Kerala Land Development Corporation Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala Land Development Corporation Limited - KLDC Tender
Eprocure
Opening Date18 Jan 2019
Closing Date28 Jan 2019
Tender Amount₹ 3,31,12,538
Costs
EMD
₹ 1,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Nabard Ridf Xix Infrastructural Development Works In Kole Wet Lands In Thrissur And Malappuram Districts. Improvements To Narani Puzha Kummipalam Kole Padavu Including Construction Of Sluices 2 Nos In Ponnani Taluk Re-tender
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_KLDC_261918_1Bid Award Id
ViewTender No
KLDC/TSR/2018-19/9(4)Tender Authority
Kerala Land Development Corporation Limited ViewPurchaser Address
-Website
http://enders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Grassing with selection No.1 grass including watering and maintenance of the lawn for 60 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for seperately) . With grass Turf
19250
-
-
... More
Providing and laying non-pressure NP2 class (light duty) R.C.C pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand ) including testing of joints etc, complete : 300mm dia RCC pipe
60
-
-
... More
Providing and laying non-pressure NP2 class (light duty) R.C.C pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand ) including testing of joints etc, complete : 600mm dia RCC pipe
60
-
-
... More
2 APPENDIX B - Sluice - 2 nos. - RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in two rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete.
60
-
-
... More
Bailing out water using pump above 5HP and upto 10HP - Bailing out water with engine and pump set above 5HP and upto 10HP, including conveyance to site and erection, cost of fuel, lubrication oil and other stores, pay of staff etc complete.
240
-
-
... More
Earthwork in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil
412.85
-
-
... More
Extra for every additional lift 1.5m or part there of in excavation/ banking excavated or stacked materials. All kinds of soil
122.85
-
-
... More
Extra for every additional lift 1.5m or part there of in excavation/ banking excavated or stacked materials. Ordinary or hard rock
447.69
-
-
... More
Centering and shuttering including strutting, propping etc and removal of form work for : Foundations, footing, bases for columns
295.94
-
-
... More
Providing and laying in position cement concrete of specified grade, excluding the cost of centering and shuttering - All work upto plinth level 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)
26.28
-
-
... More
Filling with quarry muck- Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, levelling the top at site and consolidation by ramming, etc. complete for improving the CBR value of subgrade.
61.05
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size)
61.05
-
-
... More
Providing and laying in position cement concrete of specified grade, excluding the cost of centering and shuttering - All work upto plinth level 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)
109.2
-
-
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level 1:1.5:3 (1 Cement : 1.5coarse sand : 3 graded stone aggregate 20mm nominal size)
4.55
-
-
... More
Steel Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete upto plinth level, Thermo - Mechanically Treated Bars of grade Fe-500D or more
8284.92
-
-
... More
Centering and shuttering including strutting, etc, and removal of form for:Walls (any thickness) including attatched pilasters, buttresses, plinth and string courses etc.
261.09
-
-
... More
Centering and shuttering including strutting, etc and removal of form for : suspended floors, roofs, landings, balconies and accesss platform
18.7
-
-
... More
Shutter for check dams-supplying and providing Thambhakam wood shutter planks 5cm thick including cost of materials and labour charges etc complete.
133
-
-
... More
Locking arrangements - Supplying and fixing lock and locking arrangements with suitable chain hooks, and pad lock of 65mm size.
4
-
-
... More
Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively
77.22
-
-
... More
Clearing grass and removal of the rubbish upto a distance of 50m outside the periphery of the area cleared.
230
-
-
... More
Filling available excavaed earth (excluding rock) in trenches, plinth sides of foundation etc, in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming & watering, lead upto 50m & lift upto 1.5m.
69.83
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements