Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 50,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KSEB_672550_2Bid Award Id
ViewTender No
PM/CH III-MRPZ/01/2024-25 dated 09.05.2024Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://https://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
2.7.2 : Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (requiring blasting)
50
-
-
2.7.3 : Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (blasting prohibited
50
-
-
od317127/2023_2024 : Demolishing cement concrete manually / by mechanical means including disposal of<br>material within all leads as per direction of Engineer - in-Charge.<br>Nominal concrete 1:3:6 or richer mix (i/c<br>equivalent design mix)<br>Details of cost for 1 cum
400
-
-
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
25
-
-
od317128/2023_2024 : Cutting and removing of existing penstock pipes, steel plates and fittings and weighment at nearest weigh bridge,including conveyance and stacking at designated place including labour charges, loading and unloading charges, transporting charges, equipments etc. complete and as directed by the departmental officers. (Approved Sengulam data)
40
-
-
RE-CONSTRUCTION WORK
-
-
-
od317123/2023_2024 : Ultrasonic inspection of steel plate (ASTM A516 Grade 70 or its equivalent IS) at place of delivery/ fabrication, prior to fabrication of plates including all expenses for testing arrangements, labour charges etc. complete as per specifications, approved drawings and as directed by departmental officers.
660
-
-
od317124/2023_2024 : Design, Supply and Fabrication of penstock pipes at erection site using steel plates conforming to ASTM A516 Gr 70 or its equivalent IS specifications, including cost of steel, electrodes, welding flux and accessories, carrying out stress relieving and all tests other than those for which separate items are included, shot/sand blasting and protective coating for inside two coats of Zinc rich primer and two coats of coal tar epoxy paint, for outside one coat of zinc rich primer followed by cement wash having a composition of cement, water and pottassium dichromate in 20:8:1 ratio first coat at workshop, insurance charges, all labour charges, transportation charges etc. complete as per specifications, approved drawings and as directed by the departmental officers. (modified 72.4.2)
40
-
-
od317125/2023_2024 : Design, Supply and Fabrication of flanges, bends, expanders, reducers, Y piece, Manhole etc by using steel plates conforming to ASTM A516 Gr 70 or its equivalent IS specifications, including cost of steel, electrodes, welding flux & accessories, gasket for manhole, etc., carrying out stress relieving and all tests other than those for which separate items are included, sand blasting and protective coating for inside two coats of Zinc rich primer and two coats of coal tar epoxy paint, for outside one coat of zinc rich primer followed by cement wash having a composition of cement, water and pottassium dichromate in 20:8:1 ratio first coat at workshop, insurance charges, all labour charges, transportation charges etc. complete as per specifications, approved drawings and as directed by the departmental officers. (Modified DAR 72.4.3)
5
-
-
72.4.6 : Erection and installation of pipes, flanges, bends, Y-piece, expanders, reducers etc. including conveyance to the haulage position over the substructure anchors, placing in position, assembling, welding, followed by second coat of cement wash having a composition of cement, water and pottassium dichromate in 20:8:1 ratio, etc. complete as per specifications and approved drawings including all labour charges, transportation charges, equipments, final protective coating, insurance charges etc. complete as directed by the departmental officers
45
-
-
72.4.4 : Penstock Radiographic inspection of shop weld carried out at fabrication site/ factory as per specifications including all expenses for testing arrangements and labour charges etc. complete as directed by the departmental officers.
170
-
-
72.4.5 : Penstock Radiographic inspection of field weld as per specification including all expences for testing arrangements and labour charges etc. complete as directed by the departmental officers
300
-
-
od317129/2023_2024 : Cement concrete M20 with 20mm graded aggregates laying to lines and levels at all elevations, consolidating, curing, including cost of all materials, labour and conveyance charges, etc. complete but excluding cost of cement as directed by the departmental officers.<br>KSEB VI.8
580
-
-
od317130/2023_2024 : Cement concrete M15 with 20mm graded aggregates laying to lines and levels at all<br>elevations, consolidating, curing, including cost of all materials, labour and conveyance charges, etc.<br>complete but excluding cost of cement as directed by the departmental officers
140
-
-
22.4.1 : Providing and Placing in position suitable PVC water stops conforming to IS : 12200 for construction / expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete:Serrated with central bulb ( 225 mm wide, 8-11 mm thick)
46
-
-
od317131/2023_2024 : Providing and filling the expansion joints with bitumen pad (25 mm) including cost of all materials, labour, etc. complete as per drawings and specifications and as directed by departmental officers.<br>KSEB XVIII-3
43
-
-
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
18400
-
-
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
720
-
-
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
310
-
-
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
42
-
-
od317134/2023_2024 : Dry rubble Pitching/Rough stone dry packing to lines and levels including cost of all materials , conveyance, labour charges, etc,complete as per specification. (KSEB VII-5)
70
-
-
od317135/2023_2024 : Drilling holes for providing anchor/dowel bar varying in depth and diameter in rock of concrete and cleaning the holes , grouting with cement grout (CM 1:2) after fixing dowel bars including cost of all materials labour etc, complete as per specification and drawings. KSEB DATA IV - I
75
-
-
od317136/2023_2024 : Providing Anchor Bars of varying depth using tor steel, bend,jumped.etc.including cost and conveyance of steel, labour charges, etc complete as per the specifications and drawing as direxcted by the departmental officers.<br>KSEB DATA IV
580
-
-
od317137/2023_2024 : Dry rubble masonry for foundation and basement including cost of all materials, conveyance, labour charges, etc. complete as per specifications. ( Assuming 70 % of Deptl and 30 % Contractors) KSEB VII-3
25
-
-
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
10
-
-
od317138/2023_2024 : Back filling with departmental earth above 50m and within 1km lead and all lift and compacting in layers including, labour charges etc. complete as per specifications and as directed by departmental officersKSEB III-20
4160
-
-
51.2.3 : Filling with Quarry Muck br Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
200
-
-
od317142/2023_2024 : Fabricating, supplying and installing miscellaneous metal works for various works or any other steel item specified in drawing such as hatch cover, frames, gratings, chequered plates, rails, embedded parts, angle post of chain link fencing, etc. at all elevations including cost of all materials,conveyance, fabrication, welding and fixing charges, applying one coat primer,two coats of enamel paints etc. complete as directed by the departmental officers.<br>KSEB XVIII. 17
100
-
-
od317143/2023_2024 : Supply and usage of cement at site including cost of cement, conveyance charge, storage arrangements,<br>charges for stacking and re-stacking if nescessery, etc. complete as directed by the departmental<br>officers.
280
-
-
od317144/2023_2024 : Supply and usage of admixture at site including cost of admixture, conveyancecharge, storage arrangements if necessary etc. complete as directed by the departmental officersKSEB VI.29
1475
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements