and 100mm length - paid separately) and CSK bolts and greasing the moving parts, replacing of worn out parts including cost of rubber seal, epoxy coal tar painting of replaced parts, etc complete as directed by the departmental officers at site. (For 1 gate)

2

111148

55574.25

... More
Suplying and fixing SS CSK bolts and nuts, washer for fixing rubber seal (12mm diameter and 100mm length)

110

15400

140

... More
Finishing with Epoxy paint (two coats) of approved make at all locations prepared and applied as per manufacturer's specifications and including appropriate priming coat with zinc rich primer of approved make, preparation of surface, etc. complete. 13.52.1 On steel work

900

256995

285.55

... More
Providing & fixing Poly carbonate multi wall plain sheet 6 mm thick as approved by the Engineer in charge and should be supplied in a single length of 12 M or as decided by the Engineer in charge. The sheets shall be fixed using self drilling/ self tapping screw of size ( 5.5x55mm) with EPDM seal complete upto any pitch in horizontal /vertical / curved surface, but excluding the cost of purlins, rafters, trusses, and including cutting to size and shapes where ever required.

30

28882

962.75

... More
Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade including priming coat etc complete as per the direction of departmental of officers.

50

10605

212.1

... More
Painting the control shaft gate after surface preparation through copper slag blasting process as per IS 1477 Part I -1971 the average surface roughness after copper blast should not exceed 40 microns) the copper blast surface should be cleaned from loose dust and debris through air blast with the help of blower, to the class B specififation ie., at least 95% of surface of steel should be cleared to base metal except some tightly bonded residue in the form of mill scale/rust only. Then apply two coats of zinc rich primer (containing not less than 85% of zinc on dry film) to give a total dry film thickness of 70+5 microns within a time gap of 6 hours, after surface preparation. Then apply two coats of solvent less coal tar epoxy paint at an interval of 24 hours (150 microns each) including the cost of epoxy paint, primer, copper slag, compressed air, labour et., complete as per the guide lines of IS 14177-1994 (reaffirmed 2019) and as per the directions of departmental officers

25

20450

818



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.