Kerala State Electricity Board Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date20 Jan 2025
Closing Soon29 Jan 2025
Tender Amount₹ 54,87,163 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Transport of materials issued departmentally for the works form departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges etc as directed by Board staff. - general area Towers, extensions and other structures

54.67

1985

108548.32

... More
Earth work excavation in all kinds of soil by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift up to 1.5 M.

350

212

74445

... More
Earth work excavation in all kinds of soil by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 1.5 M to 3M.

350

318

111443.5

... More
Earth work excavation in all kinds of soil by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 3M to 4.5 M

95

424

40294.25

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift up to 1.5 M as directed by Engineer In Charge Ordinary rock

36

412

14842.44

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 1.5 M to 3M as directed by Engineer In Charge Ordinary rock

36

601

21668.76

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 3 M to 4.5M as directed by Engineer In Charge Ordinary rock

10

791

7915.2

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift up to 1.5 M as directed by Engineer In Charge Hard rock require blasting

18

713

12836.88

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 1.5 M to 3M as directed by Engineer In Charge Hard rock require blasting

18

902

16249.86

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 3 M to 4.5M as directed by Engineer In Charge Hard rock require blasting

6

1092

6554.34

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift up to 1.5 M as directed by Engineer In Charge Hard rock (blasting prohibited)

4

1188

4755.04

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 1.5 M to 3M as directed by Engineer In Charge Hard rock (blasting prohibited)

4

1378

5513.52

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 3 M to 4.5M as directed by Engineer In Charge Hard rock (blasting prohibited)

1

1567

1567.99

... More
Drilling holes for providing anchor / dowel bars varying in depth and diameter in rock or conctrete and cleaning the holes, grouting with cement grout after fixing dowel bars including cost of all materials, labours etc. complete as per specification and drawings.

20

227

4550

... More
Providing anchor bars of varying depth using Tor steel, bend, jumped, etc. including cost and conveyance of all materials, labours etc. complete as per specification and drawings as directed by departmental officers.

70

89

6262.2

... More
Close timbering over areas including strutting,shoring and packing cavities( where ever required) complete.( Measurement to be taken of the face area timbered) Depth not exceeding 1.5M

250

136

34000

... More
Close timbering over areas including strutting,shoring and packing cavities( where ever required) complete.( Measurement to be taken of the face area timbered)- Depth exceeding 1.5M but not not exceeding 3M

250

151

37950

... More
Close timbering over areas including strutting,shoring and packing cavities( where ever required) complete.( Measurement to be taken of the face area timbered)- Depth exceeding 3M but not not exceeding 4.5M

200

168

33668

... More
Construction of earthern ring bunds for bailing out water for excavation for foundation and stub setting, including shoring, if necessary, with plaited coconut cadjan and bamboos, etc. as per dimensions noted below.

50

761

38053.5

... More
Bailing out water with engine and pump set including conveyance to site and erection cost of fuel, lubricating oil and other stores, pay of staff etc.complete

200

117

23460

... More
Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete

300

333

99972

... More
Stub setting (using template/probe) for 110 kV towers. Erection of stub, stub template, fixing of jack for supporting template, allignment and leveling for exact location of stubs of stub setting template, dismantling of template after completion of initial curing of Cement concrete, movement of template from one location to another complete, as directed by Board staff. - general area (For110 kV DC Tower)

8

9631

77050

... More
Cement concrete 1:2:4 mixture with 40 mm metal for tower footing in accordance with the specification including the cost of cement to be supplied by the contractor at site, conveyance charges of cement to site of work, all hire charges, watering, curing, etc, complete.

23

7814

179734.19

... More
Cement concrete 1:2:4 mixture with 40 mm metal for tower footing in accordance with the specification including the cost of cement to be supplied by the contractor at site, conveyance charges of cement to site of work, all hire charges, watering, curing, etc, complete.( requiring head load up to 0.5km)

73.31

8872

650446.64

... More
Cement concrete 1:2:4 mixture with 20 mm metal for tower footing in accordance with the specification including the cost of cement to be supplied by the contractor at site, conveyance charges of cement to site of work,all hire charges, watering, curing, etc, complete. (For chimney)

2.7

7941

21441.59

... More
Cement concrete 1:2:4 mixture with 20 mm metal for tower footing in accordance with the specification including the cost of cement to be supplied by the contractor at site, conveyance charges of cement to site of work,all hire charges, watering, curing, etc, complete.( requiring head load up to 0.5km) (For chimney)

11

8979

98769.11

... More
Filling available excavated earth (Excluding rock) in trenches, Plinth, side of foundation etc, in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming and watering lead up to 50 M lift up to 1.5 M

724.63

256

186208.17

... More
Providing earthing in terminal tower as per standard specification by providing 150mm dia bore hole for a depth of 3.6m and placing of GI pipes 50 mm dia GI "C" class 3m long into the bore including cost of 600 mm dia RCC collar placing over the earth pipe and connecting the earth pipe and tower leg using 7/3.66 mm GI earth wire with lugs connecting to the pipe and fixing necessary GI clamp etc., including drilling of bore cost of all lead and lifts etc., complete.

