Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 15,100Document Cost
₹ 1,534Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KSEB_710375_1Bid Award Id
ViewTender No
TENDER/2024-25/6156/64 DT.23.11.2024Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://http://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Additional rate for excavation of Pit for A type pole in Hard Laterite.
13
1303
16947.84
... More
Additional rate for excavation of Pit for A type pole in Soft Rock.
3
1955
5865
... More
Additional rate for excavation of Pit for A type pole in Rock.
1
3910
3910
... More
Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
9
4143
37288.26
... More
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).
19
4028
76537.51
... More
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
9
3129
28161.45
... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.
1.7
34792
59147.64
... More
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.
1.7
13827
23506.21
... More
Additional rate for providing one disc set on any type of HT pole for making cut point.
9
481
4337.55
... More
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.
12
564
6774.6
... More
Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).
2
762
1524.28
... More
Additional rate for excavation of Pit for A type pole in Hard Laterite.
11
868
9556.47
... More
Additional rate for excavation of Pit for A type pole in Soft Rock.
50
16
836.5
... More
Additional rate for excavation of Pit for A type pole in Rock.
3
2795
8386.65
... More
Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
1
1676
1676.91
... More
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).
3
10473
31420.08
... More
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
1
4089
4089.82
... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.
0.8
2985
2388.66
... More
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.
3
904
2712.96
... More
Additional rate for providing one disc set on any type of HT pole for making cut point.
4
282
1129.08
... More
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.
3
240
721.35
... More
Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).
6
173
1040.16
... More
Additional rate for excavation of Pit for A type pole in Hard Laterite.
1700
43
73933
... More
Additional rate for excavation of Pit for A type pole in Soft Rock.
10
1737
17375.5
... More
Additional rate for excavation of Pit for A type pole in Rock.
1
3925
3925.68
... More
Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.filling pit.
1
3056
3056.91
... More
Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
1
1796
1796.09
... More
Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. and stacking the same.
1
3130
3130.09
... More
Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
4
879
3516.92
... More
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
15
1778
26674.8
... More
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.
5
492
2462.05
... More
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.
30
96
2885.4
... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.
5
149
747.5
... More
Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles).
1.7
1737
2953.84
... More
Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole.
20
341
6837.2
... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.
12
1373
16484.76
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.
2
434
869.82
... More
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.
10
2266
22665.5
... More
Dismantling (without damage) one HT PSC/RCC Strut pole incl. removal of clamps and stacking.
2
2866
5733.28
... More
Insertion of one HT A type pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc.
1
4302
4302.05
... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.
5
3142
15711.3
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements