Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 14,900Document Cost
₹ 1,416Tender Fee
Refer Documents
Summary
Vi Work At Sopanam Under Electrical Section Padinjarangadi
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KSEB_707806_1Bid Award Id
ViewTender No
TENDER/2024-25/6156/54 dated 19.11.2024Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://http://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.
7
2266
15865.85
... More
Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite.
7
868
6081.39
... More
Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation
24
1589
38153.28
... More
Providing yard metalling with 6mm & 40mm thick blue metal as specified after constructing a curb wall.
15
769
11537.7
... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.
12
3142
37707.12
... More
Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
2
8735
17471.64
... More
Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses.
1
10905
10905.14
... More
Drilling hole of various sizes on existing Channel/Cross Arm.
27
16
451.71
... More
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
29
762
22102.06
... More
Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials.
1
542
542.59
... More
Fiting One no MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable
6
193
1158
... More
Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm
6
370
2220
... More
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).
4
4028
16113.16
... More
Erection of LT 2 way distribution box on existing cross arm giving connection incl. cable and earth connection (excluding earthing).
1
3758
3758.41
... More
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.
2
481
963.9
... More
Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
23
3274
75310.28
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.
12
434
5218.92
... More
Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles
500
45
22810
... More
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
14
1778
24896.48
... More
Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
3
879
2637.69
... More
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.
28
96
2693.04
... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.
3
149
448.5
... More
Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole.
22
341
7520.92
... More
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.
8
492
3939.28
... More
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
18
1923
34625.52
... More
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
4
1008
4035.44
... More
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.
3
564
1693.65
... More
Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole
6
722
4334.46
... More
Fitting one set AB switch and giving connection
1
2795
2795.55
... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.
0.02
34792
521.89
... More
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.
2
3056
6113.82
... More
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.
26
1086
28241.98
... More
Erection of suspension clamp for 11KV ABC of any size
17
164
2799.39
... More
Erecting one LT PSC Pole in position incl. digging & back filling pit.
16
2017
32283.68
... More
Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
17
478
8139.94
... More
Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite.
18
434
7828.38
... More
Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite.
10
217
2174.5
... More
Providing Stay for LT poles incl. digging & back filling pit.
12
938
11265.84
... More
Providing Strut using LT PSC pole incl. digging & back filling pit.
1
1887
1887.05
... More
Installation of Insulation piercing connector for main to service line main
:16-95 sqmm, Tap 16-95 sqmm
42
57
2427.18
... More
Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane
1
4999
4999.05
... More
Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles
730
40
29579.6
... More
Installation of Insulation piercing connector for main to service line main
:16-95 sqmm, Tap : 4-35 sqmm
24
57
1386.96
... More
Erection of Anchor clamp / dead end clamp for LT ABC of any size
36
164
5928.12
... More
Providing End Caps
50
6
317
... More
Erection of suspension clamp for LT ABC of any size
26
164
4281.42
... More
Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation.
1
7153
7153
... More
Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.
0.55
7443
4094
... More
Installing One No. Insulation piercing connector of size Main :16 to 95
,Tap:1.5 to 16 Sq.mm
26
57
1502.54
... More
Installation of Insulation piercing connector for main to service line main
:50-150 sqmm, Tap : 4-35 sqmm
48
57
2773.92
... More
Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size
22
48
1059.52
... More
Installation of Pre-insulated straight through joints for 16sqmm cable
2
96
192.62
... More
Installation of Pre-insulated straight through joints for 50sqmm cable
2
96
192.62
... More
Installation of Pre-insulated straight through joints for 70sqmm cable
6
96
577.86