Kerala State Electricity Board Tender
... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 20,810Document Cost
₹ 1,970Tender Fee
Refer Documents
Summary
Natural Calamity- Construction Of The Damaged Retaining Wall Along The Colony Road And Drain Side Of Ib At Sholayar Colony
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KSEB_759081_1Tender No
E-01/2025-26/AEE/CMSD/PGLTender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://https://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete
32
335
-
... More
DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
46
1470
-
... More
12 mm cement plaster of mix:
1:4 ( 1 cement : 4 fine sand)
30
314
-
... More
Providing and laying up to floor five level reinforced cement concrete in kerbs, steps and the like excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
17
10549
-
... More
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Thermo - Mechanically Treated bars of grade Fe-500D or more
1360
98
-
... More
PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
20
112
-
... More
Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):
Flush/ Ruled pointing
10
335
-
... More
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.
G.I. pipes
350
186
-
... More
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.
On steel work
35
223
-
... More
Finishing walls with Acrylic Smooth exterior paint of required shade:
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
30
193
-
... More
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:
Cement mortar 1:6 (1 cement : 6 coarse sand)
36
7204
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements