Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KSEB_706778_1Tender No
E Tender No PMU/Dyuthi2/Changanacherry/E tender-21/2024-25/ dated 18.11.2024.Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://http://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General_Conditions_for_e-Tendering
BOQ Items
... More
Erection of Lattice tower superstructure above ground level (excluding the stub portion) including errecting member, Cross Arms wherever necessary. Providing tower accessories like phase, danger and number plate etc.
24
8805
211321.92
... More
Stub setting of Lattice tower in correct alignment using template in concrete foundation including, anchoring etc, if necessary and removing the template after the expiry of the predetermined time but excluding excavation, concreting, back filling etc complete.
16
3882
62117.92
... More
Back filling of pits after stub setting with the original excavated soil etc. complete
30
260
7805.7
... More
Cement Concrete 1:2:4 mixture with 20 mm broken stone and M-sand for encasing the poles in accordance with the specification including cost of all materials and conveyance, form work, labour charges, watering, curing, coping the chimney etc. complete
95
8040
763890.25
... More
"Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil"
95
298
28386
... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil
300
215
64611
... More
Cement Concrete 1:3:6 mixture with 40 mm broken stone and M-sand for foundation bed including cost of all materials and watering, curing etc. complete
50
7256
362818
... More
Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete
190
337
64106
... More
Plastering with cement mortar 1:4 usibg M-sand, 12 mm thick, one coat floated hard and trowelled smooth to the concrete complete
95
327
31069.75
... More
Fitting one additional HT pin with insulator
1740
149
260130
... More
Additional rate for providing one disc set on any type of HT pole for making cut point.
198
158
31464.18
... More
Dismantling one Anchor clamp /dead end clamp from 11 KV ABC
60
77
4623
... More
Erection of Anchor clamp / dead end clamp for 11kV ABC of any size
60
164
9880.2
... More
Erection of suspension clamp for 11KV ABC of any size
150
164
24700.5
... More
Dismantling one suspension clamp from 11 KV ABC
150
77
11557.5
... More
Dismantling of 11 kV Aerial bunched cable XLPE insulated of size 3 x 120+ 1 x 95 sqmm with bare insulated Messenger
5000
22
114050
... More
Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles
5000
45
228100
... More
Providing Cable Tie
1740
3
6699
... More
Providing End Caps
56
6
355.04
... More
Stringing of one km 3PH 11 Line with XLPE insulated ACSR Raccoon
12400
43
538036
... More
Providing bridging at Cut points for 3 PH11kV line with XLPE Insulated ACSR Raccoon
222
173
38485.92
... More
Drilling hole of various sizes on existing Channel/Cross Arm.
6000
16
100380
... More
Cutting Channel/Cross Arm/Angle Iron into two pieces.
100
62
6273
... More
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
22
762
16767.08
... More
Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).
38
906
34443.58
... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.
25
3142
78556.5
... More
Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 poles. (Running km).
120
103
12420
... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.
10
1373
13737.3
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.
30
868
26063.1
... More
Additional rate for excavation of one Pit for Coil Earthing in Laterite
18
434
7828.38
... More
Additional rate for excavation of Pit for A type pole in Laterite.
20
651
13026.4
... More
Providing one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil.
15
592
8891.55
... More
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.
110
1086
119485.3
... More
Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
14
4143
58003.96
... More
Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
4
10473
41893.44
... More
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.
10
3056
30569.1
... More
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.
10
4805
48059.5
... More
Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
2
3274
6548.72
... More
Providing stay (temporary nature) by piling Cut Ends in kole land incl. fabrication of cut ends and conveyance.
30
1443
43313.1
... More
Fitting one set (3No.) 11kV LA and giving connections excluding earthing.
12
481
5783.4
... More
Fitting one set AB switch and giving connection
4
2795
11182.2
... More
Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.
12
140
1681.08
... More
Construction of earthern ring bunds for bailing out water for excavation for foundation and stub setting, including shoring,if necessary, with plaited coconut cadjan and bamboos, etc.as per dimensions Bunds upto 0.5 m height, 1 m bottom width and 0.5 m top Width
90
360
32400
... More
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.
0.15
13827
2074.08
... More
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
7
3129
21903.35
... More
Construction of earthern ring bunds for bailing out water for excavation for foundation and stub setting, including shoring,if necessary, with plaited coconut cadjan and bamboos, etc.as per dimensions Bunds beyond 0.5 m height to 1 m height , 1.5 m bottom width & 0.5 m top width
110
1323
145546.5
... More
Driving down coconut piles 200 mm to 300 mm dia to approved line and levels through various strata including cost of piles, all hire and labour for fixing staging platform and all other appliances necessary for pile driving after pointing the bottom and upto 8 m depth below ground level, etc complete.
305
1243
379343.75
... More
Bailing out water with engine and pump set including conveyance to site and erection cost of fuel, lubricating oil and other stores, pay of staff etc.complete
120
127
15288
... More
Dewatering Manual
60
72
4330.8
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements