Kerala Road Fund Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 10,570Document Cost
₹ 935Tender Fee
Refer Documents
Summary
Kiifb-pre Monsoon Work 2-maintanence Of Roads Under Krfb Pmu Division Kasaragod- General Civil Work
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KRFB_680172_1Bid Award Id
ViewTender No
PWD/KR/TR/12013/2024_5_1_1/1Tender Authority
Kerala Road Fund Board ViewPurchaser Address
-Website
http://https://www.krfb.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
0.84
-
-
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
0.3
-
-
2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means
10.18
-
-
3.25.A:Construction of unlined surface drain of average cross sectional area 0.4 sqm in ordinary rock by Mechanical Means to specified lines, grades, levels and dimensions as per approved design and to the requirement of clause 301 to 309. Excavated material to be used in embankment at site
200
-
-
4.1.A.2:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-II - Plant Mix Method
12.3
-
-
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
12.2
-
-
3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)
750
-
-
OD78921/2024-2025:Engaging mazdoor for cutting branches of trees learned toward the road threatening to pedestrians and traffic and removal of fallen trees or branches on the road and clearing traffic blockage , stacking the wood at a suitable place as directed by the Engineer in charge.
71
-
-
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
470
-
-
OD78922/2024-2025:Engaging mazdoor wherever required for the removal of earth and other debris causing chocking of culvert and drains as per direction of Engineering in charge.
35
-
-
OD78923/2024-2025:Hiring in Tipper to shift slipped earth and rock materials to a suitable locations indicated by the department Engineer.
10
-
-
OD78924/2024-2025:Hiring Hydraulic Excavator 1cum bucket capacity to remove slipped earth and rock materials on the roads as per direction of Engineer in charge.
35
-
-
2.3.2.B:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of thorny jungle - By Mechanical Means
0.18
-
-
OD78925/2024-2025:Pothole filling during monsoon using cold ready mix bituminous compound (Adequacy 25 Kg (1 Bag) /1sqm of pot hole) including all charges for spreading , ramming and conveyance expenses etc , complete including all incidental charges.
48.05
-
-
2.1.3:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 900 mm to 1800 mm
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements