Kerala Road Fund Board Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala Road Fund Board Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date21 Jan 2025
Closing Soon28 Jan 2025
Tender Amount₹ 4,16,695 
Notes
Download

Costs

Summary

Kcrip Phase 2 Construction Of Mini Bypass Panathuthazham Flyover Planting Boundary Stones

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Establishing traverse control points with elevations on pillar of size 15cmX15cmX60cm M20 grade RCC pillar with a nail fixed on the top surface. The pillars shall be embedded in the concrete.Spacing 250 M apart as a bench mark - control pillar. The spacing shall be maximum 250 m apart . No seperate bench mark need to be established

64

-

-

... More
Taking classified traffic count at selected location for 3days 24 hours continuously by recording the classifed volume count in the prescribed format, including provision for engaging technicians and setting up of station etc. and compiling the data and submitting the same in hard and soft copy etc. complete as per the instructions of PWD officials.

4

-

-

... More
Conducting turning movement survey at junction for 3 day for peak hours (7am to 11 am and 3.30 pm to 7.30 pm) by recording the classifed volume count in the prescribed format, including provision for engaging technicians and setting up of station etc and compiling the data and submitting the same in hard and soft copy etc. complete as per the instructions of PWD officials.

3

-

-

... More
Conducting BENKELMAN BEAM DEFLECTION TEST consisting of taking deflection at 10points at 50m interval on one km stretch according to specification given in 81- 1997, number of test conducted is as directed by the engineer in charge- conducting laboratory test to get moisture content and soil classification as per IS standards - For arranging equipment for testing 1km test taking one and half hour - Calculating Charecteristic deflection of one test from one test data obtained from part 1 (one test data means comprising of taking deflecton at 10 points at 50m interval in 1km stretch according to the specification given in IRC81-1997) and submitting in hard and soft copy

11.5

-

-

... More
Study of pavement composition by cutting open pit at tar edge to get the details of layers (thickness and type ) of pavement composition - at one location as suggested by the engineer in charge carefully by excavating pit of area 1.00x 0.60m through overlaying bituminous and granular layer including BC, DBM/BM, WMM and GSB at tar edge and refilling and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officers at site and reporting the pavement composition with photographs and measurements specifying the type of layers

25

-

-

... More
12.4 Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days

2.25

-

-

... More
12.8B Plain /Reinforced cement concrete in open foundation complete as per drawing and techinal specification PCC grade M20 (with out form work)

0.75

-

-

... More
od26005/2017-2018: Data for inventory survey upto 12 meter wide road for survey work of collecting road inventories and recording in prescribed format attached based on chainage marking including marking chainage at 50m interval and taking details such as existing carriageway width,shoulder width, Type of shoulder ,width and location of approach road ,details of existing drains,culverts and bridges as given in the format attched,pavement conditions(details of potholes, raveling, fog seal,slurry seal edge damage etc)raod safety measures (details of road sign,crash barriers,guard stones,delineator post, hazard markers etc) and all other existing retaining structures in road,including documentation charges etc as per direction of the officers at site

11.5

-

-

... More
Collection of sub-grade soil sample at 500m interval carefully by excavating pit of area 1.0*0.6m through overlying bituminous and granular layer or from subgrade of formation area as directed by the engineer in charge for laboratory test and filling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officer at site.

25

-

-

... More
Conducting Soil Classification test, Modified Proctor Test,and CBR test as per the IS Code guidelines and making report of one soil sample

25

-

-

... More
56.1.a Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and emobilization after completing the work. For machine boring (For 9 boreholes)

1

-

-

... More
56.17.1 Providing access to the site, clearing site and making good for erecting and conducting soil testing tranfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing (for 5 bore holes).

45

-

-

... More
56.2.a Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.(for 5Bore holes)

5

-

-

... More
56.3.a.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals for ordinary soil In Land (for 5 Bore holes)

50

-

-

... More
56.3.b.1 Boring with rotary power drilling equipment's in all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals for ordinary soil

50

-

-

... More
56.3.c.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals for ordinary soil

50

-

-

... More
56.3.d.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.

75

-

-

... More
56.4: Boring through all type of hard rock or similar refusal strata of N value greater than 50 using dimond core drilling bit for in land under water and banks of river

15

-

-

... More
56.5.a Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit-In land

50

-

-

... More
56.7 Conducting standard penetration test in bore hole at any depth. (for 5 boreholes-23x5)

115

-

-

... More
56.8 Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.(for 5 boreholes-23x5)

115

-

-

... More
56.6 Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etccomplete.(at every 3 m interval) (Undisturbed soil samples (UDS) shall be obtained at every 3.0 m interval starting from 1.0 m in all type of soil along the bore depth up to SPT 'N' values of less than 50.Sampler shall be 75 mm/100 mm internal diameter and generally 450 mm long. Thin walled open drive sampler shall be used in cohesive strata. This sampler shall be made of seamless steel. Sampling shall be done as soon as possible after the clean-out operation. Area ratio of the sample must restrict to 20% for stiff formations & 10% or less for soft sensitive clays as per IS 1892-1979.)(5*15)

50

-

-

... More
56.11.a: Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) for 5 bore holes

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.