Kerala State Electricity Board Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date15 Feb 2025
Closing SoonCancelled
Tender Amount₹ 6,61,588 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.

12

492

5908.92

... More
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.

0.78

13827

10785.2

... More
Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles

1.21

45

55.02

... More
Dismantling of 11 kV Aerial bunched cable XLPE insulated of size 3 x 120+ 1 x 95 sqmm with bare insulated Messenger

1.21

22

27.51

... More
Dismantling One no MVT on existing cross arm of any rating for 11 kV AB Cable (Half rate of fitting)

36

96

3474

... More
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.

3

1778

5334.96

... More
Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.

0.21

7443

1563.16

... More
Stringing one km LT Sph 3 wire line (Rabbit for Ph&N, Weasel for St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials.

0.21

23764

4990.49

... More
Insertion of one HT A type pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc.

2

4302

8604.1

... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.

10

1373

13737.3

... More
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.

47

96

4520.46

... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.

5

149

747.5

... More
Dismantling one set 1x40 W fluorescent tube fitting from pole, repairing and refitting the same in position and giving connection.

23

611

14066.57

... More
Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls.

0.82

14129

11586.04

... More
Dismantling (without damage) one HT PSC/RCC Strut pole incl. removal of clamps and stacking.

5

2866

14333.2

... More
Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

55

3274

180089.8

... More
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

4

762

3048.56

... More
Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

2

478

957.64

... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.

2

3142

6284.52

... More
Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).

2

906

1812.82

... More
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

57

3129

178355.85

... More
Dismantling (without damage) one HT stay incl. back filling, and bringing back to section store.

11

904

9947.52

... More
Stringing one km LT 3ph 5 wire line (Rabbit for Ph and Weasel for N&St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials.

0.82

38753

31778.24

... More
Dismantling one section fuse

3

192

577.08

... More
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.

3

240

721.35

... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.

0.78

34792

27138.33

... More
Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable

36

963

34668

... More
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.

6

3056

18341.46

... More
Insertion of one HT PSC pole in existing HT/LT line incl. digging & back filling pit, fitting cross arm, insulator, binding etc.

3

4089

12269.46

... More
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.

2

4805

9611.9

... More
Dismantling (without damage) one AB switch from existing structure and bringing back to section store.

2

1676

3353.82

... More
Fitting one set AB switch and giving connection

2

2795

5591.1

... More
Providing Strut using LT PSC pole incl. digging & back filling pit.

3

1887

5661.15

... More
Erecting one LT PSC Pole in position incl. digging & back filling pit.

1

2017

2017.73

... More
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

3

1008

3026.58

... More
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

3

1923

5770.92

... More
Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.

1

879

879.23

... More
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).

2

4028

8056.58

... More
Providing WP support with PSC pole incl. digging & back filling pit.

1

1943

1943.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.