Kerala Road Fund Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala Road Fund Board - KRFB Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date12 Aug 2024
Closing Date23 Aug 2024
Tender Amount₹ 1,69,470
Costs
EMD
₹ 4,237Document Cost
₹ 555Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KRFB_680786_3Bid Award Id
ViewTender No
48/EE/KRFB-PMU/PTA/KTM/2024-25Tender Authority
Kerala Road Fund Board ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
OD73252/2024-2025:Hire and labour charges for engaging Excavator (back hoe) for excavating soil from choked up drain and lifting and removing the cut down branches from the road way immediately.
15
-
-
OD73253/2024-2025:Arranging tipper/truck for removal of debris, excavated waste etc away from site
2
-
-
OD73254/2024-2025:Hire and running charges of light crane
1
-
-
OD73255/2024-2025:Engaging Mazdoor for petty works, to drain off stagnant water along the sides of the road, clearing blocked culvert, drain manually as per requirement, levelling berms, for assist wood cutter&traffic control etc
16
-
-
OD73256/2024-2025:Engaging wood cutter for removing the branches of trees using chain saw
10
-
-
OD73257/2024-2025:Engaging power saw (chain saw) including hire of machine, cost of fuel,oil etc complete
2
-
-
OD73258/2024-2025:Supplying and fixing Reflective tapes on barricades and boards
14
-
-
OD73260/2024-2025:Engaging coolie for maintaining the safety boards and barricades properly
2
-
-
8.45:Provision of metal drum/empty bitumen drum delineator, 300 mm in diameter, 800 mm high, filled with earth for stability, painted in circumferential strips of alternate black and white 100 mm wide fitted with reflectors 3 Nos of 7.5 cm dia, all as per IRC:SP:55-2001
5
-
-
OD73261/2024-2025:Arranging pick up van for conveyance of shelmac to site
2
-
-
OD73366/2024-2025:Filling up potholes with Bituminous ready mix compound (25 Kg / bag) and compacting by ramming to get compact surface including cost of materials laying charges transportation to site etc complete. Assuming that an average of 30 bags of 25 kg ready mix compound will be laid in pot holes in a day.
30
-
-
12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br> PCC Grade M15 ( Without formwork) <br>
2.5
-
-
13.5.A:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M15 - Height upto 5m <br>
3.2
-
-
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>
1.5
-
-
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
0.07
-
-
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements