Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala State Electricity Board - KSEB Tender
Civil And Construction
Eprocure
Opening Date7 Sep 2024
Closing Date17 Oct 2024
Tender Amount₹ 15,98,288
Costs
EMD
₹ 40,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Construction Gantry Tower At 110kv Substation Thiruvaly
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KSEB_690058_1Bid Award Id
ViewTender No
ET/TCSD-NBR-01/24-25/7.9.24Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work excavation in all kinds of soil by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50m and lift 1.5m to 3m.
16.5
5319
322.41
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50m and lift up to 1.5m as directed by Engineer In Charge. Ordinary rock
32.5
13566
417.44
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50m and lift 1.5m to 3m as directed by Engineer In Charge. Ordinary rock
47.5
28946
609.41
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50m and lift 3m to 4.5m as directed by Engineer In Charge. Ordinary rock
8.23
6592
801.38
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50m and lift up to 1.5m as directed by Engineer In Charge. Hard rock (blasting prohibited)
1
1203
1203.67
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50m and lift 1.5m to 3m as directed by Engineer In Charge. Hard rock (blasting prohibited)
1
1395
1395.64
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 3m to 4.5m as directed by Engineer In Charge. Hard rock (blasting prohibited)
1
1587
1587.62
Stub setting (using template /probe) for 110kV towers. Erection of stub, stub template, fixing of jack for supporting template, allignment and leveling for exact location of stubs of stub setting template, dismantling of template after completion of initial curing of Cement concrete, movement of template from one location to another complete, as directed by Board staff. - general area (For110 kV DC Tower)
1
10740
10740.31
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level with Thermo-Mechanically Treated bars Thermo - Mechanically Treated bars of grade Fe-500D or more
1330
131563
98.92
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.5
40775
7413.74
Centering and shuttering including strutting, propping etc. and emoval of form work for :Foundations, footings, bases for columns.
24
8098
337.42
Centering and shuttering including strutting, propping etc. and removal of form work for :Columns, piers, abutments, pillars, posts and struts
28
24333
869.04
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately.All wiork upto plinth level
18
179063
9947.98
Add for using extra cement in the items of design mix over and above the specified cement content therein
13
10367
797.49
CEMENT PLASTER (IN FINE SAND): 12 mm cement plaster of mix 1:3 (1 cement : 2 fine sand)
4
1077
269.26
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
133
34604
260.18
Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
9
2676
297.36
Excavation of earth pit of size 0.3 x 0.3 x 3.6 m including over excavation on account of sloping the banks and necessary hire for planks for filling of charcoal, earthing of tower by means of a 50 mm dia, 3 m long pipe and a double run 7/9 S.W.G galvanised steel wire or G.1 tape including cost of charcoal but excluding cost of pipes, steel wire or copper tape with connecting lugs, nuts, etc. which will be supplied at departmental stores (to be specified)
2
14058
7029.4
Drilling holes on GI/steel members wherever found necessary
43
7179
166.97
Filing holes on GI/steel members wherever found necessary
43
3901
90.74
Cutting GI/steel members wherever found necessary
39
13023
333.93
Erection of tower super structure above ground level including erection of normal and special hill side extension members wherever necessary , providing tower accessories like phase, danger and number plates, bird guards, anticlimbing devices, including tighting, punching and tack welding up to bottom crossarm in the bolt and nut after punching and applying zink rich primer wherever necessary etc. complete, as directed by Board staff (For 110kV DC Tower-Average heightis 22 mtrs ) general area
6.86
109516
15964.49
Paving out, stringing and tensioning as per standard of one 7/10 OR 7/3.15 stranded steel earthwire including fixing the conductors on to the tower top using tension clamps and suspension clamps, jumpering the conductors attension points, jointing the conductor wherever necessary, erection of earth bonds, hire charges of tractor and stringing tools, etc. Complete. ((.46/.59)* rate for 7/3.66)
1.61
78922
49020.33
Paving out, stringing and tensioning OF POWER CONDUCTORS including attaching insulator strings with arcing horns or rings on to the tower cross arms, clamping the conductor to the insulator strings using suspension clamps with armour rods and tension clamps, jumpering the conductors attension points, jointing the conductors and pilot wire wherever necessary, installation of vibration dampers hire charges of tractor and stringing tools, etc.Complete.(Base data for ACSR panther)
1.5
462971
308647.72
Providing GI barbed wire protection to towers with 2 strand barbed wire weighing 9.38kg per 100m(minimum) fixed with GI staples to posts around erected towers including cost conveyance of all materials, labour charges etc. complete as directed.
207
2411
11.65
Dismantling of existing 7/10 or 7/3.15mm Earth conductor from the tower detaching the clamps, connectors and line accessories from the conductor, winding and stacking the same at site (Take 50% of the rate for stringing )
1.4
34314
24510.16
Dismantling of POWER CONDUCTORS including dettaching insulator strings with arcing horns or rings on to the tower cross arms, de-clamping the conductor from the insulator strings using suspension clamps with armour rods and tension clamps, remove jumpres at tension points, removal od conductor and pilot wire, remong vibration dampers, hire charges of tractor and stringing tools, etc.Complete.(Base data for ACSR panther)
1.5
231485
154323.86
Reshackling one span LT 3ph 4 wire OH line , replacing
insulators, tightening stay, cutting tree branches including
conveyance.
1
328
328
Reshackling one span LT Sph 2 wire OH line, replacing
insulators, tightening stay, cutting tree branches including
conveyance.
1
174
174
Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line Work.
4
256
64
Transport of Towers, extensions and other structures and all other materials including earthing materials etc. issued departmentally for the works form departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges, 1km head load etc
6.61
20367
3081.36
Transport of materials issued departmentally for the works form departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges, 1km head load etc. Line & Earth conductor
8.69
40077
4609.8
Transport of Insulators and accessories, Power conductor accessories, Earth conductor accessories etc. issued departmentally for the works form departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges, 1km head load etc
1.08
5268
4878.05