16

10201

163230.08

... More
Erection of tower super structure above ground level including erection of normal and special hill side extension members wherever necessary, providing tower accessories like phase, danger and number plates, bird guards, anti climbing devices, including tighting ,punching and tack welding upto bottom cross arm in the bolt and nut after punching and applying zink rich primer wherever necessary etc. complete, as directed by Board staff (For 110 kV DC Tower - Average height is 22 mtrs) general area

50.35

15237

767208.13

... More
Random rubble masonry with hard stone in foundation and plinth including levelling up upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand)

33

7160

236283.96

... More
Plastering on the top of revetment with 1:4 cement mortar 20 mm thick .

10

427

4272.8

... More
Pointing the outer faces of revetment with cement mortar 1:3

22

333

7345.36

... More
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth up to and including 60 cm girth

52

445

23150.92

... More
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth up to and including 120 cm girth

120

1982

237850.8

... More
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth up to and including 240 cm girth

60

9195

551716.2

... More
Paving out, stringing and tensioning as per standard of one 7/10 OR 7/3.15stranded steel earth wire including fixing the conductors on to the tower top using tension clamps and suspension clamps, jumpering the conductors at tension points, jointing the conductor wherever necessary, erection of earth bonds, hire charges of tractor and stringing tools, etc. Complete.

1.4

48931

68504.14

... More
Paving out, stringing and tensioning OF POWER CONDUCTORS including attaching insulator strings with arcing horns or rings on to the tower cross arms, clamping the conductor to the insulator strings using suspension clamps with armour rods and tension clamps, jumpering the conductors at tension points, jointing the conductors and pilot wire wherever necessary, installation of vibration dampers hire charges of tractor and stringing tools, etc. Complete.6 Line wolf Double circuit

1.3

305056

396573.45

... More
Drilling of holes

420

166

70127.4

... More
Filing of holes

420

90

38110.8

... More
Cutting of steel angles

180

333

60107.4

... More
Providing GI barbed wire protection to towers with 2 strand barbed wire weighing 9.38 kg per 100 m (minimum) fixed with GI staples to posts around erected towers including cost and conveyance of all materials, labor charges etc. complete as directed.

850

11

9647.5

... More
Providing derrick support and temporary stay arrangement for a tower

8

5577

44620

... More
Final checking of towers to ascertain all members and correct size of bolts and nuts ,hardware fittings ,insulators with cotter pin ,arching horns before commissioning of the line

9

1553

13985.37

... More
Paving out, stringing and tensioning as per standard one OPGW including fixing the conductors on to the tower tops using tension clamps and suspension clamps , jumpering the conductor at tension points , jointing of conductor where evre necessary, erection of earth bonds, hire charges d for pulling machines, tractors and stringing tools, all hire and labour for protective trestles and providing suitable back strings at the time of stringing etc complete.

1.4

71735

100429

... More
Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly.

1

7443

7443.64

... More
Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly.

1

14129

14129.32

... More
Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials.

1

13827

13827.18

... More
Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and Neutral, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.

1

16967

16967.73

... More
Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place

1

31957

31957.45

... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works.

1

34792

34792.73

... More
SUPPLY OF MATERIALS - 48 Fibre (G652.D DWSM) OPGW Cable having minimum UTS of 71.7 kN suitable for 110 kV transmission line of KSEBL 48 Fibre (G652.D DWSM) OPGW Cable having minimum UTS of 71.7 kN suitable for 110 kV transmission line of KSEBL

2

170358

340716

... More
Suspension Assembly complete set suitable for the 48 Fibre OPGW Cable

1

4352

4352

... More
Tension Set Assembly complete, suitable for the 48 Fibre OPGW Cable

8

8641

69128

... More
Dead end Assembly complete, suitable for the 48 Fibre OPGW Cable

1

4083

4083

... More
Tension ( For Joint box Locations) Assembly complete, suitable for the 48 Fibre OPGW Cable

2

7988

15976

... More
Pass Through Assembly for 48 fibre OPGW Cable

8

7988

63904

... More
Vibration Damper complete set suitable for the 48 Fibre OPGW Cable

18

799

14382

... More
Down Lead Clamp Assembly complete set suitable for the 48 Fibre OPGW Cable

70

532

37240

... More
Joint Box (48 Fibre)(one Joint box after 2km)

2

8193

16386

... More
Self Supporting cubicle of Size 1220*600*600mm Suitable for 96 Fibre (FODP)

1

20354

20354



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.