Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala State Electricity Board - KSEB Tender
Electrical and Electronics
Eprocure
Opening Date12 Jul 2024
Closing Date19 Jul 2024
Tender Amount₹ 9,13,445
Costs
EMD
₹ 22,900Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KSEB_680372_1Bid Award Id
ViewTender No
Re-tender/01/24-25/12.07.2024Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling one V cross arm/Channel cross arm from
existing Pole, and bringing back to section store.
11
2115
192.36
... More
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.
120
11541
96.18
... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.
24
3588
149.5
... More
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.
10
4924
492.41
... More
Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint
59
4071
69
... More
Traffic signal painting of pole 1.5m height using black and white paints in alternate rings of 25cm width incl. cost of paint as specified.
59
20848
353.36
... More
Fitting Knee bracing or suitable support on existing HT or LT post.
2
329
164.67
... More
Providing additional jumper from AB to line
3
462
154.1
... More
Providing yard metalling with 6mm & 40mm thick blue metal as specified after constructing a curb wall.
12
9230
769.18
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.
16
6958
434.91
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.
17
14769
868.77
... More
Additional rate for excavation of Pit for A type pole in
Laterite.
19
12375
651.32
... More
Additional rate for excavation of Pit for A type pole in Hard Laterite
20
26073
1303.68
... More
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.
6
13599
2266.55
... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite.
4
3475
868.77
... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite.
2
3475
1737.55
... More
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.
50
54311
1086.23
... More
Additional rate for excavation of one Pit for Coil Earthing in Laterite
1
434
434.91
... More
Additional rate for excavation of one Pit for Coil Earthing in Hard Laterite.
1
868
868.77
... More
Insertion of one HT PSC pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc.
1
3433
3433.27
... More
Fitting and erecting one HT A type Pole in position incl.
fitting cross arm, digging & back filling pit, drawing earth leads.
1
4143
4143.14
... More
Loading HT A type pole from the stacking place and
unloading the same at work site (transport by vehicle).
39
35349
906.41
... More
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
18
13718
762.14
... More
Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
2
957
478.82
... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading
15
47133
3142.26
... More
Drilling hole of various sizes on existing Channel/Cross
Arm.
25
418
16.73
... More
Drilling oval shaped hole of various sizes on existing
Channel/Cross Arm/GI/MS cleat etc.
12
489
40.77
... More
Cutting Channel/Cross Arm/Angle Iron into two
pieces.
1
62
62.73
... More
Fitting and erecting one HT PSC Pole in position incl.
fitting cross arm, digging & back filling pit, drawing earth leads.
12
39292
3274.36
... More
Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
2
17471
8735.82
... More
Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
1
10473
10473.36
... More
Insertion of one HT A type pole in existing line incl.
digging & backfilling pit, fitting cross arm, insulators,
binding etc.
36
154873
4302.05
... More
Fitting and providing one HT Stay for 11kV pole incl.
digging & back filling pit.
16
21979
1373.73
... More
Fitting and providing one Strut using HT PSC pole incl.
digging & back filling pit.
1
3056
3056.91
... More
Providing Strut using LT PSC
pole incl. digging & back
filling pit.
2
3774
1887.05
... More
Fitting one set AB switch and giving connection
2
5591
2795.55
... More
Conveyance of one km 11kV line materials from section
store/stacking place to the work site (excluding poles).
0.1
173
1737.55
... More
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials
41
19759
481.95
... More
Fitting one Additional 75x40mm, 1.8m Channel cross
arm in existing single pole incl. conveyance of materials.
27
13012
481.95
... More
Fitting one Additional 2.4m/3m Channel cross arm
(75x40x6mm), in existing 11kV DP incl. conveyance of
materials
15
8138
542.59
... More
Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.
14
1961
140.09
... More
Fitting one LT 4 line cross arm on HT or LT existing poles
incl. fitting insulators and binding the same with LT Line.
15
3152
210.14
... More
Fitting one additional HT pin with insulator
108
16146
149.5
... More
Fitting one additional F top bracket
1
149
149.5
... More
Additional rate for refitting/redoing one Disc set
while renewing any type of 11kV cut pole
6
4334
722.41
... More
Re-Tensioning one span 11kV line incl. replacing insulators, tightening stay, cutting tree branches and conveyance.
6
4365
727.64
... More
Renewing one 11kV Jumper using Copper/ACSR conductor as per standard specification (in loop formation for tapping from line).
3
1298
432.82
... More
Additional rate for refitting/redoing one Shackle
set and reshackling one span while renewing any type of pole.
10
3418
341.86
... More
Reshackling one span LT 3ph 4 wire OH line, replacing
insulators, tightening stay, cutting tree branches incl.
conveyance.
4
1973
493.45
... More
Reshackling one span LT OH Addl conductor, replacing
insulators, tightening stay, cutting tree branches incl.
conveyance.
4
464
116.05
... More
Transferring LT Sph 2/3 wire OH line to newly erected
HT/LT pole and refitting all items to the new pole.
4
3516
879.23
... More
Transferring LT 3ph 4/5 wire OH line to newly erected
HT/LT pole and refitting all items to the new pole.
30
53349
1778.32
... More
Dismantling (without damage) one HT stay incl. back filling, and bringing back to section store.
1
904
904.32
... More
Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation
16.6
26389
1589.72
Evaluation Notes How It Works ?