Kerala Road Fund Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala Road Fund Board - KRFB Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date10 Sep 2024
Closing Date27 Sep 2024
Tender Amount₹ 34,74,407
Costs
EMD
₹ 50,000Document Cost
₹ 2,760Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KRFB_690623_1Bid Award Id
ViewTender No
55/EE/KRFB-PMU/PTA/KTM/2024-25Tender Authority
Kerala Road Fund Board ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
OD34953/2024-2025:60.7.8. DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
68.08
-
-
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
91.86
-
-
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
18.36
-
-
OD34954/2024-2025:Dry rubble masonry for foundation and superstructure of retaining wall including cost conveyance and labour charges etc. complete.
179.55
-
-
OD124164/2024-2025:Back filling behind abutment, wing wall and return wall complete using suitable material as per the direction of departmental officers
108.3
-
-
13.10:Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
20
-
-
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>
17.25
-
-
14.1.A.1:Furnishing and Placing Reinforced Cement Concrete Grade M20 Using Concrete Mixer in super-structure as per drawing and Technical Specification
41.78
-
-
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
4.18
-
-
14.16:Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
23.3
-
-
Rectification of Base course (WMM), Providing Interlock and construction of Drain at ch: 2/300
-
-
-
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
0.19
-
-
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
43.5
-
-
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
618
-
-
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>
63.25
-
-
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5.5
-
-
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>
20.25
-
-
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>
7.43
-
-
12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br> PCC Grade M15 ( Without formwork) <br>
6.75
-
-
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
2.67
-
-
55.25:Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
6.77
-
-
OD111698/2024-2025:Gratings ( 1500mm x 600mm) of draining water to drain using 70x 70x 5mm angle channels as frame , 12mm square bars at 30mm spacing, 75x40x4.8mm C Channel section for support including material and labour charges as per the direction of departmental officers
6
-
-
3.25.B:Construction of unlined surface drain of average cross sectional area 0.4 sqm in ordinary rock by Manual Means to specified lines, grades, levels and dimensions as per approved design and to the requirement of clause 301 to 309. Excavated material to be used in embankment at site.<br>
17
-
-
Evaluation Notes How It Works ?