Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala State Electricity Board - KSEB Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date27 Jan 2025
Closing Soon11 Feb 2025
Tender Amount₹ 83,08,906
Costs
EMD
₹ 50,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Construction Of 110kv Substation Kadampuzha-construction Of Yard Equipment Foundation, Fire Wall, Cable Trenches For Control And Power Cables For The Substation
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KSEB_729192_1Tender No
TDT /E Tender 18/24-25/22-01-25Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://http://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.
Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.
Ordinary or hard rock
41.25
722
-
... More
Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 m2 on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.
Medium Rock (blasting prohibited)
New Data derived from Item No.2.9.3
The soil condition is very hard latterate/rock like latterate, which may not possible to excavate with hydraulic excavator/manual.
134
1066
-
... More
Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 m2 on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.
Medium Rock (blasting prohibited)
New Data derived from Item No.2.9.3
The soil condition is very hard latterate/rock like latterate, which may not possible to excavate with hydraulic excavator/manual. Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.
Ordinary or hard rock
15
1258
-
... More
Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.
Hard rock (blasting prohibited)
134
1279
-
... More
Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.
Hard rock (blasting prohibited)
Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.
Ordinary or hard rock
15
1471
-
... More
Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
22
902
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
80
6857
-
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:
1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
300
9142
-
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
2
11022
-
... More
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
2.5
11564
-
... More
Centering and shuttering including strutting, etc. and removal of form for:
Foundations, footings, bases of columns, etc for mass concrete
2000
337
-
... More
Centering and shuttering including strutting, etc. and removal of form for:
Columns, Pillars, Piers, Abutments, Posts and Struts
22
869
-
... More
Centering and shuttering including strutting, etc. and removal of form for:
Lintels, beams, plinth beams, girders bressumers and cantilevers
41
653
-
... More
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Thermo - Mechanically Treated bars of grade Fe-500D or more
22800
98
-
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in:
Cement mortar 1:4 ( 1 cement : 4 coarse sand)
6
9249
-
... More
12 mm cement plaster of mix:
1:4 ( 1 cement : 4 fine sand)
320
316
-
... More
Stub setting of 110kV yard structures and equipment structures to lines and levels as per approved drawings and directions of departmental officers including arranging templates, grouting, anchoring, removing the template after completion, hire charges of all required tools and plants etc. complete
15
978
-
... More
Setting foundation bolts for equipment structures to lines and levels as per approved drawings and directions of departmental officers including arranging templates, grouting, anchoring, removing the template after completion, hire charges of all required tools and plants etc. complete
90
686
-
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
600
260
-
... More
Lifting, loading and proper placing of precast RCC slabs of various sizes (Thickness up to 10cm) by manual conveyance from casting yard to the trenches wherever necessary, safely without causing any damages to cables and slabs, placing neatly by levelling, aligning, removing waste particles from trench etc complete including hire charges for necessary tools etc complete as per direction of departmental officers at site.
70
200
-
... More
Providing and fixing expansion hold fasteners on C.C./R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete.
Fastener with threaded dia 12 mm
1150
65
-
... More
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
4597.92
155
-
... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:
Two or more coats on new work
175
143
-
... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
360
101
-
... More
White washing with white cement to give an even shade
100
82
-
... More
Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:
Two or more coats on new work
100
152
-
... More
Cutting 32mm MS rod in required length etc complete as per the direction of the departmental officers.
35
90
-
... More
Bending 32mm MS rod for crossing cable trench/foundations/risers etc complete as per the direction of the departmental officers.
Charges include the lifting of 32mm MS rod from stockyard to site, (Heat bending of rod is not allowed)
35
127
-
... More
Laying of earth mat of required size as specified using 32mm MS rod including levelling lowering and placing in trenches, complete as per the direction of departmental officers.
Charges include the lifting of 32mm MS rod from stockyard to site,
4
1047
-
... More
Welding of overlapping joints for mat,riser lap joints with 32mm MS rod placed in trenches, having 150mm in length 6mm in thick on both sides of the rod and both ends of overlapped MS rods with 6mm welding thickness after cleaning the surfaces neatly. Charges includes cost of low hydrogen DC electrode (No. E7018), hire charges of DC arc welding set and tools and plants required, current charges including labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of department officers.
35
772
-
... More
Welding the nodal points (cross joints ) in the trenches at two sides to a thickness of 6mm after cleaning the surface neatly. Charges includes cost of low hydrogen DC electrodes (No. E7018), hire charges of DC welding set and tools and plants required, current charges, labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of departmental officers.
25
362
-
... More
Supplying conveying erecting and placing in position 90 Lbs rail providing sufficient anchoring arrangements, keeping exact line and levels for transformer plinth as per direction of departmental oficers at site
540
113
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%