Kerala Maritime Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 28,700Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_KMB_634216_2Tender No
C1-2776/22Tender Authority
Kerala Maritime Board ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
od131/2022_2023
Dismantle the 10 hp slewing electric motor from its bed, taking the motor to repairing shop, dismantle the parts, cleaning, varnishing the stator and rotor coil windings, replace the damaged spares if any (The contractor should procure the spare parts required from the authorized dealer and submit the original dealer bill along with their bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced unserviceable/old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these unserviceable/old spares should be returned to dept for realization of payment), assemble the motor, return back, refitting and trial run all as per the directions of the departmental officers.
1
-
-
Gear box works
-
-
-
od137/2022_2023
Dismantle the luffing/hoist spur gearbox from its bed, taking the gearbox to repairing shop. overhaul the same replace the damaged spares if any (The contractor should procure the spare parts required from the authorised dealer and submit the original dealer bill along with their bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced unserviceable / old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these unserviceable / old spares should be returned to dept. for realisation of payment), assemble the gearbox, return back, refitting after procuring and filling SAE 90 or equivalent lubricating oil and trial run all as per the directions of the departmental officers.
2
-
-
od138/2022_2023
Dismantle the slewing gearbox from its bed, taking to repairing shop, overhaul the same replace the damaged spares if any (The contractor should procure the spare parts required from the authorised dealer and submit the original dealer bill along with their bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced unserviceable / old parts except consumable like O-rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these unserviceable
/old spares should be returned to dept. for realisation of payment), assemble the gearboxes, return back, refitting after procuring and filling SAE 90 or equivalent lubricating oil and trial run all as per the directions
of the departmental officers.
1
-
-
Dismantle of Slewing wheel assy.
-
-
-
od139/2022_2023
Dismantle the slewing wheel assembly of the crane, disassemble the parts, check all the parts and replace if required with other spares required (The contractor should procure/fabricate Gear oil Total the spare parts required and submit the bill along with their work bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced unserviceable / old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these unserviceable
/ old spares should be returned to dept. for realisation of payment) assemble the wheel assembly and fit
to the crane as per the directions of the departmental officers.
4
-
-
Dismantle of the kingpost assembly
-
-
-
od140/2022_2023
Dismantle the kingpost assembly of the crane by dismantling the balance parts, jib etc. and the base of the crane with the help of crane provided by the Department, check the king post bush and replace if required with other spares required (The contractor should procure well as the replaced unserviceable / old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these unserviceable / old spares should be returned to dept for realisation of payment) kept the spare parts required from the authorised dealer and submit the original dealer bill along with their bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as crane apart so as to move to the new location and assemble the kingpost assembly to the crane after relocating the crane in the new pedestal and trial run all as per the directions of the departmental officers.
1
-
-
Dismantling of the pinion shaft
-
-
-
od141/2022_2023
Dismantle the distorted pinion shaft and bracket recast / fabricate with existing / original material and machine a new bracket instead of the old one, check the bearings and replace or renew if required with other spares required and ensure no vibrations to the assembly by providing adequate support to the pinion bracket (The contractor should procure the spare parts required from the authorised dealer and submit the original dealer bill along with their bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced unserviceable / old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these unserviceable / old spares should be returned to dept. for realisation of payment) assemble the pinion shaft assembly to the crane and trial run all as per the directions of the departmental officers.
1
-
-
Overhauling of the brake system
-
-
-
od142/2022_2023
Overhauling of the brPake systemRof the luffinIg and hCoist brake uEnit by dismantling the spares, cleaning, replacing the damaged one if any (The contractor should procure the spare parts required from the authorised dealer and submit the original dealer bill along with their bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced unserviceable/old parts except consumable like O rings, rubber parts etc. should get inspected by the Engineer who is the in-charge of the work and these unserviceable/old spares should be returned to dept. for realisation of payment), refitting etc. all as per the directions of the departmental officers.
2
-
-
Steel Works
-
-
-
od143/2022_2023
Cutting and removing the old damaged, weakened, severely damaged various thickness ms plate/ ms flat/ ms angles/ ms rods/ beams/ girders etc. marked by dept. officers in various places of the crane without damaging any other portion/structures member on the crane as per the direction of departmental officers.
40
-
-
od144/2022_2023
Supplying and welding with new various thickness MS plate/MS angle/ MS flat/ MS rod/beam/ gazette of existing size and shape to the various portions on the crane already removed from the damaged portion of the crane after making into shape, V cut on the mating edge of the plate and welding on both sides together. The rate including the cost of materials, welding charges, tools, plants, scaffolding, other incidental expenses etc. complete as per the direction of departmental officers.
15
-
-
Electrical Works
-
-
-
od145/2022_2023
All the electrical connections in the control boxes, operator cabin, resistance boxes and other electrical installations without proper connectors is to be removed and modified by using connectors, replace the existing kitkat type damaged fuse carriers inside cabin panel with new one of HRC type 125 Ampere rating (The contractor should procure the connectors required from the authorised dealer if it is not available with the department and submit the original dealer bill along with their bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced unserviceable/ old parts should get inspected by the Engineer who is the in-charge of the work and these unserviceable/ old spares should be returned to dept. for realisation of payment. If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit) and arranging the wires properly all as per the directions of the departmental officers.
1
-
-
od146/2022_2023
Remove all the three controls of the crane and their contact points, check the conditions of the contacts and split rings, remove the damaged split rings and the contacts with new one supplied by the department (The contractor should procure the contacts, split rings etc. required from the authorised dealer if it is not available with the department and submit the original dealer bill along with their bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced unserviceable/ old parts should get inspected by the Engineer who is the in-charge of the work and these unserviceable/ old spares should be returned to dept. for realisation of payment. If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit), polish the control shaft unit for smooth surface contacts, all as per the directions of the departmental officers.
1
-
-
od147/2022_2023
Dismantle the hoist resistancebox, dismantle all the resistances from position, reset the resistance box should procure the spares, resistances, nuts, boltsetc. required from the authorised dealer if it is not and renewing resistances instead of the old broke, replace all the damaged spares (The contractor
available with the department and submit the original dealer bill along with their bill for its reimbursement.
15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying
the spares. These procured spares as well as the replaced unserviceable/ old parts should get inspected by the Engineer who is the in-charge of the work and these unserviceable/ old spares should be returned to dept. for realisation of payment. If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit) refit the same in position all as per the direction of departmental officers.
1
-
-
od148/2022_2023
Dismantle the luffing resistance box, dismantle all the resistances from position, reset the resistance box after renewing resistances instead of the old broke, replace all the damaged spares (The contractor should procure the spares, resistances, nuts, bolts etc. required from the authorised dealer if it is not available with the department and submit the original dealer bill along with their bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These procured spares as well as the replaced unserviceable/ old parts should get inspected by the Engineer who is the in-charge of the work and these unserviceable/ old spares should be returned to dept. for realisation of payment. If the spares are not available in market produce these items himself or its production should be arranged by the contractor. Cost of these items assessed by the Engineer is to be reimbursed with overhead of 15% as contractor's profit) refit the same in position all as per the direction of departmental officers.
1
-
-
od149/2022_2023
Dismantle the slewing resistance box, dismantle all the resistances from position, reset the resistance box after renewing resistances instead of the old broke, replace all the damaged spares (The contractor should procure the spares, resistances, nuts, bolts etc. required from the authorised dealer if it is not available with the department and submit the original dealer bill along with their bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging and supplying the spares. These 93 procured spares as well as the replaced unserviceable/ old parts should get inspected by the Engineer who is the in-charge of the work and these unserviceable/ old spares should be returned to dept for rePaliusabtiolnicofWpayomreknts. IfDthee pspaarretsmareenntot available in market produce these
items himself or its prPoduction shRould be arraInged byCthe contractEor. Cost of these items assessed by the
Engineer is to be reimbursed with overhead of 15% as contractor's profit) refit the same in position all as
per the direction of departmental officers.
1
-
-
od150/2022_2023
Provide Bimetal relay for the overload protection suitable for the motors of the crane with suitable fixture and connectors at the control panel, all as per the directions of the department officials.(the rate includes all the labour charges and cost of bimetal relay)
3
-
-
Crane Operator cabin Repair
-
-
-
od152/2022_2023
Modifying the existing operator cabin so as to view the operator to the crane hook by new best quality 1.6 mm thick GI sheet by using gas welding and sheet processing after replacing the existing damaged sheets as per the direction of the department officers.
10
-
-
od153/2022_2023
Operator cabin ceiling and side paneling to be made with best quality shuttering plywood (6 mm thick) after placing 12 mm thick thermo coal panel inside the ply wood as per the direction of departmental officers.
8
-
-
od156/2022_2023
Dismantle all the broken glass of the crane and provide a new toughened glass of existing size with
provision for sliding and locking and also provide new glass at the top of the operator cabin including the cost of beadings and channels all as per the directions of the departmental officers.
3
-
-
Roof Maintanence
-
-
-
12.1.1
Providing corrugate G.S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete ( up to any pitch in horizontal / vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required./br1.00 mm thick with zinc coating not less than 275 gm/m2
12
-
-
Chipping & Scrapping
-
-
-
od157/2022_2023
Chipping scrapping and cleaning the complete surface of the crane including machineries and other accessories as per the direction of dept. officers
150
-
-
Painting
-
-
-
od159/2022_2023
Supplying and painting with approved marine quality AC bituminous black paint (quality of entire quantity
of paint supply should be get inspected and approved by engineer, who is in charge of work before starting / continuation of the painting work) over the primer applied surface after cleaning the surface as
per the direction of department officers.
50
-
-
od160/2022_2023
Supplying and painting with approved marine synthetic enamel paint of existing colour 2 coats (quality of entire quantity of marine synthetic enamel supply should be get inspected and approved by engineer, who is in-charge of work before starting / continuation of the painting work) over the primer coat already done on crane body, machineries and other accessories etc. as per the direction and satisfaction of departmental officers.
100
-
-
13.50.3
Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron /steel works
150
-
-
13.50.4
Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat)
150
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements