Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala State Electricity Board - KSEB Tender
Eprocure
Opening Date19 Nov 2021
Closing Date3 Dec 2021
Tender Amount₹ 12,50,939 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 26,400Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Shifting Of Electric Poles And Lines From Guard Station To Arayakunnu Road Under Electrical Section Peringammala
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_KSEB_454905_1Bid Award Id
ViewTender No
ET02/AEE/PLD/21-22/19.11.2021Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://http://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 poles. (Running km).
20
-
43
... More
Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
8
-
1194
... More
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
101
-
2081
... More
Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
112
-
2178
... More
Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
6
-
5810
... More
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.
1
-
3197
... More
Dismantling (without damage) one HT PSC/RCC Strut pole incl. removal of clamps and stacking.
2
-
1907
... More
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.
2
-
2033
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.
240
-
289
... More
Dismantling one damaged 11kV 'A' type pole after disconnecting stays, strut etc. and stacking the same.
4
-
1484
... More
Dismantling (without damage) one 11kV 'A' type pole after disconnecting stays, strut etc. and stacking the same.
1
-
2082
... More
Fitting and erecting one HT 'A' type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
6
-
2756
... More
Fitting and erecting one HT DP using 'A' type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
1
-
6967
... More
Additional rate for excavation of Pit for 'A' type pole in Laterite.
8
-
434
... More
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).
8
-
3802
... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.
156
-
914
... More
Renewal of existing damaged/broken old 11kV Stay to the existing stay rod.
7
-
376
... More
Re-Tensioning one span 11kV line incl. replacing insulators, tightening stay, cutting tree branches and conveyance.
126
-
483
... More
Dismantling transformer station in DP structure excluding the rate of dismantling earthing
3
-
9935
... More
Dismantling one Transformer (upto and incl. 160kVA) from existing structure to ground.
3
-
1616
... More
Fitting and erecting one HT PSC DP, fitting all accessories (2 stays, 8 cross arms, AB, DO, LA etc.), mounting of 100kVA Transformer, fixing DB, DTR box and giving all HT & LT connections.
2
-
23231
... More
Fitting 6 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses.
1
-
7630
... More
Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line.
3
-
233
... More
Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation.
1
-
4759
... More
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.
15
-
1508
... More
Providing one Earth using earth pipe incl. digging & backfilling pit and supply of charcoal, salt, sand etc.
6
-
3236
... More
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.
112
-
723
... More
Dismantling one damaged AB switch from existing structure.
5
-
785
... More
Fitting one set AB switch and giving connection
5
-
1859
... More
Dismantling one V cross arm/Channel cross arm from existing Pole, and bringing back to section store.
8
-
128
... More
Dismantling one Channel cross arm from existing DP structure, and bringing back to section store.
25
-
188
... More
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.
6
-
320
... More
Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials.
11
-
361
... More
Fitting one Additional 2.4m Channel cross arm in existing single pole incl. conveyance of materials.
9
-
384
... More
Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole
81
-
480
... More
Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.
12
-
93
... More
Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.
8
-
139
... More
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
14
-
671
... More
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
82
-
1280
... More
Erecting one LT PSC Pole in position incl. digging & back filling pit.
61
-
1342
... More
Providing WP support with PSC pole incl. digging & back filling pit.
15
-
1293
... More
Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking.
1
-
1057
... More
Providing Strut using LT PSC pole incl. digging & back filling pit.
2
-
1256
... More
Providing Stay for LT poles incl. digging & back filling pit.
49
-
625
... More
Renewal of existing damaged/broken old LT stay with existing stay rod.
9
-
289
... More
Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite.
110
-
145
... More
Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
62
-
585
... More
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
161
-
1183
... More
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.
344
-
62
... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.
17
-
99
... More
Dismantling one section fuse
8
-
128
... More
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.
8
-
160
... More
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.
76
-
327
... More
Dismantling one 2x40W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole and reconnecting.
5
-
501
... More
Dismantling SV/MV/Metal halide lamp fitting from the existing pole and refitting the same on newly erected pole and reconnecting (without using aerial lift).
2
-
1565
... More
Providing yard metalling with 6mm & 40mm thick blue metal as specified after constructing a curb wall.
26
-
715
... More
Brick work in cement mortar for superstructure as per the direction of departmental staff.
0.9
-
9117
... More
Earth work excavation in hard soil and depositing on bank with initial lead up to 50 m and lift up to 1.5 m including breaking clods , watering , ramming , and sectioning etc
0.6
-
259.19
... More
Cement plaster 1:6 (1 Cement : 6 Sand) 12 mm thick
21
-
99.62
... More
Leveling the surface by excavation not exceding 30 cm in depth but exceding 1.50 m in width disposal of excavated earthlead upto 50 cm , lift upto 1.5 lead
26
-
73.98
... More
Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint.