Kerala State Cooperative Federation For Fisheries Development Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Cooperative Federation For Fisheries Development Limited - MATSYAFED Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date19 Jan 2023
Closing Date28 Jan 2023
Tender Amount₹ 22,73,023 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
od268222/2022_2023 : Supplying and using good quality (tying) HDPE rope different dia including all cost of materials etc. complete.

64

-

-

... More
od268217/2022_2023 : Construction of bund for the division of pond using clay excavated from center of inside the pond (using manual or dredging in uniform depth) and finishing bund sides with top width 2m bottom width 4m average height 2.3m and both sides fixing with coconut pole/bamboo pole 60cm c/c vertical post cross tying and half cut bamboo three line fixing for vertical bamboo post, coir, velone net / plastic woven sackbags/hdpesheet etc. complete excluding cost of bamboo pole, coir, velone net,sack,sheet including all cost and labour etc. complete as directed by the officers of Matsyafed.

135

-

-

... More
PART A b) pond 4 bw sluice

-

-

-

... More
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil

7.65

-

-

... More
15.9.1 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortor

2.24

-

-

... More
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil

7.65

-

-

... More
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size

5.94

-

-

... More
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete

67.57

-

-

... More
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform

5.32

-

-

... More
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

741.12

-

-

... More
60.8 : Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete

14.3

-

-

... More
13.59 : Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.

5.94

-

-

... More
od266794/2022_2023 : Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead up to 50m and lift up to 1.5 m : All kind of soil

18

-

-

... More
od266795/2022_2023 : Conveying pre-cast slab, vertical post, bottom slab horizontal etc to the site and erecting in position in lines and level and form the sluice including hire charges of hydraulic excavator for conveying tools, chain and labour for loading the slab to the excavator and unloading at site, labour for erecting bottom and vertical slab to the line and level etc complete without any damage.

1

-

-

... More
PART B POND 3 bund

-

-

-

... More
od268218/2022_2023 : Supplying of bamboo pole (Kallanmula) size 4m length minimum dia of 8cm and above fixing 60cm c/c<br>including all cost of materials and labour etc. complete as directed by the officers of Matsyafed.

650

-

-

... More
od268221/2022_2023 : Supply and fixing HDPE Plastic Sackbag (kari chakku)/velone net of width 2m torn and woven along the bund side including all cost of materials, labour etc. complete as directed by the officers of Matsyafed.

200

-

-

... More
od268222/2022_2023 : Supplying and using good quality (tying) HDPE rope different dia including all cost of materials etc. complete.

60

-

-

... More
od268217/2022_2023 : Construction of bund for the division of pond using clay excavated from center of inside the pond (using manual or dredging in uniform depth) and finishing bund sides with top width 2m bottom width 4m average height 2.3m and both sides fixing with coconut pole/bamboo pole 60cm c/c vertical post cross tying and half cut bamboo three line fixing for vertical bamboo post, coir, velone net / plastic woven sackbags/hdpesheet etc. complete excluding cost of bamboo pole, coir, velone net,sack,sheet including all cost and labour etc. complete as directed by the officers of Matsyafed.

100

-

-

... More
PART B SLUICE

-

-

-

... More
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil

7.65

-

-

... More
15.9.1 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortor

2.24

-

-

... More
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil

7.65

-

-

... More
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size

5.94

-

-

... More
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete

67.57

-

-

... More
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform

5.32

-

-

... More
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

741.12

-

-

... More
60.8 : Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete

14.3

-

-

... More
13.59 : Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.

5.94

-

-

... More
od266794/2022_2023 : Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead up to 50m and lift up to 1.5 m : All kind of soil

18

-

-

... More
od266795/2022_2023 : Conveying pre-cast slab, vertical post, bottom slab horizontal etc to the site and erecting in position in lines and level and form the sluice including hire charges of hydraulic excavator for conveying tools, chain and labour for loading the slab to the excavator and unloading at site, labour for erecting bottom and vertical slab to the line and level etc complete without any damage.

1

-

-

... More
PART C a)POND 1 BUND

-

-

-

... More
od268217/2022_2023 : Construction of bund for the division of pond using clay excavated from center of inside the pond (using manual or dredging in uniform depth) and finishing bund sides with top width 2m bottom width 4m average height 2.3m and both sides fixing with coconut pole/bamboo pole 60cm c/c vertical post cross tying and half cut bamboo three line fixing for vertical bamboo post, coir, velone net / plastic woven sackbags/hdpesheet etc. complete excluding cost of bamboo pole, coir, velone net,sack,sheet including all cost and labour etc. complete as directed by the officers of Matsyafed.

130

-

-

... More
od268218/2022_2023 : Supplying of bamboo pole (Kallanmula) size 4m length minimum dia of 8cm and above fixing 60cm c/c<br>including all cost of materials and labour etc. complete as directed by the officers of Matsyafed.

796

-

-

... More
od268222/2022_2023 : Supplying and using good quality (tying) HDPE rope different dia including all cost of materials etc. complete.

62

-

-

... More
od268221/2022_2023 : Supply and fixing HDPE Plastic Sackbag (kari chakku)/velone net of width 2m torn and woven along the bund side including all cost of materials, labour etc. complete as directed by the officers of Matsyafed.

260

-

-

... More
Part C b)pond 1 sluice

-

-

-

... More
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil

7.65

-

-

... More
15.9.1 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortor

2.24

-

-

... More
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil

7.65

-

-

... More
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size

5.94

-

-

... More
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete

67.57

-

-

... More
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform

5.32

-

-

... More
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

741.12

-

-

... More
60.8 : Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete

14.3

-

-

... More
13.59 : Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.

5.94

-

-

... More
od266794/2022_2023 : Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead up to 50m and lift up to 1.5 m : All kind of soil

18

-

-

... More
od266795/2022_2023 : Conveying pre-cast slab, vertical post, bottom slab horizontal etc to the site and erecting in position in lines and level and form the sluice including hire charges of hydraulic excavator for conveying tools, chain and labour for loading the slab to the excavator and unloading at site, labour for erecting bottom and vertical slab to the line and level etc complete without any damage.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.