Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala State Electricity Board Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date2 Dec 2024
Closing Date16 Dec 2024
Tender Amount₹ 8,90,686
Costs
EMD
₹ 22,300Document Cost
₹ 2,124Tender Fee
Refer Documents
Summary
Construction 11kv Line And Installing 100kva Transformer For Sop To Kwa Phsd Manjeri.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KSEB_710530_1Bid Award Id
ViewTender No
1/ESDWDR/24-25/28.11.2024Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Fitting one Additional 2.4m/3m channel cross arm(75*40*6mm),in existing 11 KV DP incl.conveyance of materials
5
542
2712.95
... More
Fitting one Additional 2.4m/3m channel cross arm(100*50*6mm),in existing 11 KV DP incl.conveyance of materials
1
564
564.55
... More
Providing concrete muffing(0.45*0.45*1.5m)inclusive of cost of all material(as per specification)
7
4028
28198.03
... More
Providing Transformer fencing using 50*50*6mm Angle iron,40*6 mm MS flat and 8 mm MS rod as specified,incl cost of transportation and foundaton
24
1589
38153.28
... More
Providing yard metalling with 6mm and 40mm thick blue metal as specified after constructing a curb wall
10
769
7691.8
... More
Dismantling and reconnecting Sph service connection from the OH line including lowering down the WP portion
61
96
5866.98
... More
Additional rate for excavation of Pit for A type pole in Hard Laterite
7
1303
9125.76
... More
Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite
14
434
6088.74
... More
Dismantling and reconnecting 3ph service connection from the OH line including lowering down the WP portion
2
149
299
... More
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting
15
492
7386.15
... More
Erection of suspension clamp for 11KV ABC of any size
27
164
4446.09
... More
Erection of Anchor clamp/dead end clamp for LT ABC of any size
26
164
4281.42
... More
Erection of suspension clamp for LT ABC of any size
14
164
2305.38
... More
Providing cable Tie
150
3
577.5
... More
Installing One No.Insulation piercing connector of size Main:16 to 95,Tap:1.5 to 16 Sq.mm
15
57
866.85
... More
Installation of Pre-insulated straight through joints for 16 sqmm cable
1
96
96.31
... More
Installation of Pre-insulated straight through joints for 50 sqmm cable
1
96
96.31
... More
Installation of Pre-insulated straight through joints for 70 sqmm cable
3
96
288.93
... More
Doing one cable end termination on HT ABC of sizes Up to 3*150+1*120 sqmm
18
370
6660
... More
Installation of Pre-insulated lugs for 16 sqmm
1
52
52.5
... More
Installation of Pre-insulated lugs for 50 sqmm
1
52
52.5
... More
Installation of Pre-insulated lugs for 70 sqmm
3
52
157.5
... More
Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line
3
351
1053.81
... More
Providing one Earth using earth pipe incl.digging separate pit at standard distance away from the pole/structure and backfilling
17
2266
38531.35
... More
Providing one coil Earth using GI earth wire,.digging separate pit at standard distance away from the pole/structure and backfilling
10
1086
10862.3
... More
Providing End Caps
5
6
31.7
... More
Fitting One no MVT on existing cross arm excluding termination work(for One phase)of any rating for 11 kV AB cable
15
193
2895
... More
Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole
13
879
11429.99
... More
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole
45
1778
80024.4
... More
Fitting and providing one Struct using HT PSC pole incl.digging and back filling pit.
5
3056
15284.55
... More
Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 poles(Running km)
14
103
1449
... More
Transporting Transformers by hired vehicle to a distance beyond 5km and upto 2 No.of 63 to 250 kVA Transformers/RMUs(Runnng km)
1
103
103.5
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite
48
868
41700.96
... More
Erection of Anchor clamp/dead end clamp for 11 kV ABC of any size
34
164
5598.78
... More
Fitting and providing one HT Stay for 11kV pole incl.digging and back filling pit.
34
1373
46706.82
... More
Fitting and erecting one HT PSC Pole in position incl.fitting cross arm,digging and back filling pit,drawing earth leads
37
3274
121151.32
... More
Fitting and erecting one HT PSC DP,fitting all accessories(2 stays,8 cross arms,AB,DO,LA etc.),mounting of 100 kVA Transformer,fixing DB,DTR box and giving all HT and LT connections
1
34923
34923.41
... More
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl.digging and back filling pits.
4
4805
19223.8
... More
Providing Struct using LT PSC pole incl.digging and back filling pit.
1
1887
1887.05
... More
Loading HT PSC pole from the stacking place and unloading the same at work site(transport by vehicle)
48
762
36582.72
... More
Loading HT A type pole from the stacking place and unloading the same at work site(transport by vehicle)
7
906
6344.87
... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading and unloading.
14
3142
43991.64
... More
Transporting Transformers by hired vehicle upto 5km and upto 2 No.of 63 to 250kVA Transformers/RMUs excluding loading and unloading.
1
3142
3142.26
... More
Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and unloading using crane
2
4999
9998.1
... More
Conveyance of one km 11 kV line materials from section store/stacking place to the work site(excluding poles)
6
1737
10425.3
... More
Dismantling(without damage)one LT PSC/RCC pole after disconnecting stays,struct,etc.and stacking the same
36
1923
69251.04
... More
Dismantling(without damage)one km LT Sph 2 wire OH line,cross arms,insulators and stacking the conductors in rolls
0.63
7443
4689.49
... More
Fitting and erecting one HT A type pole in position incl.fiting cross arm,digging and back filling pit,drawing earth leads.
7
4143
29001.98
... More
Erecting one LT PSC pole in position incl.digging and back filling pit.
14
2017
28248.22
... More
Providing Stay for LT poles incl.digging and back filling pit
13
938
12204.66
... More
Stringing of 11 kV Aerial bunched cable of size 3*120+1*95 sqmm with bare/insulated Messenger through existing poles
930
45
42426.6
... More
Stringing of 11 kV Aerial bunched cable of size 3*70+1x16+1x50 sqmm with bare/insulated Messenger through existing poles
630
40
25527.6