Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Civil And Construction
Eprocure
Opening Date7 Sep 2024
Closing Date17 Oct 2024
Tender Amount₹ 15,98,288 
Notes
Download

Costs

Summary

Construction Gantry Tower At 110kv Substation Thiruvaly

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work excavation in all kinds of soil by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50m and lift 1.5m to 3m.

16.5

5319

322.41

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50m and lift up to 1.5m as directed by Engineer In Charge. Ordinary rock

32.5

13566

417.44

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50m and lift 1.5m to 3m as directed by Engineer In Charge. Ordinary rock

47.5

28946

609.41

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50m and lift 3m to 4.5m as directed by Engineer In Charge. Ordinary rock

8.23

6592

801.38

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50m and lift up to 1.5m as directed by Engineer In Charge. Hard rock (blasting prohibited)

1

1203

1203.67

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50m and lift 1.5m to 3m as directed by Engineer In Charge. Hard rock (blasting prohibited)

1

1395

1395.64

... More
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 3m to 4.5m as directed by Engineer In Charge. Hard rock (blasting prohibited)

1

1587

1587.62

... More
Stub setting (using template /probe) for 110kV towers. Erection of stub, stub template, fixing of jack for supporting template, allignment and leveling for exact location of stubs of stub setting template, dismantling of template after completion of initial curing of Cement concrete, movement of template from one location to another complete, as directed by Board staff. - general area (For110 kV DC Tower)

1

10740

10740.31

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level with Thermo-Mechanically Treated bars Thermo - Mechanically Treated bars of grade Fe-500D or more

1330

131563

98.92

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

5.5

40775

7413.74

... More
Centering and shuttering including strutting, propping etc. and emoval of form work for :Foundations, footings, bases for columns.

24

8098

337.42

... More
Centering and shuttering including strutting, propping etc. and removal of form work for :Columns, piers, abutments, pillars, posts and struts

28

24333

869.04

... More
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately.All wiork upto plinth level

18

179063

9947.98

... More
Add for using extra cement in the items of design mix over and above the specified cement content therein

13

10367

797.49

... More
CEMENT PLASTER (IN FINE SAND): 12 mm cement plaster of mix 1:3 (1 cement : 2 fine sand)

4

1077

269.26

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.

133

34604

260.18

... More
Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.

9

2676

297.36

... More
Excavation of earth pit of size 0.3 x 0.3 x 3.6 m including over excavation on account of sloping the banks and necessary hire for planks for filling of charcoal, earthing of tower by means of a 50 mm dia, 3 m long pipe and a double run 7/9 S.W.G galvanised steel wire or G.1 tape including cost of charcoal but excluding cost of pipes, steel wire or copper tape with connecting lugs, nuts, etc. which will be supplied at departmental stores (to be specified)

2

14058

7029.4

... More
Drilling holes on GI/steel members wherever found necessary

43

7179

166.97

... More
Filing holes on GI/steel members wherever found necessary

43

3901

90.74

... More
Cutting GI/steel members wherever found necessary

39

13023

333.93

... More
Erection of tower super structure above ground level including erection of normal and special hill side extension members wherever necessary , providing tower accessories like phase, danger and number plates, bird guards, anticlimbing devices, including tighting, punching and tack welding up to bottom crossarm in the bolt and nut after punching and applying zink rich primer wherever necessary etc. complete, as directed by Board staff (For 110kV DC Tower-Average heightis 22 mtrs ) general area

6.86

109516

15964.49

... More
Paving out, stringing and tensioning as per standard of one 7/10 OR 7/3.15 stranded steel earthwire including fixing the conductors on to the tower top using tension clamps and suspension clamps, jumpering the conductors attension points, jointing the conductor wherever necessary, erection of earth bonds, hire charges of tractor and stringing tools, etc. Complete. ((.46/.59)* rate for 7/3.66)

1.61

78922

49020.33

... More
Paving out, stringing and tensioning OF POWER CONDUCTORS including attaching insulator strings with arcing horns or rings on to the tower cross arms, clamping the conductor to the insulator strings using suspension clamps with armour rods and tension clamps, jumpering the conductors attension points, jointing the conductors and pilot wire wherever necessary, installation of vibration dampers hire charges of tractor and stringing tools, etc.Complete.(Base data for ACSR panther)

1.5

462971

308647.72

... More
Providing GI barbed wire protection to towers with 2 strand barbed wire weighing 9.38kg per 100m(minimum) fixed with GI staples to posts around erected towers including cost conveyance of all materials, labour charges etc. complete as directed.

207

2411

11.65

... More
Dismantling of existing 7/10 or 7/3.15mm Earth conductor from the tower detaching the clamps, connectors and line accessories from the conductor, winding and stacking the same at site (Take 50% of the rate for stringing )

1.4

34314

24510.16

... More
Dismantling of POWER CONDUCTORS including dettaching insulator strings with arcing horns or rings on to the tower cross arms, de-clamping the conductor from the insulator strings using suspension clamps with armour rods and tension clamps, remove jumpres at tension points, removal od conductor and pilot wire, remong vibration dampers, hire charges of tractor and stringing tools, etc.Complete.(Base data for ACSR panther)

1.5

231485

154323.86

... More
Reshackling one span LT 3ph 4 wire OH line , replacing insulators, tightening stay, cutting tree branches including conveyance.

1

328

328

... More
Reshackling one span LT Sph 2 wire OH line, replacing insulators, tightening stay, cutting tree branches including conveyance.

1

174

174

... More
Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line Work.

4

256

64

... More
Transport of Towers, extensions and other structures and all other materials including earthing materials etc. issued departmentally for the works form departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges, 1km head load etc

6.61

20367

3081.36

... More
Transport of materials issued departmentally for the works form departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges, 1km head load etc. Line & Earth conductor

8.69

40077

4609.8

... More
Transport of Insulators and accessories, Power conductor accessories, Earth conductor accessories etc. issued departmentally for the works form departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges, 1km head load etc

1.08

5268

4878.05



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.